Deck 5: Estimating Project Times and Costs
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/101
Play
Full screen (f)
Deck 5: Estimating Project Times and Costs
1
The process of forecasting or approximating the time and cost of completing project deliverables is called
A)Budgeting.
B)Predicting.
C)Estimating.
D)Planning.
E)Guesstimating.
A)Budgeting.
B)Predicting.
C)Estimating.
D)Planning.
E)Guesstimating.
C
Explanation: Estimating is the process of forecasting or approximating the time and cost of completing project deliverables.
Explanation: Estimating is the process of forecasting or approximating the time and cost of completing project deliverables.
2
What is the relationship between organizational culture and estimating?
A)There is no relationship.
B)Cultural norms affect the accuracy of estimates.
C)Culture determines whether estimates are made.
D)Estimating alters cultural norms.
E)Estimating and culture are independent.
A)There is no relationship.
B)Cultural norms affect the accuracy of estimates.
C)Culture determines whether estimates are made.
D)Estimating alters cultural norms.
E)Estimating and culture are independent.
B
Explanation: Organizational culture can significantly influence project estimates.Organizations vary in the importance they attach to estimates.
Explanation: Organizational culture can significantly influence project estimates.Organizations vary in the importance they attach to estimates.
3
Jose is forecasting project time and cost for constructing a new building by multiplying the total square footage by a given dollar amount.Which of the following methods is he using?
A)Ratio
B)Template
C)Apportion
D)Function point
E)Learning curve
A)Ratio
B)Template
C)Apportion
D)Function point
E)Learning curve
A
Explanation: Top-down methods (sometimes called parametric)usually use ratios, or surrogates, to estimate project times or costs.Top-down approaches are often used in the concept or 'need' phase of a project to get an initial duration and cost estimate for the project.For example, contractors frequently use the number of square feet to estimate the cost and time to build a new house.
Explanation: Top-down methods (sometimes called parametric)usually use ratios, or surrogates, to estimate project times or costs.Top-down approaches are often used in the concept or 'need' phase of a project to get an initial duration and cost estimate for the project.For example, contractors frequently use the number of square feet to estimate the cost and time to build a new house.
4
Sean is forecasting the time and cost of developing a customized software program by looking at the number of inputs, outputs, inquiries, files, and interfaces.Which of the following methods is he using?
A)Ratio
B)Template
C)Apportion
D)Function point
E)Learning curve
A)Ratio
B)Template
C)Apportion
D)Function point
E)Learning curve
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
5
Which of the following is a good condition for top-down estimating?
A)Cost and time important
B)Fixed price contract
C)Customer wants details
D)Internal, small project
E)Large scale project involving several subcontractors
A)Cost and time important
B)Fixed price contract
C)Customer wants details
D)Internal, small project
E)Large scale project involving several subcontractors
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
6
Laura is forecasting the time and cost of developing an intranet for a new customer.Her department has completed six such intranets for customers during the last two years.Although the proposed system is about the same size as the others, she estimates that it will take about 10 percent less time and money.Which of the following methods is she using?
A)Ratio
B)Template
C)Apportion
D)Function point
E)Learning curve
A)Ratio
B)Template
C)Apportion
D)Function point
E)Learning curve
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
7
Which of the following methods is NOT considered a top-down approach to estimating project time and cost?
A)Ratio
B)Template
C)Apportion
D)Function point
E)Learning curve
A)Ratio
B)Template
C)Apportion
D)Function point
E)Learning curve
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
8
Learning curves are more likely to be applied in situations where most of the costs are
A)Materials.
B)Labor.
C)Overhead.
D)Evenly spread over materials, labor, and overhead.
E)Labor and materials.
A)Materials.
B)Labor.
C)Overhead.
D)Evenly spread over materials, labor, and overhead.
E)Labor and materials.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
9
Which of the following is NOT one of the bottom-up approaches to estimating project time and cost?
A)Parametric procedures applied to specific tasks
B)Estimates for the WBS work packages
C)Learning curve
D)Template method
E)Range estimates
A)Parametric procedures applied to specific tasks
B)Estimates for the WBS work packages
C)Learning curve
D)Template method
E)Range estimates
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
10
Which of the following does NOT help describe a bottom-up estimating approach?
A)They are made by someone who uses experience and/or information from someone else to determine overall project cost and duration.
B)They establish low-cost, efficient methods for completing activities.
C)They typically comes from the people actually doing the work and who are most knowledgeable about the task at hand.
D)Estimates are made at the work package level and then "rolled up" to determine estimates for major deliverables and for the project itself.
E)They can take place after the project has been planned in detail.
A)They are made by someone who uses experience and/or information from someone else to determine overall project cost and duration.
B)They establish low-cost, efficient methods for completing activities.
C)They typically comes from the people actually doing the work and who are most knowledgeable about the task at hand.
D)Estimates are made at the work package level and then "rolled up" to determine estimates for major deliverables and for the project itself.
E)They can take place after the project has been planned in detail.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
11
Which of the following describes the consensus method?
A)Should be used only for projects that require the same task, group of tasks, or product to be repeated several times
B)Uses several people with relevant experience regarding the task at hand to make time and cost estimates
C)Uses pooled experience of senior and/or middle managers to estimate the total project duration and cost
D)Uses the number of square feet to estimate the total cost and time of the project
E)Uses weighted macro variables or major parameters such as the number of inputs or outputs to estimate the total cost and time of the project
A)Should be used only for projects that require the same task, group of tasks, or product to be repeated several times
B)Uses several people with relevant experience regarding the task at hand to make time and cost estimates
C)Uses pooled experience of senior and/or middle managers to estimate the total project duration and cost
D)Uses the number of square feet to estimate the total cost and time of the project
E)Uses weighted macro variables or major parameters such as the number of inputs or outputs to estimate the total cost and time of the project
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
12
In practice, estimating processes are frequently classified as
A)Top down/bottom up.
B)Rough/polished.
C)Precise/order of magnitude.
D)Draft/final.
E)Broad/Specific.
A)Top down/bottom up.
B)Rough/polished.
C)Precise/order of magnitude.
D)Draft/final.
E)Broad/Specific.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
13
Which of the following is NOT one of the factors that need to be considered to improve quality of estimates for project times and costs?
A)Planning horizon
B)People
C)Padding estimates
D)Profit
E)Project structure
A)Planning horizon
B)People
C)Padding estimates
D)Profit
E)Project structure
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
14
Janet is forecasting how much money her department needs to support a new project.She estimates that two people and $25,000 in expenses will cover her needs.Because management typically insists on reducing forecasts by 20 percent, she increases her estimates to allow for that reduction.Which of the following factors is illustrated in this situation?
A)Padding estimates
B)Planning horizon
C)Project structure
D)People
E)Organization culture
A)Padding estimates
B)Planning horizon
C)Project structure
D)People
E)Organization culture
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
15
Which of the following is a good condition for bottom-up estimating?
A)When the project involves strategic decision making
B)When the project is internal and small
C)When there is a fixed price contract
D)When there is high uncertainty involved in the project
E)When there is an unstable scope
A)When the project involves strategic decision making
B)When the project is internal and small
C)When there is a fixed price contract
D)When there is high uncertainty involved in the project
E)When there is an unstable scope
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
16
Ed is looking over the actual results of projects and comparing them to what was estimated.He notices that the projects that took six months or longer to complete were noticeably more off the estimates.Which of the following factors is he recognizing?
A)Padding estimates
B)Project duration
C)Project structure
D)People
E)Organization culture
A)Padding estimates
B)Project duration
C)Project structure
D)People
E)Organization culture
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
17
Rob is responsible for estimating a work package that has a significant amount of uncertainty associated with the time and cost to complete.Due to the uncertainty involved he will be making a low, an average and a high estimate.Rob is using which estimating approach?
A)Parametric procedures applied to specific tasks
B)Template method
C)Apportion method
D)Range estimating
E)Learning curve
A)Parametric procedures applied to specific tasks
B)Template method
C)Apportion method
D)Range estimating
E)Learning curve
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
18
Which of the following would be the best method for projects where the final product is not known and the uncertainty is very large?
A)Function point
B)Template
C)Learning curve
D)Phase estimating
E)Apportion
A)Function point
B)Template
C)Learning curve
D)Phase estimating
E)Apportion
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
19
Richard is collecting estimates for a house that he will have the funding to build in 12 months.Which of the following factors does Richard need to consider in regard to the quality of these estimates?
A)Padding estimates
B)Planning horizon
C)Project structure
D)People
E)Project duration
A)Padding estimates
B)Planning horizon
C)Project structure
D)People
E)Project duration
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
20
A good starting point for developing time and cost estimates is
A)Past experience.
B)Work packages.
C)Task analysis.
D)Time and motion studies.
E)Work breakdown structure.
A)Past experience.
B)Work packages.
C)Task analysis.
D)Time and motion studies.
E)Work breakdown structure.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
21
Which of the following is NOT true in regard to the level of detail estimates should contain?
A)It will vary with the complexity of the project.
B)Detailed estimates are crucial to project success; therefore, an effort should be made to make estimates as detailed as possible for all projects.
C)The more detailed the estimate is the more the estimate will cost to create.
D)Inadequate detail might lead to estimates that fall short of their intended purpose.
E)Excessive detail means unproductive paperwork and unnecessary expenditures.
A)It will vary with the complexity of the project.
B)Detailed estimates are crucial to project success; therefore, an effort should be made to make estimates as detailed as possible for all projects.
C)The more detailed the estimate is the more the estimate will cost to create.
D)Inadequate detail might lead to estimates that fall short of their intended purpose.
E)Excessive detail means unproductive paperwork and unnecessary expenditures.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
22
Refining estimates may be necessary for a number of reasons.For example, people working on prototype development needing time to interact with the design engineers after the design is completed is a good example of
A)Hidden interaction costs.
B)Things going wrong on a project.
C)Normal conditions not applying.
D)Changes in project scope.
E)The customer not being clear about their expectations.
A)Hidden interaction costs.
B)Things going wrong on a project.
C)Normal conditions not applying.
D)Changes in project scope.
E)The customer not being clear about their expectations.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
23
The salary of the project manager would be an example of what type of cost found in a project?
A)Labor
B)Direct
C)Direct project overhead
D)General and administrative overhead
E)Salary
A)Labor
B)Direct
C)Direct project overhead
D)General and administrative overhead
E)Salary
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
24
Which of the following top-down methods is used when projects closely follow past projects in regard to features and costs of those features, and result in costs being assigned by percentages to major segments of the project?
A)Apportion
B)Function point
C)Phase estimating
D)Learning curve
E)Consensus
A)Apportion
B)Function point
C)Phase estimating
D)Learning curve
E)Consensus
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
25
Typical kinds of costs found in a project include all of the following EXCEPT
A)Direct costs.
B)Project overhead costs.
C)General and administrative overhead costs.
D)Labor.
E)All of these choices are examples of costs found in a project.
A)Direct costs.
B)Project overhead costs.
C)General and administrative overhead costs.
D)Labor.
E)All of these choices are examples of costs found in a project.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
26
Which of the following would best represent direct project costs?
A)Only labor
B)Only materials
C)Only equipment
D)Both labor and materials
E)Labor, materials and equipment
A)Only labor
B)Only materials
C)Only equipment
D)Both labor and materials
E)Labor, materials and equipment
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
27
Refining estimates may be necessary for a number of reasons.For example, design flaws being revealed after the fact, extreme weather conditions, and accidents occurring are good examples of
A)Hidden interaction costs.
B)Things going wrong on a project.
C)Normal conditions not applying.
D)Changes in project scope.
E)None of these are correct.
A)Hidden interaction costs.
B)Things going wrong on a project.
C)Normal conditions not applying.
D)Changes in project scope.
E)None of these are correct.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
28
Companies are using which of the following for improving the estimating process for future projects?
A)Adjusting estimates based on individual forecasting abilities
B)Benchmarking and using the experience of other companies
C)Using time and motion studies
D)Creating historical databases of previous projects
E)Establishing an estimating training course for all employees
A)Adjusting estimates based on individual forecasting abilities
B)Benchmarking and using the experience of other companies
C)Using time and motion studies
D)Creating historical databases of previous projects
E)Establishing an estimating training course for all employees
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
29
Which of the following is NOT one of the recommended guidelines for developing useful work package estimates?
A)Estimates should be made by those responsible for the work.
B)Use several people to estimate the same work.
C)Estimates should be based on normal conditions.
D)Estimates should include a normal level of contingency.
E)Estimates should be independent of other projects.
A)Estimates should be made by those responsible for the work.
B)Use several people to estimate the same work.
C)Estimates should be based on normal conditions.
D)Estimates should include a normal level of contingency.
E)Estimates should be independent of other projects.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
30
The bottom-up approach for estimating times and costs that uses costs from past projects that were similar to the current project is known as
A)Detailed WBS work package estimates.
B)Template method.
C)Function point method.
D)Time-phased cost estimates.
E)Phase estimating.
A)Detailed WBS work package estimates.
B)Template method.
C)Function point method.
D)Time-phased cost estimates.
E)Phase estimating.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
31
Large projects that have long time horizons and a very high complexity can be referred to as
A)Mega Projects.
B)High Risk.
C)White Elephants.
D)Both Mega Projects and White Elephants.
A)Mega Projects.
B)High Risk.
C)White Elephants.
D)Both Mega Projects and White Elephants.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
32
Benefits of Reference Class Forecasting include
A)Acting as a reality check.
B)Helps to avoid unsound optimism.
C)Provides a basis for contingency funds.
D)All of these choices.
A)Acting as a reality check.
B)Helps to avoid unsound optimism.
C)Provides a basis for contingency funds.
D)All of these choices.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
33
Estimating can be challenged by
A)Human Nature.
B)Political dynamics.
C)Difficulty in predicting the future.
D)All of these choices.
A)Human Nature.
B)Political dynamics.
C)Difficulty in predicting the future.
D)All of these choices.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
34
While it may be true that Mega Projects are by nature extremely difficult to estimate, another factor identified in the consistent pattern of estimating difficulties is:
A)Unidentified risks.
B)Deception.
C)Economic downturn.
D)Both unidentified risks and economic downturn.
A)Unidentified risks.
B)Deception.
C)Economic downturn.
D)Both unidentified risks and economic downturn.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
35
The pattern of improvement identified from a worker having performed a task multiple time is known as a
A)Reduced Failure Rate.
B)Optimistic Estimate.
C)Learning Curve.
D)Both Reduced Failure Rate and Learning Curve.
A)Reduced Failure Rate.
B)Optimistic Estimate.
C)Learning Curve.
D)Both Reduced Failure Rate and Learning Curve.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
36
Reasons why estimating time and cost are important include all of the following EXCEPT
A)To schedule work.
B)To determine how long the project should take and cost.
C)To develop cash flow needs.
D)To determine how well the project is progressing.
E)To help establish a project selection process.
A)To schedule work.
B)To determine how long the project should take and cost.
C)To develop cash flow needs.
D)To determine how well the project is progressing.
E)To help establish a project selection process.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
37
Refining estimates may be necessary for a number of reasons.For example, resource shortages, in the form of people, equipment, or materials, can extend original estimates.This is a good example of
A)Hidden interaction costs.
B)Things going wrong on a project.
C)Normal conditions not applying.
D)Changes in project scope.
E)The customer not being clear about their expectations.
A)Hidden interaction costs.
B)Things going wrong on a project.
C)Normal conditions not applying.
D)Changes in project scope.
E)The customer not being clear about their expectations.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
38
Refining Estimates may be necessary for a number of reasons.For example, a manager getting further into a project and obtaining a better understanding of what needs to be done to accomplish a project and meet the needs of the customer is an example of
A)Hidden interaction costs.
B)Things going wrong on a project.
C)Normal conditions not applying.
D)Changes in project scope.
E)There is never a good reason to refine estimates.
A)Hidden interaction costs.
B)Things going wrong on a project.
C)Normal conditions not applying.
D)Changes in project scope.
E)There is never a good reason to refine estimates.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
39
An external view of a Mega Project based upon the outcome of similar projects undertaken in the past is known as:
A)Pareto Charting.
B)The Monte Carlo Method.
C)Reference Class Forecasting.
D)Big Data Analysis.
A)Pareto Charting.
B)The Monte Carlo Method.
C)Reference Class Forecasting.
D)Big Data Analysis.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
40
Accounting would be an example of which of the following costs typically found in a project?
A)Labor
B)Direct
C)Direct project overhead
D)General and administrative overhead
E)Salary
A)Labor
B)Direct
C)Direct project overhead
D)General and administrative overhead
E)Salary
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
41
The preferred method for situations where the cost and time estimates are important, in a fixed contract situation, and when the customer wants a lot of detail is the ___________ approach to estimating project time and costs.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
42
The estimating factor that considers the skill level of participants doing the estimating is known as the ___________ factor.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
43
The top-down method of estimating project time and costs that is useful for projects requiring the same task, group of tasks, or product repeated several times, especially if it is labor intensive, is the ______________.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
44
When work package estimates are made by individuals most knowledgeable about the work being performed and these estimates are then "rolled up" to find estimated costs for major deliverables and the project itself, ____________ estimating is being used.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
45
The approach to estimating project time and cost that begins with an overall estimate for the project and then refines estimates for various stages of the project as it is implemented is known as ____________.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
46
The estimating factor that considers the prevailing belief in some firms that detailed estimating takes too much time and is not worth the effort is an example of the ___________ factor.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
47
The top-down method for estimating project time and cost that uses weighted variables based on major parameters and is frequently used in the development of software is known as the ____________ method.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
48
The bottom-up method of estimating where work package time and costs for past projects are used as a starting point for a new project and adjustments are made based on differences in the new project is known as the ___________ method.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
49
The salary of the project manager and temporary rental space for the project team would be classified as __________ costs.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
50
The estimating approach that is best to use on projects where there is an unusual amount of uncertainty surrounding the project and when it is impractical to estimate times and costs for the entire project is known as ___________.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
51
Jose is forecasting project time and cost for constructing a new building by multiplying the total square footage by a given dollar amount.He is using the ___________ method of top-down estimating.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
52
The estimating factor that considers the decreasing accuracy of estimates as one forecasts activities that are further into the future is known as ____________.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
53
Project costs such as labor and materials are typically classified as ___________ costs.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
54
When someone uses experience and/or information from others to determine the project duration and total cost, ____________ estimating is being used.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
55
The preferred method for situations involving strategic decision making, projects with a high degree of uncertainty, and projects with an unstable scope is the ___________ approach to estimating project time and costs.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
56
The information necessary to conduct a bottom-up estimate of project time and costs starts with the ___________.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
57
The top-down method of estimating when the pooled experience of senior and/or middle managers are used to estimate the total project duration and cost is the _________ method.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
58
Rose is working on estimates for a project that is very similar to a previous project, in that it has many of the same features and those features have similar costs.Each feature or deliverable will represent the same percentage of the total cost as it did for the previous project.Rose is using the _________ method of top-down estimating.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
59
A way to improve estimates on future projects is to collect and archive data on past project estimates and actuals.Creating a ___________ for estimating is a way to achieve this goal.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
60
The estimating factor that considers the tendency to overestimate project time and cost in order to improve the likelihood of meeting the estimates is known as the ___________ factor.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
61
The best way to __________________ is to collect and archive data on past projects.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
62
Costs that are associated with time devoted to the coordination in meetings and briefings as well as time necessary to resolve disconnects between tasks are known as ____________ costs.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
63
As long as everyone in a project adds a little padding to reduce risk, the project duration and cost estimates will be more accurate.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
64
After averaging out the underestimates and overestimates, a long-duration project is more likely to be on target than a short-term, small project.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
65
The ideal approach to estimating project time and costs is to use both the top-down and the bottom-up approach.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
66
A(n)__________ is something that is a valuable but burdensome possession.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
67
Cost, time, and budget estimates are the lifeline for control; they serve as the standard for comparison of the actual and the planned throughout the life of the project.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
68
Project estimates should be broken down into as much detail, and with as much accuracy, as possible.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
69
If time and costs are important to a project the top-down approach to estimating time and costs for the project is the best choice.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
70
Estimates that are typically based on estimates of elements found in the work breakdown structure are called bottom-up estimates.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
71
Organization culture can significantly influence project time and cost estimates.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
72
Estimates should be made based on ___________ conditions, efficient methods, and a normal level of resources.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
73
The process of forecasting or approximating the time and cost of completing project deliverables is called planning.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
74
The project management structure chosen to manage the project will have little impact on the quality of estimates.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
75
If a project is internal to the company and relatively small, the bottom-up approach to estimating time and costs for the project is the best choice.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
76
Top-down estimates usually are derived from someone who uses experience and/or information to determine the project duration and total cost.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
77
Estimating the total cost of a house by multiplying the total square feet by cost per square foot is an example of the apportion method of estimating costs.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
78
Costs that are not directly related to a specific project, such as advertising, accounting, and senior management's salary, are classified as _____________ costs.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
79
Past experience is almost always used primarily in the initial phases of estimating.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck
80
Estimating the total cost of a project by multiplying each major function by a complexity factor is an example of the apportion method of estimating costs.
Unlock Deck
Unlock for access to all 101 flashcards in this deck.
Unlock Deck
k this deck