Deck 18: Methodologies for Supporting Agile Organizations

Full screen (f)
exit full mode
Question
Which gate in the RUP methodology includes building and developing the product?

A) Inception
B) Elaboration
C) Construction
D) Transition
Use Space or
up arrow
down arrow
to flip the card.
Question
What consists of a series of tiny projects?

A) Waterfall methodology
B) Iterative development
C) Agile methodology
D) All of these
Question
Which methodology is owned by IBM?

A) Scrum
B) XP
C) RAD
D) RUP
Question
What breaks a project into tiny phases,and developers cannot continue on to the next phase until the first phase is complete?

A) RAD methodology
B) Agile methodology
C) Waterfall methodology
D) Extreme programming methodology
Question
Which methodology aims for customer satisfaction through early and continuous delivery of useful software components developed by an iterative process with a design point that uses the bare minimum requirements?

A) RAD methodology
B) Agile methodology
C) Waterfall methodology
D) Extreme programming methodology
Question
Which gate in the RUP methodology expands on the agreed-upon details of the system,including the ability to provide an architecture to support and build it.

A) Inception
B) Elaboration
C) Construction
D) Transition
Question
Which of the following is not one of the four gates in the RUP methodology?

A) Inception
B) Collaboration
C) Construction
D) Transition
Question
Which methodology provides a framework for breaking down the development of software into four gates?

A) Scrum
B) XP
C) RAD
D) RUP
Question
Which of the following is an issue related to the waterfall methodology?

A) Flaws in accurately defining and articulating the business problem.
B) Managing costs, resources, and time constraints.
C) Assumes users can specify all business requirements in advance.
D) All of these.
Question
What is the success rate for a project using the waterfall methodology?

A) 1 in 10
B) 2 in 10
C) 4 in 10
D) 8 in 10
Question
Which of the following is not a primary form of agile methodology?

A) RAD
B) SDLC
C) RUP
D) Scrum
Question
How many days is a typical sprint in the scrum methodology?

A) 2 days
B) 10 days
C) 30 days
D) 90 days
Question
Which methodology uses small teams to produce small pieces of deliverable software using sprints,or 30-day intervals,to achieve an appointed goal?

A) Scrum
B) XP
C) RUP
D) RAD
Question
Which of the following is not one of the tenets in the Agile Alliance's manifesto?

A) Satisfy the customer through early and continuous delivery of valuable software.
B) Do not allow changing requirements, especially late in development.
C) Business people and developers must work together daily throughout the project.
D) All of these.
Question
What emphasizes extensive user involvement in the rapid and evolutionary construction of working prototypes of a system to accelerate the systems development process?

A) RAD methodology
B) Agile methodology
C) Waterfall methodology
D) Extreme programming methodology
Question
What is a set of policies,procedures,standards,processes,practices,tools,techniques,and tasks that people apply to technical and management challenges?

A) SDLC
B) Methodology
C) Waterfall
D) Agile
Question
Which of the following describes agile?

A) Fast and efficient
B) Small and nimble
C) Lower cost
D) All of these
Question
Which of the following is a fundamental of the RAD methodology?

A) Focus initially on creating a prototype that looks and acts like the desired system.
B) Actively involve system users in the analysis, design, and development phases.
C) Accelerate collecting the business requirements through an interactive and iterative construction approach.
D) All of these.
Question
Which methodology ends each day or begins with a stand-up meeting to monitor and control the development effort?

A) Scrum
B) XP
C) RUP
D) RAD
Question
What is an activity-based process in which each phase in the SDLC is performed sequentially from planning through implementation and maintenance?

A) RAD methodology
B) Agile methodology
C) Waterfall methodology
D) Extreme programming methodology
Question
The traditional waterfall methodology is a sequential,activity-based process in which each phase in the SDLC is performed sequentially from planning through implementation and maintenance.
Question
Which of the following is not one of the primary principles an organization should follow for successful agile software development?

A) Slash the budget.
B) Keep requirements to a minimum.
C) Test and deliver infrequently.
D) Assign non-IT executives to software projects.
Question
The _________ methodology aims for customer satisfaction through early and continuous delivery of useful software components developed by an iterative process with a design point that uses the bare minimum requirements.
Question
The rapid application development methodology emphasizes extensive user involvement in the rapid and evolutionary construction of working __________ of a system,to accelerate the systems development process.
Question
Compare the waterfall methodology and the agile methodology.
Question
A prototype is a smaller-scale representation or working model of the users' requirements or a proposed design for an information system.
Question
Summarize the different software development methodologies.
Question
The ___________ methodology is a sequential,activity-based process in which each phase in the SDLC is performed sequentially from planning through implementation and maintenance.
Question
Define the relationship between the systems development life cycle and software development methodologies.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/29
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 18: Methodologies for Supporting Agile Organizations
1
Which gate in the RUP methodology includes building and developing the product?

A) Inception
B) Elaboration
C) Construction
D) Transition
C
Explanation: Construction includes building and developing the product.
2
What consists of a series of tiny projects?

A) Waterfall methodology
B) Iterative development
C) Agile methodology
D) All of these
B
Explanation: This is the definition of iterative development.
3
Which methodology is owned by IBM?

A) Scrum
B) XP
C) RAD
D) RUP
D
Explanation: RUP is owned by IBM.
4
What breaks a project into tiny phases,and developers cannot continue on to the next phase until the first phase is complete?

A) RAD methodology
B) Agile methodology
C) Waterfall methodology
D) Extreme programming methodology
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
5
Which methodology aims for customer satisfaction through early and continuous delivery of useful software components developed by an iterative process with a design point that uses the bare minimum requirements?

A) RAD methodology
B) Agile methodology
C) Waterfall methodology
D) Extreme programming methodology
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
6
Which gate in the RUP methodology expands on the agreed-upon details of the system,including the ability to provide an architecture to support and build it.

A) Inception
B) Elaboration
C) Construction
D) Transition
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
7
Which of the following is not one of the four gates in the RUP methodology?

A) Inception
B) Collaboration
C) Construction
D) Transition
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
8
Which methodology provides a framework for breaking down the development of software into four gates?

A) Scrum
B) XP
C) RAD
D) RUP
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
9
Which of the following is an issue related to the waterfall methodology?

A) Flaws in accurately defining and articulating the business problem.
B) Managing costs, resources, and time constraints.
C) Assumes users can specify all business requirements in advance.
D) All of these.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
10
What is the success rate for a project using the waterfall methodology?

A) 1 in 10
B) 2 in 10
C) 4 in 10
D) 8 in 10
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
11
Which of the following is not a primary form of agile methodology?

A) RAD
B) SDLC
C) RUP
D) Scrum
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
12
How many days is a typical sprint in the scrum methodology?

A) 2 days
B) 10 days
C) 30 days
D) 90 days
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
13
Which methodology uses small teams to produce small pieces of deliverable software using sprints,or 30-day intervals,to achieve an appointed goal?

A) Scrum
B) XP
C) RUP
D) RAD
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
14
Which of the following is not one of the tenets in the Agile Alliance's manifesto?

A) Satisfy the customer through early and continuous delivery of valuable software.
B) Do not allow changing requirements, especially late in development.
C) Business people and developers must work together daily throughout the project.
D) All of these.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
15
What emphasizes extensive user involvement in the rapid and evolutionary construction of working prototypes of a system to accelerate the systems development process?

A) RAD methodology
B) Agile methodology
C) Waterfall methodology
D) Extreme programming methodology
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
16
What is a set of policies,procedures,standards,processes,practices,tools,techniques,and tasks that people apply to technical and management challenges?

A) SDLC
B) Methodology
C) Waterfall
D) Agile
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
17
Which of the following describes agile?

A) Fast and efficient
B) Small and nimble
C) Lower cost
D) All of these
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
18
Which of the following is a fundamental of the RAD methodology?

A) Focus initially on creating a prototype that looks and acts like the desired system.
B) Actively involve system users in the analysis, design, and development phases.
C) Accelerate collecting the business requirements through an interactive and iterative construction approach.
D) All of these.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
19
Which methodology ends each day or begins with a stand-up meeting to monitor and control the development effort?

A) Scrum
B) XP
C) RUP
D) RAD
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
20
What is an activity-based process in which each phase in the SDLC is performed sequentially from planning through implementation and maintenance?

A) RAD methodology
B) Agile methodology
C) Waterfall methodology
D) Extreme programming methodology
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
21
The traditional waterfall methodology is a sequential,activity-based process in which each phase in the SDLC is performed sequentially from planning through implementation and maintenance.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
22
Which of the following is not one of the primary principles an organization should follow for successful agile software development?

A) Slash the budget.
B) Keep requirements to a minimum.
C) Test and deliver infrequently.
D) Assign non-IT executives to software projects.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
23
The _________ methodology aims for customer satisfaction through early and continuous delivery of useful software components developed by an iterative process with a design point that uses the bare minimum requirements.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
24
The rapid application development methodology emphasizes extensive user involvement in the rapid and evolutionary construction of working __________ of a system,to accelerate the systems development process.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
25
Compare the waterfall methodology and the agile methodology.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
26
A prototype is a smaller-scale representation or working model of the users' requirements or a proposed design for an information system.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
27
Summarize the different software development methodologies.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
28
The ___________ methodology is a sequential,activity-based process in which each phase in the SDLC is performed sequentially from planning through implementation and maintenance.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
29
Define the relationship between the systems development life cycle and software development methodologies.
Unlock Deck
Unlock for access to all 29 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 29 flashcards in this deck.