Software engineering is a disciplined approach for constructing information systems through the use of common methods,techniques,or tools.
Use Space or
up arrow
down arrow
to flip the card.
Question
The testing phase takes all the detailed design documents from the design phase and transforms them into the actual system.
Question
Business requirements include the process of transferring information from a legacy system to a new system.
Question
Object-oriented languages provide a programming method that provides for interactive modules to a website.
Question
Conversion modifies software to meet specific user or business requirements.
Question
The planning phase establishes a high-level plan of the intended project and determines project goals.
Question
In the analysis phase the firm analyzes its end-user business requirements and refines project goals into defined functions and operations of the intended system.
Question
The analysis phase establishes descriptions of the desired features and operations of the system including screen layouts,business rules,process diagrams,pseudo code,and other documentation.
Question
Requirements management is the process of managing changes to the business requirements throughout the project.
Question
Scripting languages group data and corresponding processes into objects.
Question
Conversion occurs when a person or event is the catalyst for implementing major changes for a system to meet business changes.
Question
A requirements definition document prioritizes all of the business requirements by order of importance to the company.
Question
Projects are typically dynamic in nature,and change should be expected and anticipated for successful project completion.
Question
The systems development life cycle (SDLC)is the overall process for developing information systems,from planning and analysis through implementation and maintenance.
Question
Control objects for information and related technology (COBIT)is a set of best practices that helps an organization to maximize the benefits of an information system,while at the same time establishing appropriate controls to ensure minimum errors.
Question
Software engineers use computer-aided software engineering (CASE)software tools provide automated support for the development of the system.
Question
Business requirements are the specific business requests the system must meet to be successful,so the analysis phase is critical because business requirements drive the entire systems development effort.
Question
Off-the-shelf application software supports general business processes and does not require any specific software customization to meet the organization's needs.
Question
Sign-off is the users' actual signatures indicating they approve all of the business requirements.
Question
Brainstorming is a technique for generating ideas by encouraging participants to offer as many ideas as possible in a short period without any analysis until all the ideas have been exhausted.
Question
Pilot implementation installs the new system in phases (for example by department)until it is verified that it works correctly.
Question
Corrective maintenance makes system changes to repair design flaws,coding errors,or implementation issues.
Question
User acceptance testing tests individual units or pieces of code for a system.
Question
Bugs are defects in the code of an information system.
Question
Alpha testing occurs when programmers test the system to ensure it is bug-free.
Question
Online training runs over the Internet or on a CD or DVD,and employees complete the training on their own time at their own pace.
Question
Detailed user documentation is created that highlights how to use the system and how to troubleshoot issues or problems.
Question
Development Testing assess if the entire system meets the design requirements of the users.
Question
The development phase brings all the project pieces together into a special testing environment to eliminate errors and bugs,and verify that the system meets all the business requirements defined in the analysis phase.
Question
Pilot implementation is a small group of people use the new system until it is verified that it works correctly then the remaining users migrate.
Question
Unit testing uses both the legacy system and new system until all users verifies that the new system functions correctly.
Question
Integration testing verifies that the units or pieces of code function correctly when integrated together.
Question
User acceptance testing (UAT)determines if the system satisfies the user and business requirements.
Question
Fourth-generation languages (4GL)are programming languages that look similar to human languages.For example,a typical 4GL command might state,"FIND ALL RECORDS WHERE NAME IS "SMITH"."
Question
Development testing verifies that separate systems can work together passing data back and forth correctly.
Question
Help desk or a group of people who respond to users questions.
Question
Plunge implementation discards the legacy system completely and immediately migrates all users to the new system.
Question
Training is also provided for the system users and can be online or in a classroom.
Question
Workshop training is held in a classroom environment and led by an instructor.
Question
Test conditions detail the steps the system must perform along with the expected result of each step in the implementation phase the organization places the system into production so users can begin to perform actual business operations with it.
Question
Post-implementation reports are formal reports or audits of a project after it is up-and-running.
Question
Exception reports organize and categorize data for managerial perusal.
Question
Discovery prototyping builds a small-scale representation or working model of the system to ensure it meets the user and business requirements.
Question
Information systems audit reports assess a company's information system to determine necessary changes and to help ensure the information systems' availability,confidentiality,and integrity.
Question
Internal reports present data that is distributed inside the organization and is intended for employees within an organization.Internal reports typically support day-to-day operations monitoring that supports managerial decision making.
Question
Scrum methodology,uses small teams to produce small pieces of software using a series of "sprints," or 30-day intervals,to achieve an appointed goal.
Question
Project deliverables represent key dates when a certain group of activities must be performed.
Question
Project milestones are any measurable,tangible,verifiable outcome,result,or item that is produced to complete a project or part of a project.
Question
Preventing liabilities is a business-related consequence of failed software.
Question
The implementation phase involves taking all of the detailed design documents from the design phase and transforming them into the actual system.
Question
A communication plan defines the how,what,when,and who regarding the flow of project information to stakeholders and is key for managing expectations.
Question
The traditional waterfall methodology is a sequential,activity-based process in which each phase in the SDLC is performed sequentially from planning through implementation and maintenance.
Question
Corrective maintenance makes system changes to reduce the chance of future system failure.
Question
Preventative maintenance makes system changes to reduce the chance of future system failure.
Question
Detailed internal reports present information with little or no filtering or restrictions of the data.
Question
Information system control reports ensure the reliability of information,consisting of policies and their physical implementation,access restrictions,or recordkeeping of actions and transactions.
Question
Rational unified process (RUP)methodology,owned by IBM,provides a framework for breaking down the development of software into four "gates."
Question
Summary internal reports highlight situations occurring outside of the normal operating range for a condition or standard.
Question
The executive sponsor is the person or group who provides the financial resources for the project.
Question
A prototype is a smaller-scale representation or working model of the users' requirements or a proposed design for an information system.
Question
Gantt charts define dependency between project tasks before those tasks are scheduled.
Question
Project constraints are factors considered to be true,real,or certain without proof or demonstration.
Question
Responsibility matrix defines all project roles and indicates what responsibilities are associated with each role.
Question
A kill switch is a trigger that enables a project manager to close the project before completion.
Question
In the past,outsourcing was often used tactically,as a quick-fix,short-term solution to a particular need or problem which did not form part of an overall business strategy.
Question
A dependency is a logical relationship that exists between the project tasks,or between a project task and a milestone.
Question
The Project Management Office (PMO)is an internal department that oversees all organizational projects.
Question
The project requirements document defines the specifications for product/output of the project and is key for managing expectations,controlling scope,and completing other planning efforts.
Question
In-sourcing is an arrangement by which one organization provides a service or services for another organization that chooses not to perform them in-house.
Question
The project managers are individuals and organizations actively involved in the project or whose interests might be affected as a result of project execution or project completion.
Question
A project objective is any measurable,tangible,verifiable outcome,result,or item that is produced to complete a project or part of a project.
Question
A Gantt chart is a graphical network model that depicts a project's tasks and the relationships between them.
Question
A Pert chart is a simple bar chart that lists project tasks vertically against the project's time frame,listed horizontally.
Question
Status report periodic reviews of actual performance versus expected performance.
Question
Project scope statement links the project to the organization's overall business goals.It describes the business need (the problem the project will solve)and the justification,requirements,and current boundaries for the project.
Question
The critical path estimates the shortest path through the project ensuring all critical tasks are completed from start to finish.
Question
Project assumptions represent key dates when a certain group of activities must be performed.
Question
Project assumptions are specific factors that can limit options including budget,delivery dates,available skilled resources,and organizational policies.
Question
Project objectives are quantifiable criteria that must be met for the project to be considered a success.
Question
Outsourcing is a common approach using the professional expertise within an organization to develop and maintain the organization's information technology systems.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/289
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 9: Systems Development and Project Management: Corporate Responsibility
1
Software engineering is a disciplined approach for constructing information systems through the use of common methods,techniques,or tools.
True
2
The testing phase takes all the detailed design documents from the design phase and transforms them into the actual system.
True
3
Business requirements include the process of transferring information from a legacy system to a new system.
False
4
Object-oriented languages provide a programming method that provides for interactive modules to a website.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
5
Conversion modifies software to meet specific user or business requirements.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
6
The planning phase establishes a high-level plan of the intended project and determines project goals.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
7
In the analysis phase the firm analyzes its end-user business requirements and refines project goals into defined functions and operations of the intended system.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
8
The analysis phase establishes descriptions of the desired features and operations of the system including screen layouts,business rules,process diagrams,pseudo code,and other documentation.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
9
Requirements management is the process of managing changes to the business requirements throughout the project.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
10
Scripting languages group data and corresponding processes into objects.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
11
Conversion occurs when a person or event is the catalyst for implementing major changes for a system to meet business changes.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
12
A requirements definition document prioritizes all of the business requirements by order of importance to the company.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
13
Projects are typically dynamic in nature,and change should be expected and anticipated for successful project completion.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
14
The systems development life cycle (SDLC)is the overall process for developing information systems,from planning and analysis through implementation and maintenance.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
15
Control objects for information and related technology (COBIT)is a set of best practices that helps an organization to maximize the benefits of an information system,while at the same time establishing appropriate controls to ensure minimum errors.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
16
Software engineers use computer-aided software engineering (CASE)software tools provide automated support for the development of the system.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
17
Business requirements are the specific business requests the system must meet to be successful,so the analysis phase is critical because business requirements drive the entire systems development effort.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
18
Off-the-shelf application software supports general business processes and does not require any specific software customization to meet the organization's needs.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
19
Sign-off is the users' actual signatures indicating they approve all of the business requirements.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
20
Brainstorming is a technique for generating ideas by encouraging participants to offer as many ideas as possible in a short period without any analysis until all the ideas have been exhausted.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
21
Pilot implementation installs the new system in phases (for example by department)until it is verified that it works correctly.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
22
Corrective maintenance makes system changes to repair design flaws,coding errors,or implementation issues.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
23
User acceptance testing tests individual units or pieces of code for a system.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
24
Bugs are defects in the code of an information system.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
25
Alpha testing occurs when programmers test the system to ensure it is bug-free.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
26
Online training runs over the Internet or on a CD or DVD,and employees complete the training on their own time at their own pace.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
27
Detailed user documentation is created that highlights how to use the system and how to troubleshoot issues or problems.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
28
Development Testing assess if the entire system meets the design requirements of the users.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
29
The development phase brings all the project pieces together into a special testing environment to eliminate errors and bugs,and verify that the system meets all the business requirements defined in the analysis phase.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
30
Pilot implementation is a small group of people use the new system until it is verified that it works correctly then the remaining users migrate.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
31
Unit testing uses both the legacy system and new system until all users verifies that the new system functions correctly.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
32
Integration testing verifies that the units or pieces of code function correctly when integrated together.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
33
User acceptance testing (UAT)determines if the system satisfies the user and business requirements.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
34
Fourth-generation languages (4GL)are programming languages that look similar to human languages.For example,a typical 4GL command might state,"FIND ALL RECORDS WHERE NAME IS "SMITH"."
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
35
Development testing verifies that separate systems can work together passing data back and forth correctly.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
36
Help desk or a group of people who respond to users questions.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
37
Plunge implementation discards the legacy system completely and immediately migrates all users to the new system.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
38
Training is also provided for the system users and can be online or in a classroom.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
39
Workshop training is held in a classroom environment and led by an instructor.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
40
Test conditions detail the steps the system must perform along with the expected result of each step in the implementation phase the organization places the system into production so users can begin to perform actual business operations with it.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
41
Post-implementation reports are formal reports or audits of a project after it is up-and-running.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
42
Exception reports organize and categorize data for managerial perusal.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
43
Discovery prototyping builds a small-scale representation or working model of the system to ensure it meets the user and business requirements.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
44
Information systems audit reports assess a company's information system to determine necessary changes and to help ensure the information systems' availability,confidentiality,and integrity.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
45
Internal reports present data that is distributed inside the organization and is intended for employees within an organization.Internal reports typically support day-to-day operations monitoring that supports managerial decision making.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
46
Scrum methodology,uses small teams to produce small pieces of software using a series of "sprints," or 30-day intervals,to achieve an appointed goal.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
47
Project deliverables represent key dates when a certain group of activities must be performed.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
48
Project milestones are any measurable,tangible,verifiable outcome,result,or item that is produced to complete a project or part of a project.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
49
Preventing liabilities is a business-related consequence of failed software.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
50
The implementation phase involves taking all of the detailed design documents from the design phase and transforming them into the actual system.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
51
A communication plan defines the how,what,when,and who regarding the flow of project information to stakeholders and is key for managing expectations.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
52
The traditional waterfall methodology is a sequential,activity-based process in which each phase in the SDLC is performed sequentially from planning through implementation and maintenance.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
53
Corrective maintenance makes system changes to reduce the chance of future system failure.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
54
Preventative maintenance makes system changes to reduce the chance of future system failure.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
55
Detailed internal reports present information with little or no filtering or restrictions of the data.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
56
Information system control reports ensure the reliability of information,consisting of policies and their physical implementation,access restrictions,or recordkeeping of actions and transactions.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
57
Rational unified process (RUP)methodology,owned by IBM,provides a framework for breaking down the development of software into four "gates."
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
58
Summary internal reports highlight situations occurring outside of the normal operating range for a condition or standard.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
59
The executive sponsor is the person or group who provides the financial resources for the project.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
60
A prototype is a smaller-scale representation or working model of the users' requirements or a proposed design for an information system.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
61
Gantt charts define dependency between project tasks before those tasks are scheduled.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
62
Project constraints are factors considered to be true,real,or certain without proof or demonstration.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
63
Responsibility matrix defines all project roles and indicates what responsibilities are associated with each role.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
64
A kill switch is a trigger that enables a project manager to close the project before completion.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
65
In the past,outsourcing was often used tactically,as a quick-fix,short-term solution to a particular need or problem which did not form part of an overall business strategy.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
66
A dependency is a logical relationship that exists between the project tasks,or between a project task and a milestone.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
67
The Project Management Office (PMO)is an internal department that oversees all organizational projects.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
68
The project requirements document defines the specifications for product/output of the project and is key for managing expectations,controlling scope,and completing other planning efforts.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
69
In-sourcing is an arrangement by which one organization provides a service or services for another organization that chooses not to perform them in-house.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
70
The project managers are individuals and organizations actively involved in the project or whose interests might be affected as a result of project execution or project completion.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
71
A project objective is any measurable,tangible,verifiable outcome,result,or item that is produced to complete a project or part of a project.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
72
A Gantt chart is a graphical network model that depicts a project's tasks and the relationships between them.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
73
A Pert chart is a simple bar chart that lists project tasks vertically against the project's time frame,listed horizontally.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
74
Status report periodic reviews of actual performance versus expected performance.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
75
Project scope statement links the project to the organization's overall business goals.It describes the business need (the problem the project will solve)and the justification,requirements,and current boundaries for the project.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
76
The critical path estimates the shortest path through the project ensuring all critical tasks are completed from start to finish.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
77
Project assumptions represent key dates when a certain group of activities must be performed.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
78
Project assumptions are specific factors that can limit options including budget,delivery dates,available skilled resources,and organizational policies.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
79
Project objectives are quantifiable criteria that must be met for the project to be considered a success.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
80
Outsourcing is a common approach using the professional expertise within an organization to develop and maintain the organization's information technology systems.
Unlock Deck
Unlock for access to all 289 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 289 flashcards in this deck.