Deck 3: Organization: Structure and Culture

Full screen (f)
exit full mode
Question
The structure that manages projects within the existing organizational structure is __________ organization.

A)Functional
B)Balanced matrix
C)Weak matrix
D)Strong matrix
E)Projectized
Use Space or
up arrow
down arrow
to flip the card.
Question
Which of the following is a disadvantage of a projectized organization?

A)It is expensive
B)Longer project duration
C)Poor integration
D)High complexity
E)Lack of focus on the project
Question
Organizational culture is best explained as organizational

A)Personality.
B)Hierarchy.
C)Reporting relationships.
D)Background.
E)Management style.
Question
How does someone learn more about an organization's culture?

A)Read about the organization
B)Interpret stories about the organization
C)Observe how people interact within the organization
D)Study the physical characteristics of the organization
E)All of these are examples of how someone can learn more about an organization's culture.
Question
Which of the following is NOT true regarding organizing projects within a matrix arrangement?

A)Its flexibility supports a strong project focus that helps alleviate stress among project team members.
B)It is designed to optimally utilize resources by having individuals work on multiple projects as well as being capable of performing normal functional duties.
C)There are usually two chains of command.
D)Provides a dual focus between functional/technical expertise and project requirements that are missing in either the project team or the functional approach.
E)It is a hybrid form of organization that combines characteristics of both dedicated project teams and functional organization.
Question
Which are the three different matrix systems discussed in the text?

A)Functional, Weak, Strong
B)Balanced, Functional, Projectized
C)Weak, Strong, Balanced
D)Neutral, Weak, Strong
E)Functional, Neutral, Projectized
Question
MegaComputers Inc., has assigned a project manager for each of the five new-product teams.The managers, as well as the project team members, work on the projects on a full-time basis.The structure being used is ________ organization.

A)Functional
B)Balanced matrix
C)Weak matrix
D)Strong matrix
E)Projectized
Question
Which of the following is a disadvantage of functional project management organization?

A)Lack of motivation of project team members
B)Longer project duration
C)Lack of focus on the project
D)Poor integration
E)All of these are disadvantages of functional project management organization.
Question
Bill is working on a project involving the upgrading of a management information system.The project is being managed by the information systems department with the coordination of other departments occurring through normal channels.He is working in a _________ organization.

A)Functional
B)Balanced matrix
C)Weak matrix
D)Strong matrix
E)Projectized
Question
All of the following are functions culture plays in an organization EXCEPT

A)It provides a sense of identity.
B)It helps legitimize the management system.
C)It replaces the need for a project selection process.
D)It helps create social order.
E)It clarifies and reinforces standards of behavior.
Question
_________ organization is a hybrid form in which a horizontal project management structure is "overlaid" in the normal functional hierarchy.

A)Functional
B)Matrix
C)Project
D)Balanced
E)Neutral
Question
Which of the following combinations represents the extremes of project organization?

A)Strong matrix and balanced matrix
B)Functional and projectized
C)Projectized and balanced matrix
D)Projectized and strong matrix
E)Strong matrix and functional
Question
All of the following are organizational considerations when determining the right project management structure EXCEPT

A)How important project management is to the success of the organization
B)What percentage of core work involves projects
C)Resource availability
D)Assess current practices and determine any changes that are needed to more effectively manage projects
E)Budget constraints
Question
At the project level, which of the following is a factor that should influence the choice of project management structure?

A)The size of the project
B)The novelty of the project
C)Budget and time constraints
D)The strategic importance of the project
E)All of these are factors that should influence the choice of project management structure.
Question
Which of the following is an advantage of a functional project management organization?

A)Maximum flexibility in the use of staff
B)Good integration across functional units
C)Shorter project duration
D)Strong motivation of project team members
E)Longer project duration
Question
Which of the following is NOT true of project management structures?

A)They provide a framework for launching and implementing projects.
B)They appropriately balance the needs of both the parent organization and the project.
C)In selecting a management structure, the culture of the organization is not a huge consideration.
D)The project itself should be considered when determining which structure is best.
E)They help determine who has most authority in regard to managing the project.
Question
Elizabeth is considering how to structure a project team that will not directly disrupt ongoing operations.The project needs to be done quickly and a high level of motivation will be needed in order to do that.For this situation, the ______ organization would be the best choice.

A)Functional
B)Balanced matrix
C)Weak matrix
D)Strong matrix
E)Projectized
Question
A project team that operates with a full-time project manager as a separate unit from the rest of the organization is structured using ________ organization.

A)Functional
B)Balanced matrix
C)Weak matrix
D)Strong matrix
E)Projectized
Question
All of the following are disadvantages of organizing projects within a matrix arrangement EXCEPT

A)Dysfunctional conflict between functional managers and project managers.
B)Expensive.
C)Infighting.
D)Stressful.
E)Longer project duration.
Question
In which of the following is the balance of authority strongly in favor of the functional managers?

A)Weak matrix
B)Balanced matrix
C)Strong matrix
D)Matrix
E)Neutral matrix
Question
Firms where projects are the dominant form of business and the entire organization is designed to support project teams are usually structured as a(n)_________ organization.
Question
A matrix in which the balance of authority is strongly on the side of the project manager is described as __________.
Question
From the list below, which is NOT a primary characteristic of organizational culture?

A)Control
B)Team emphasis
C)Profitability
D)Conflict tolerance
E)Risk tolerance
Question
A high level of motivation and the tendency for projects to get done more quickly are benefits of using the ________ organizational approach to project management.
Question
In a(n)________ system, there are usually two chains of command, one along functional lines and the other along project lines.
Question
Which of the following cultural characteristics relates to the degree to which work activities are organized around groups rather than individuals?

A)Member identity
B)Team emphasis
C)Managerial focus
D)Unit integration
E)Control
Question
Which structure would be most appropriate for developing a new, highly innovative product that has strict time constraints?

A)Functional organization
B)Balanced matrix
C)Dedicated project team
D)Strong matrix
E)Weak matrix
Question
Which of the following cultural characteristics relates to the degree to which groups within the organization are encouraged to operate in a coordinated or independent manner?

A)Member identity
B)Team emphasis
C)Managerial focus
D)Unit integration
E)Control
Question
Two of the major disadvantages of the ________ organizational approach are that projects may lack focus and it can take longer to complete projects.
Question
Factors in identifying cultural characteristics include all the following EXCEPT

A)Norms.
B)Customs.
C)Values.
D)Attitude.
E)All of these are factors in identifying cultural characteristics.
Question
The personality of an organization is a simple explanation of ___________.
Question
Who is responsible for determining how tasks will be done in a weak matrix project management structure?

A)The functional manager
B)The project manager
C)Both the functional manager and the project manager are responsible
D)There is no rule established for who takes responsibility.
E)This is negotiated
Question
Which of the following cultural characteristic relates to the degree to which rules, policies, and direct supervision are used to oversee and control employee behavior?

A)Member identity
B)Team Emphasis
C)Managerial focus
D)Unit integration
E)Control
Question
Which organization's culture is NOT a culture a project manager has to be able to operate in or interact with?

A)The culture of their parent organization
B)The culture of government and regulatory agencies
C)The culture of vendors and subcontractors
D)The culture of the project's customer or client
E)All of these are cultures a project manager has to be able to operate in or interact with.
Question
No radical alteration in the design or operation of the parent organization is a major advantage of __________ organization.
Question
The approach to project management that uses the existing hierarchy of the organization to manage projects is ___________ organization.
Question
Which of the following cultural characteristics relates to the degree to which employees identify with the organization as a whole rather than with their type of job or field of professional expertise?

A)Member identity
B)Team emphasis
C)Managerial focus
D)Unit integration
E)Control
Question
High project costs and difficult post-project transition are two evident weaknesses of a(n)__________ organization.
Question
Which of the following cultural characteristics relates to the degree to which management focuses on outcomes rather than on techniques and processes used to achieve those outcomes?

A)Risk tolerance
B)Reward criteria
C)Conflict tolerance
D)Means versus end orientation
E)Open-systems focus
Question
The ________ structure is designed to optimally utilize resources by having individuals work on multiple projects as well as being capable of performing normal functional duties.
Question
Conflict tolerance, risk tolerance, reward criteria and unit integration are all examples of cultural __________.
Question
________ project teams should be used for urgent projects in which the nature of the work requires people working steadily from beginning to end.
Question
When most of the project work can be done within a specified department and any coordination with other departments can be done easily through normal management channels, ___________ organization is most appropriate.
Question
High levels of stress and dysfunctional conflict are disadvantages of a(n)_________ organization.
Question
Research suggests that there is a strong connection between project management structure, organizational ________, and project success.
Question
The more autonomy and authority the project manager and project team need to be successful, the more appropriate a dedicated project team or a(n)________ matrix structure is to manage the project.
Question
The cultural characteristic that refers to the degree to which the organization monitors and responds to changes in the external environment is known as ___________.
Question
Organization ________ refers to a system of shared norms, beliefs, values, and assumptions which bind people together, thereby creating shared meanings.
Question
The ________ matrix form of project organization can achieve better equilibrium between technical and project requirements, but it is a very delicate system to create and manage.
Question
The ________ matrix form of project organization is likely to enhance project integration, diminish internal power struggles, and ultimately improve control of project activities and costs.
Question
The matrix form of project management structure is a good choice when resource usage needs to be optimized by having individuals work on multiple projects while still performing functional duties.
Question
The cultural characteristic that refers to the degree to which employees are encouraged to air conflicts and criticisms openly is known as ___________.
Question
A disadvantage of using the functional form of project management structure is that projects generally take longer to complete.
Question
The cultural characteristic that refers to the degree to which employees are encouraged to be aggressive, innovative, and risk seeking is known as _____________.
Question
The cultural characteristic that refers to the degree to which rewards such as promotion and salary increases are allocated according to employee performance rather than seniority, favoritism, or other nonperformance factors is known as _____________.
Question
While organization culture is important to the overall function of an organization, it has minor influence on its project management.
Question
There are often considerable differences in how projects are managed within certain firms, even when similar project management structures are being used.
Question
A matrix in which the balance of authority is strongly on the side of the functional manager is described as _________.
Question
The projectized form of project management structure is commonly used when one functional area plays a dominant role in completing the project or has a dominant interest in the success of the project.
Question
The ________ matrix form of project organization is likely to improve technical quality as well as provide a better system for managing conflict across projects because the functional manager assigns personnel to different projects.
Question
In a balanced matrix form of project management, the project manager is responsible for defining what needs to be accomplished while the functional managers are concerned with how it will be accomplished.
Question
The matrix form of project management is notable for the tension it creates between functional managers and project managers who both bring critical expertise and perspectives to the project.
Question
Organizational culture refers to a system of shared norms, beliefs, values, and assumptions which bind people together.
Question
In the projectized form of project management structure, there is limited technological expertise when compared to the functional or matrix organization.
Question
A matrix project management structure is a hybrid organizational form in which a horizontal project management structure is "overlaid" on the normal functional hierarchy.
Question
Control is the cultural characteristic that refers to the degree to which management decisions take into account the effect of outcomes on people within the organization.
Question
Member identity refers to the degree to which work activities are organized around groups rather than individuals.
Question
Certain aspects of the culture of an organization support successful project management while other aspects deter or interfere with effective management.
Question
The functional project team is usually physically separated from the parent organization and given the primary directive of accomplishing the objectives of the project.
Question
When three forms of the matrix project management structure are considered, all share the same advantages and disadvantages and at an equal level.
Question
Unit integration is the cultural characteristic that refers to the degree to which units within the organization are encouraged to operate in a coordinated or independent manner.
Question
As discussed in the text, the three forms of matrix project management are weak, mixed, and strong.
Question
There are often considerable differences in how projects are managed within certain firms, even if the same project management structure is being used.Explain.
Question
There are strong connections among project management structure, organizational culture, and project success.
Question
One advantage of a matrix project management structure is that it is fast and easy to implement.
Question
Generally, the more autonomy and authority the project manager and the project team need to be successful, the more appropriate to implement either a dedicated project team or a strong project management structure.
Question
When determining the most appropriate project management structure, considerations need to be made at the organizational level and at the project level.
Question
One of the major disadvantages of the projectized form of project management structure is that it tends to be more expensive than other forms of organization.
Question
Within a matrix project management structure, the extent to which the project manager has direct authority over project participants depends on whether the matrix is weak, balanced, or strong.
Question
The projectized form of project management structure is a good choice when speed of completion is important and the project needs to be implemented without directly disrupting ongoing operations.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/101
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 3: Organization: Structure and Culture
1
The structure that manages projects within the existing organizational structure is __________ organization.

A)Functional
B)Balanced matrix
C)Weak matrix
D)Strong matrix
E)Projectized
A
Explanation: One approach to organizing projects is to simply manage them within the existing functional hierarchy of the organization.Once management decides to implement a project, the different segments of the project are delegated to the respective functional units with each unit responsible for completing its segment of the project.
2
Which of the following is a disadvantage of a projectized organization?

A)It is expensive
B)Longer project duration
C)Poor integration
D)High complexity
E)Lack of focus on the project
A
Explanation: Disadvantages of organizing projects as dedicated project teams are that it is expensive, internal strife can occur, limited technological expertise, and difficult post-project transition.
3
Organizational culture is best explained as organizational

A)Personality.
B)Hierarchy.
C)Reporting relationships.
D)Background.
E)Management style.
A
Explanation: A simple explanation of organizational culture is that it reflects the "personality" of an organization.
4
How does someone learn more about an organization's culture?

A)Read about the organization
B)Interpret stories about the organization
C)Observe how people interact within the organization
D)Study the physical characteristics of the organization
E)All of these are examples of how someone can learn more about an organization's culture.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
5
Which of the following is NOT true regarding organizing projects within a matrix arrangement?

A)Its flexibility supports a strong project focus that helps alleviate stress among project team members.
B)It is designed to optimally utilize resources by having individuals work on multiple projects as well as being capable of performing normal functional duties.
C)There are usually two chains of command.
D)Provides a dual focus between functional/technical expertise and project requirements that are missing in either the project team or the functional approach.
E)It is a hybrid form of organization that combines characteristics of both dedicated project teams and functional organization.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
6
Which are the three different matrix systems discussed in the text?

A)Functional, Weak, Strong
B)Balanced, Functional, Projectized
C)Weak, Strong, Balanced
D)Neutral, Weak, Strong
E)Functional, Neutral, Projectized
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
7
MegaComputers Inc., has assigned a project manager for each of the five new-product teams.The managers, as well as the project team members, work on the projects on a full-time basis.The structure being used is ________ organization.

A)Functional
B)Balanced matrix
C)Weak matrix
D)Strong matrix
E)Projectized
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
8
Which of the following is a disadvantage of functional project management organization?

A)Lack of motivation of project team members
B)Longer project duration
C)Lack of focus on the project
D)Poor integration
E)All of these are disadvantages of functional project management organization.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
9
Bill is working on a project involving the upgrading of a management information system.The project is being managed by the information systems department with the coordination of other departments occurring through normal channels.He is working in a _________ organization.

A)Functional
B)Balanced matrix
C)Weak matrix
D)Strong matrix
E)Projectized
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
10
All of the following are functions culture plays in an organization EXCEPT

A)It provides a sense of identity.
B)It helps legitimize the management system.
C)It replaces the need for a project selection process.
D)It helps create social order.
E)It clarifies and reinforces standards of behavior.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
11
_________ organization is a hybrid form in which a horizontal project management structure is "overlaid" in the normal functional hierarchy.

A)Functional
B)Matrix
C)Project
D)Balanced
E)Neutral
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
12
Which of the following combinations represents the extremes of project organization?

A)Strong matrix and balanced matrix
B)Functional and projectized
C)Projectized and balanced matrix
D)Projectized and strong matrix
E)Strong matrix and functional
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
13
All of the following are organizational considerations when determining the right project management structure EXCEPT

A)How important project management is to the success of the organization
B)What percentage of core work involves projects
C)Resource availability
D)Assess current practices and determine any changes that are needed to more effectively manage projects
E)Budget constraints
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
14
At the project level, which of the following is a factor that should influence the choice of project management structure?

A)The size of the project
B)The novelty of the project
C)Budget and time constraints
D)The strategic importance of the project
E)All of these are factors that should influence the choice of project management structure.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
15
Which of the following is an advantage of a functional project management organization?

A)Maximum flexibility in the use of staff
B)Good integration across functional units
C)Shorter project duration
D)Strong motivation of project team members
E)Longer project duration
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
16
Which of the following is NOT true of project management structures?

A)They provide a framework for launching and implementing projects.
B)They appropriately balance the needs of both the parent organization and the project.
C)In selecting a management structure, the culture of the organization is not a huge consideration.
D)The project itself should be considered when determining which structure is best.
E)They help determine who has most authority in regard to managing the project.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
17
Elizabeth is considering how to structure a project team that will not directly disrupt ongoing operations.The project needs to be done quickly and a high level of motivation will be needed in order to do that.For this situation, the ______ organization would be the best choice.

A)Functional
B)Balanced matrix
C)Weak matrix
D)Strong matrix
E)Projectized
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
18
A project team that operates with a full-time project manager as a separate unit from the rest of the organization is structured using ________ organization.

A)Functional
B)Balanced matrix
C)Weak matrix
D)Strong matrix
E)Projectized
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
19
All of the following are disadvantages of organizing projects within a matrix arrangement EXCEPT

A)Dysfunctional conflict between functional managers and project managers.
B)Expensive.
C)Infighting.
D)Stressful.
E)Longer project duration.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
20
In which of the following is the balance of authority strongly in favor of the functional managers?

A)Weak matrix
B)Balanced matrix
C)Strong matrix
D)Matrix
E)Neutral matrix
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
21
Firms where projects are the dominant form of business and the entire organization is designed to support project teams are usually structured as a(n)_________ organization.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
22
A matrix in which the balance of authority is strongly on the side of the project manager is described as __________.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
23
From the list below, which is NOT a primary characteristic of organizational culture?

A)Control
B)Team emphasis
C)Profitability
D)Conflict tolerance
E)Risk tolerance
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
24
A high level of motivation and the tendency for projects to get done more quickly are benefits of using the ________ organizational approach to project management.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
25
In a(n)________ system, there are usually two chains of command, one along functional lines and the other along project lines.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
26
Which of the following cultural characteristics relates to the degree to which work activities are organized around groups rather than individuals?

A)Member identity
B)Team emphasis
C)Managerial focus
D)Unit integration
E)Control
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
27
Which structure would be most appropriate for developing a new, highly innovative product that has strict time constraints?

A)Functional organization
B)Balanced matrix
C)Dedicated project team
D)Strong matrix
E)Weak matrix
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
28
Which of the following cultural characteristics relates to the degree to which groups within the organization are encouraged to operate in a coordinated or independent manner?

A)Member identity
B)Team emphasis
C)Managerial focus
D)Unit integration
E)Control
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
29
Two of the major disadvantages of the ________ organizational approach are that projects may lack focus and it can take longer to complete projects.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
30
Factors in identifying cultural characteristics include all the following EXCEPT

A)Norms.
B)Customs.
C)Values.
D)Attitude.
E)All of these are factors in identifying cultural characteristics.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
31
The personality of an organization is a simple explanation of ___________.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
32
Who is responsible for determining how tasks will be done in a weak matrix project management structure?

A)The functional manager
B)The project manager
C)Both the functional manager and the project manager are responsible
D)There is no rule established for who takes responsibility.
E)This is negotiated
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
33
Which of the following cultural characteristic relates to the degree to which rules, policies, and direct supervision are used to oversee and control employee behavior?

A)Member identity
B)Team Emphasis
C)Managerial focus
D)Unit integration
E)Control
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
34
Which organization's culture is NOT a culture a project manager has to be able to operate in or interact with?

A)The culture of their parent organization
B)The culture of government and regulatory agencies
C)The culture of vendors and subcontractors
D)The culture of the project's customer or client
E)All of these are cultures a project manager has to be able to operate in or interact with.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
35
No radical alteration in the design or operation of the parent organization is a major advantage of __________ organization.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
36
The approach to project management that uses the existing hierarchy of the organization to manage projects is ___________ organization.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
37
Which of the following cultural characteristics relates to the degree to which employees identify with the organization as a whole rather than with their type of job or field of professional expertise?

A)Member identity
B)Team emphasis
C)Managerial focus
D)Unit integration
E)Control
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
38
High project costs and difficult post-project transition are two evident weaknesses of a(n)__________ organization.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
39
Which of the following cultural characteristics relates to the degree to which management focuses on outcomes rather than on techniques and processes used to achieve those outcomes?

A)Risk tolerance
B)Reward criteria
C)Conflict tolerance
D)Means versus end orientation
E)Open-systems focus
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
40
The ________ structure is designed to optimally utilize resources by having individuals work on multiple projects as well as being capable of performing normal functional duties.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
41
Conflict tolerance, risk tolerance, reward criteria and unit integration are all examples of cultural __________.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
42
________ project teams should be used for urgent projects in which the nature of the work requires people working steadily from beginning to end.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
43
When most of the project work can be done within a specified department and any coordination with other departments can be done easily through normal management channels, ___________ organization is most appropriate.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
44
High levels of stress and dysfunctional conflict are disadvantages of a(n)_________ organization.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
45
Research suggests that there is a strong connection between project management structure, organizational ________, and project success.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
46
The more autonomy and authority the project manager and project team need to be successful, the more appropriate a dedicated project team or a(n)________ matrix structure is to manage the project.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
47
The cultural characteristic that refers to the degree to which the organization monitors and responds to changes in the external environment is known as ___________.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
48
Organization ________ refers to a system of shared norms, beliefs, values, and assumptions which bind people together, thereby creating shared meanings.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
49
The ________ matrix form of project organization can achieve better equilibrium between technical and project requirements, but it is a very delicate system to create and manage.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
50
The ________ matrix form of project organization is likely to enhance project integration, diminish internal power struggles, and ultimately improve control of project activities and costs.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
51
The matrix form of project management structure is a good choice when resource usage needs to be optimized by having individuals work on multiple projects while still performing functional duties.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
52
The cultural characteristic that refers to the degree to which employees are encouraged to air conflicts and criticisms openly is known as ___________.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
53
A disadvantage of using the functional form of project management structure is that projects generally take longer to complete.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
54
The cultural characteristic that refers to the degree to which employees are encouraged to be aggressive, innovative, and risk seeking is known as _____________.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
55
The cultural characteristic that refers to the degree to which rewards such as promotion and salary increases are allocated according to employee performance rather than seniority, favoritism, or other nonperformance factors is known as _____________.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
56
While organization culture is important to the overall function of an organization, it has minor influence on its project management.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
57
There are often considerable differences in how projects are managed within certain firms, even when similar project management structures are being used.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
58
A matrix in which the balance of authority is strongly on the side of the functional manager is described as _________.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
59
The projectized form of project management structure is commonly used when one functional area plays a dominant role in completing the project or has a dominant interest in the success of the project.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
60
The ________ matrix form of project organization is likely to improve technical quality as well as provide a better system for managing conflict across projects because the functional manager assigns personnel to different projects.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
61
In a balanced matrix form of project management, the project manager is responsible for defining what needs to be accomplished while the functional managers are concerned with how it will be accomplished.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
62
The matrix form of project management is notable for the tension it creates between functional managers and project managers who both bring critical expertise and perspectives to the project.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
63
Organizational culture refers to a system of shared norms, beliefs, values, and assumptions which bind people together.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
64
In the projectized form of project management structure, there is limited technological expertise when compared to the functional or matrix organization.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
65
A matrix project management structure is a hybrid organizational form in which a horizontal project management structure is "overlaid" on the normal functional hierarchy.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
66
Control is the cultural characteristic that refers to the degree to which management decisions take into account the effect of outcomes on people within the organization.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
67
Member identity refers to the degree to which work activities are organized around groups rather than individuals.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
68
Certain aspects of the culture of an organization support successful project management while other aspects deter or interfere with effective management.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
69
The functional project team is usually physically separated from the parent organization and given the primary directive of accomplishing the objectives of the project.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
70
When three forms of the matrix project management structure are considered, all share the same advantages and disadvantages and at an equal level.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
71
Unit integration is the cultural characteristic that refers to the degree to which units within the organization are encouraged to operate in a coordinated or independent manner.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
72
As discussed in the text, the three forms of matrix project management are weak, mixed, and strong.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
73
There are often considerable differences in how projects are managed within certain firms, even if the same project management structure is being used.Explain.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
74
There are strong connections among project management structure, organizational culture, and project success.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
75
One advantage of a matrix project management structure is that it is fast and easy to implement.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
76
Generally, the more autonomy and authority the project manager and the project team need to be successful, the more appropriate to implement either a dedicated project team or a strong project management structure.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
77
When determining the most appropriate project management structure, considerations need to be made at the organizational level and at the project level.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
78
One of the major disadvantages of the projectized form of project management structure is that it tends to be more expensive than other forms of organization.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
79
Within a matrix project management structure, the extent to which the project manager has direct authority over project participants depends on whether the matrix is weak, balanced, or strong.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
80
The projectized form of project management structure is a good choice when speed of completion is important and the project needs to be implemented without directly disrupting ongoing operations.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck