Deck 12: Project Supply Chain Management

Full screen (f)
exit full mode
Question
Buying from an outside supplier to meet project needs is a practice that is rarely used,because it invariably proves to be more expensive than obtaining materials and services internally.
Use Space or
up arrow
down arrow
to flip the card.
Question
One of the important factors that should influence the selection of contract type is the degree of risk for the seller and the buyer that each contract type contains.
Question
Outputs of Plan Procurement Management include the procurement management plan and procurement statement of work.
Question
Among the disadvantages associated with outsourcing is the gradual loss of special skills for doing some specific activities that have been outsourced.
Question
The evaluation criteria developed during procurement planning should guide the vendor evaluation and selection.
Question
A project organization can serve as either the buyer or the seller in a project related contract.
Question
Contract incentives are often used when the buyer wants to maximize some aspect of performance,such as finishing the project early or providing a higher level of quality.
Question
During procurement planning,the project team determines which needs can best be met by acquiring products and services from an outside provider,and which can be accomplished by the team.
Question
In many cases,the proposal prepared by the vendor becomes a part of the final contract.
Question
Logistics is the work required to move and position inventory throughout a supply chain.
Question
A contract is a unilateral document that obligates the seller to provide specified products and services under terms agreeable to the buyer.
Question
Fixed price contracts provide low risk for the seller,since the buyer will pay a fixed price,regardless of how much the project actually costs the seller.
Question
Lean purchasing refers to a manufacturing context where just-in-time (JIT)tools are used to ensure that every step in the supply process adds value,while costs are kept to a minimum.
Question
Traditional project procurement was characterized by win / lose adversarial relations between owner and contractor,whereas contemporary project partnering fosters a relationship of trust and collaboration.
Question
Project partnerships can be advantageous to both the client and the vendor,in terms of improved project execution,flexibility,and reduced bid administration.
Question
On complex projects,despite the importance of factors such as technical capability,managerial capability and previous experience; the selection decision is made mostly or entirely on price.
Question
Supply chain operations require managerial processes that span across functional areas within individual organizations,and link trading partners and customers across organizational boundaries.
Question
Extensive supplier evaluation approaches such as surveys,facility visits and financial analysis should be applied to first-tier suppliers only.
Question
Supply chain management focuses exclusively upon the parties directly involved in providing supplies to the project team.
Question
Effective project partnerships generally require shared responsibilities,shared resources,shared information,shared rights and shared risks between suppliers and customers.
Question
All of the following accurately describe the features and characteristics of a contract EXCEPT:

A) A contract binds both the seller and the buyer.
B) A contract obligates the seller to provide a specified product or service.
C) A contract obligates the buyer to pay for a specified product or service.
D) The project organization is always a buyer in a contract arrangement
Question
All of these are factors that could lead to a decision to buy or outsource rather than make or perform in-house,EXCEPT:

A) flexibility in procurement
B) ability to use specialized suppliers
C) inadequate capacity
D) more control over quality and time
Question
Supply chains use a combination of modes of transportation including: air,rail,water,pipeline and truck.
Question
All of the following entities are typically included in the supply chain EXCEPT:

A) suppliers
B) public relations
C) consumers
D) project team
Question
Information is a key ingredient at each stage of the project supply chain,as well as within each phase of supply chain decision making.
Question
All of the following statements accurately describe supply chain management EXCEPT:

A) It is a closed-loop system solely within the project organization's boundaries
B) It spans across suppliers,resellers,project organizations and consumers.
C) It addresses the flow of products,information and funds.
D) It is a system approach to managing the entire flow of physical products.
Question
The PMBOK process of documenting project procurement decisions,specifying the approach and identifying potential sellers is known as:

A) Define supply chain.
B) Plan procurement management.
C) Schedule procurements.
D) Negotiate contracts
Question
All of the following factors are commonly used to assess potential suppliers pursuant to a source selection decision EXCEPT:

A) supply quality
B) personal relationships with senior management
C) inbound transportation cost
D) replenishment lead time
Question
Which party to a contract absorbs the preponderance of cost risk when a Firm-Fixed-Price (FFP)contract is used?

A) the seller
B) the buyer
C) the cost risk is equally shared.
D) the insurer
Question
The procurement management plan:

A) describes how the procurement division will be managed.
B) describes how supply chain partners will be managed.
C) describes how a project team will acquire goods and services from outside the performing organization.
D) describes how sellers will be audited by the procurement team.
Question
Which of the following contract types is most appropriate when costs are NOT well known and the buyer absorbs all of the cost risk?

A) Firm-Fixed-Price (FFP)
B) Fixed-Price-Incentive-Firm (FPIF)
C) Cost-Plus-Fixed-Fee (CPFF)
D) Time and Material (T&M)
Question
Which of the following is one of the PMBOK Guide's four project procurement management processes?

A) Conduct procurements
B) Perform configuration management
C) Conduct contract reviews
D) Perform value engineering
Question
Project partnerships offer all of the following advantages to vendors EXCEPT:

A) there is a more dependable stream of work
B) the expected outcome is clearly stated
C) the buyer gains at the vendor's expense
D) greater potential profit
Question
A description of the procurement item in sufficient detail to allow prospective sellers to determine if they are capable of providing the products,services or results is known as:

A) the contract clauses and special provisions
B) the procurement statement of work
C) the supply invoice
D) the purchase order
Question
Which of the following factors should be considered when a project team evaluates a "make or buy" decision to procure services?

A) prevailing public opinion regarding the economic impact of outsourcing
B) only the direct costs associated with the decision,excluding consideration of indirect costs
C) advantages and disadvantages of outsourcing in terms of time,cost and performance control
D) project manager's or sponsor's preference
Question
Which of the following types of contracts involves payment to the seller for the seller's actual costs plus a fee typically representing the seller's profit?

A) fixed-price contract
B) cost-reimbursable contract
C) equitable adjustment contract
D) direct cost contract
Question
Often a project team will start the selection process by establishing a list of potential suppliers.All of the following information sources are frequently used to identify these potential suppliers EXCEPT:

A) supplier catalogs or websites
B) sales personnel
C) stakeholder register
D) trade shows
Question
Which of the following terms describes a method for transforming contractual arrangements into a cohesive,collaborative project team with a single set of goals and established dispute resolution procedures?

A) a contract unification plan
B) partnering
C) arbitration
D) conflict resolution
Question
All of the following items are generally considered when selecting the right type of contract EXCEPT:

A) extent of price competition
B) overall degree of cost and schedule risk
C) urgency of requirements
D) project organization's accounting system
Question
Evaluations of prospective suppliers by project teams often involve all of the following approaches EXCEPT:

A) financial condition analysis
B) facility visits
C) supplier surveys
D) prototyping
Question
Compare and contrast traditional project procurement management with the more contemporary approach - project partnering.What are the conditions or sharing requirements for effective project partnerships?
Question
Contract types are often associated with two broad categories: fixed-price contracts and cost-reimbursable contracts.Briefly identify the factors to consider when determining which type is most appropriate for a planned contract.
Question
Project managers must frequently decide whether to obtain needed products and services from internal sources or from external sources.This decision is often referred to as the "make or buy" decision.Briefly identify and explain at least three reasons that support the decision to "make" the products and at least three reasons that support the decision to "buy" the products.
Question
Project partnerships offer which of the following advantages to both clients and vendors?

A) shared motivation
B) potential of lower cost for client
C) potential of greater profit for vendor
D) opportunity for vendor to prove oneself
Question
According to the PMBOK Guide,the project procurement management knowledge area includes four processes.Identify and briefly describe each of these processes.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/45
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 12: Project Supply Chain Management
1
Buying from an outside supplier to meet project needs is a practice that is rarely used,because it invariably proves to be more expensive than obtaining materials and services internally.
False
2
One of the important factors that should influence the selection of contract type is the degree of risk for the seller and the buyer that each contract type contains.
True
3
Outputs of Plan Procurement Management include the procurement management plan and procurement statement of work.
True
4
Among the disadvantages associated with outsourcing is the gradual loss of special skills for doing some specific activities that have been outsourced.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
5
The evaluation criteria developed during procurement planning should guide the vendor evaluation and selection.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
6
A project organization can serve as either the buyer or the seller in a project related contract.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
7
Contract incentives are often used when the buyer wants to maximize some aspect of performance,such as finishing the project early or providing a higher level of quality.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
8
During procurement planning,the project team determines which needs can best be met by acquiring products and services from an outside provider,and which can be accomplished by the team.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
9
In many cases,the proposal prepared by the vendor becomes a part of the final contract.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
10
Logistics is the work required to move and position inventory throughout a supply chain.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
11
A contract is a unilateral document that obligates the seller to provide specified products and services under terms agreeable to the buyer.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
12
Fixed price contracts provide low risk for the seller,since the buyer will pay a fixed price,regardless of how much the project actually costs the seller.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
13
Lean purchasing refers to a manufacturing context where just-in-time (JIT)tools are used to ensure that every step in the supply process adds value,while costs are kept to a minimum.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
14
Traditional project procurement was characterized by win / lose adversarial relations between owner and contractor,whereas contemporary project partnering fosters a relationship of trust and collaboration.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
15
Project partnerships can be advantageous to both the client and the vendor,in terms of improved project execution,flexibility,and reduced bid administration.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
16
On complex projects,despite the importance of factors such as technical capability,managerial capability and previous experience; the selection decision is made mostly or entirely on price.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
17
Supply chain operations require managerial processes that span across functional areas within individual organizations,and link trading partners and customers across organizational boundaries.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
18
Extensive supplier evaluation approaches such as surveys,facility visits and financial analysis should be applied to first-tier suppliers only.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
19
Supply chain management focuses exclusively upon the parties directly involved in providing supplies to the project team.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
20
Effective project partnerships generally require shared responsibilities,shared resources,shared information,shared rights and shared risks between suppliers and customers.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
21
All of the following accurately describe the features and characteristics of a contract EXCEPT:

A) A contract binds both the seller and the buyer.
B) A contract obligates the seller to provide a specified product or service.
C) A contract obligates the buyer to pay for a specified product or service.
D) The project organization is always a buyer in a contract arrangement
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
22
All of these are factors that could lead to a decision to buy or outsource rather than make or perform in-house,EXCEPT:

A) flexibility in procurement
B) ability to use specialized suppliers
C) inadequate capacity
D) more control over quality and time
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
23
Supply chains use a combination of modes of transportation including: air,rail,water,pipeline and truck.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
24
All of the following entities are typically included in the supply chain EXCEPT:

A) suppliers
B) public relations
C) consumers
D) project team
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
25
Information is a key ingredient at each stage of the project supply chain,as well as within each phase of supply chain decision making.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
26
All of the following statements accurately describe supply chain management EXCEPT:

A) It is a closed-loop system solely within the project organization's boundaries
B) It spans across suppliers,resellers,project organizations and consumers.
C) It addresses the flow of products,information and funds.
D) It is a system approach to managing the entire flow of physical products.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
27
The PMBOK process of documenting project procurement decisions,specifying the approach and identifying potential sellers is known as:

A) Define supply chain.
B) Plan procurement management.
C) Schedule procurements.
D) Negotiate contracts
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
28
All of the following factors are commonly used to assess potential suppliers pursuant to a source selection decision EXCEPT:

A) supply quality
B) personal relationships with senior management
C) inbound transportation cost
D) replenishment lead time
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
29
Which party to a contract absorbs the preponderance of cost risk when a Firm-Fixed-Price (FFP)contract is used?

A) the seller
B) the buyer
C) the cost risk is equally shared.
D) the insurer
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
30
The procurement management plan:

A) describes how the procurement division will be managed.
B) describes how supply chain partners will be managed.
C) describes how a project team will acquire goods and services from outside the performing organization.
D) describes how sellers will be audited by the procurement team.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
31
Which of the following contract types is most appropriate when costs are NOT well known and the buyer absorbs all of the cost risk?

A) Firm-Fixed-Price (FFP)
B) Fixed-Price-Incentive-Firm (FPIF)
C) Cost-Plus-Fixed-Fee (CPFF)
D) Time and Material (T&M)
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
32
Which of the following is one of the PMBOK Guide's four project procurement management processes?

A) Conduct procurements
B) Perform configuration management
C) Conduct contract reviews
D) Perform value engineering
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
33
Project partnerships offer all of the following advantages to vendors EXCEPT:

A) there is a more dependable stream of work
B) the expected outcome is clearly stated
C) the buyer gains at the vendor's expense
D) greater potential profit
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
34
A description of the procurement item in sufficient detail to allow prospective sellers to determine if they are capable of providing the products,services or results is known as:

A) the contract clauses and special provisions
B) the procurement statement of work
C) the supply invoice
D) the purchase order
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
35
Which of the following factors should be considered when a project team evaluates a "make or buy" decision to procure services?

A) prevailing public opinion regarding the economic impact of outsourcing
B) only the direct costs associated with the decision,excluding consideration of indirect costs
C) advantages and disadvantages of outsourcing in terms of time,cost and performance control
D) project manager's or sponsor's preference
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
36
Which of the following types of contracts involves payment to the seller for the seller's actual costs plus a fee typically representing the seller's profit?

A) fixed-price contract
B) cost-reimbursable contract
C) equitable adjustment contract
D) direct cost contract
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
37
Often a project team will start the selection process by establishing a list of potential suppliers.All of the following information sources are frequently used to identify these potential suppliers EXCEPT:

A) supplier catalogs or websites
B) sales personnel
C) stakeholder register
D) trade shows
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
38
Which of the following terms describes a method for transforming contractual arrangements into a cohesive,collaborative project team with a single set of goals and established dispute resolution procedures?

A) a contract unification plan
B) partnering
C) arbitration
D) conflict resolution
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
39
All of the following items are generally considered when selecting the right type of contract EXCEPT:

A) extent of price competition
B) overall degree of cost and schedule risk
C) urgency of requirements
D) project organization's accounting system
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
40
Evaluations of prospective suppliers by project teams often involve all of the following approaches EXCEPT:

A) financial condition analysis
B) facility visits
C) supplier surveys
D) prototyping
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
41
Compare and contrast traditional project procurement management with the more contemporary approach - project partnering.What are the conditions or sharing requirements for effective project partnerships?
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
42
Contract types are often associated with two broad categories: fixed-price contracts and cost-reimbursable contracts.Briefly identify the factors to consider when determining which type is most appropriate for a planned contract.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
43
Project managers must frequently decide whether to obtain needed products and services from internal sources or from external sources.This decision is often referred to as the "make or buy" decision.Briefly identify and explain at least three reasons that support the decision to "make" the products and at least three reasons that support the decision to "buy" the products.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
44
Project partnerships offer which of the following advantages to both clients and vendors?

A) shared motivation
B) potential of lower cost for client
C) potential of greater profit for vendor
D) opportunity for vendor to prove oneself
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
45
According to the PMBOK Guide,the project procurement management knowledge area includes four processes.Identify and briefly describe each of these processes.