Deck 22: Maintenance

Full screen (f)
exit full mode
Question
The cost of replacement is not considered as part of maintenance analysis.
Use Space or
up arrow
down arrow
to flip the card.
Question
In the broadest sense,preventive maintenance extends back to the installation stage of equipment and facilities.
Question
The goal of maintenance is to maintain the productive system in good working order at minimum costs.
Question
One basis for scheduling preventive maintenance is the passage of time.
Question
The optimum amount of preventive maintenance is where:

A)total breakdown costs are a minimum.
B)total preventive maintenance costs are a minimum.
C)each maintenance component cost is a minimum.
D)total maintenance costs are a maximum.
E)total maintenance costs are a minimum.
Question
Reliability-centered maintenance is based on historical data and ongoing monitoring of equipment condition.
Question
Breakdown maintenance is _________ preventative maintenance is _____.

A)reactive; proactive
B)proactive; reactive
C)expensive; inexpensive
D)inexpensive; expensive
E)unexpected; expected
Question
Breakdown maintenance includes activities such as equipment inspection and adjustment.
Question
Cost of equipment breakdown does not include:

A)loss of output
B)cost of idle workers
C)damage to other equipment
D)injuries to workers
E)preventive maintenance cost
Question
Ideally,preventive maintenance will be performed just prior to a breakdown or failure.
Question
Breakdown maintenance takes the form of scheduled periodic maintenance.
Question
In the area of maintenance,there is a trade-off between the cost of preventive maintenance and breakdown (emergency)maintenance.
Question
Predictive maintenance is a major part of reliability-centered maintenance.
Question
The degree of technology involved is a factor affecting the decision of how much preventive maintenance is desirable.
Question
Planned periodic inspections is one method of determining when preventive maintenance activities should be performed.
Question
Which of the following is most closely associated with breakdown maintenance?

A)Equipment adjustments
B)Equipment cleaning
C)Equipment inspection
D)Repair of broken parts
E)Replacement of worn parts
Question
Maintenance activities are often organized into the two groups: buildings and grounds,and equipment maintenance.
Question
Maintenance activities are often organized into the two groups:

A)breakdown maintenance and preventive maintenance.
B)breakdown maintenance and predictive maintenance.
C)preventive maintenance and predictive maintenance.
D)equipment maintenance and breakdown maintenance.
E)equipment maintenance and buildings maintenance.
Question
Factors affecting the decision of how much preventive maintenance is desirable typically include all of the following EXCEPT:

A)age of equipment.
B)type of product.
C)degree of technology.
D)type of production process.
E)condition of facilities and equipment.
Question
The goal of maintenance is to maintain the productive system in good working order while minimizing:

A)total preventive maintenance costs.
B)total breakdown maintenance costs.
C)total maintenance costs.
D)the difference between preventive and breakdown costs.
E)the ratio of breakdown to preventive maintenance costs.
Question
When breakdowns become frequent and/or costly,managers are faced with a trade-off decision between the cost of continued maintenance and the cost of ________________.

A)passage of time
B)preventive maintenance
C)breakdowns
D)replacement
E)reliability
Question
Ideally,preventive maintenance will be performed:

A)after a planned inspection.
B)after the passage of a specified period of time.
C)after a predetermined number of operating hours.
D)just prior to the start of the workday.
E)just prior to a breakdown.
Question
"Total productive maintenance" is best described as:

A)avoiding all breakdown maintenance.
B)doing a great deal of preventative maintenance to try to avoid breakdown maintenance.
C)having workers that operate equipment responsible for performing maintenance.
D)extending preventative maintenance back to design.
E)simultaneously changing all components that are subject to a breakdown.
Question
The frequency of breakdown of a piece of equipment is 2.55 breakdowns per month.The cost of a breakdown is $1,000 and the cost of preventive maintenance is $2,000 per month.Assume that the equipment breakdown can be avoided if preventive maintenance is performed.Should the manager use preventive maintenance,or would it be better to fix the equipment when it breaks down?
Question
The average time before breakdown of a machine is normally distributed and has a mean of 11 weeks and a standard deviation of 2.5 weeks.If breakdown cost averages $2,500 and preventive maintenance costs $500,what is the optimal preventive maintenance interval?
Question
The type of maintenance which is reactive in nature is:

A)breakdown maintenance.
B)predictive maintenance.
C)preventive maintenance.
D)total productive maintenance.
E)reliability-centered maintenance.
Question
Reliability-centered maintenance is an approach based on:

A)dealing with breakdowns after they occur.
B)reducing the effect of each major cause of failure.
C)increasing frequency of preventive maintenance.
D)predictions based on historical data.
E)routine planned inspections.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/27
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 22: Maintenance
1
The cost of replacement is not considered as part of maintenance analysis.
False
2
In the broadest sense,preventive maintenance extends back to the installation stage of equipment and facilities.
True
3
The goal of maintenance is to maintain the productive system in good working order at minimum costs.
True
4
One basis for scheduling preventive maintenance is the passage of time.
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
5
The optimum amount of preventive maintenance is where:

A)total breakdown costs are a minimum.
B)total preventive maintenance costs are a minimum.
C)each maintenance component cost is a minimum.
D)total maintenance costs are a maximum.
E)total maintenance costs are a minimum.
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
6
Reliability-centered maintenance is based on historical data and ongoing monitoring of equipment condition.
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
7
Breakdown maintenance is _________ preventative maintenance is _____.

A)reactive; proactive
B)proactive; reactive
C)expensive; inexpensive
D)inexpensive; expensive
E)unexpected; expected
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
8
Breakdown maintenance includes activities such as equipment inspection and adjustment.
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
9
Cost of equipment breakdown does not include:

A)loss of output
B)cost of idle workers
C)damage to other equipment
D)injuries to workers
E)preventive maintenance cost
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
10
Ideally,preventive maintenance will be performed just prior to a breakdown or failure.
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
11
Breakdown maintenance takes the form of scheduled periodic maintenance.
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
12
In the area of maintenance,there is a trade-off between the cost of preventive maintenance and breakdown (emergency)maintenance.
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
13
Predictive maintenance is a major part of reliability-centered maintenance.
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
14
The degree of technology involved is a factor affecting the decision of how much preventive maintenance is desirable.
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
15
Planned periodic inspections is one method of determining when preventive maintenance activities should be performed.
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
16
Which of the following is most closely associated with breakdown maintenance?

A)Equipment adjustments
B)Equipment cleaning
C)Equipment inspection
D)Repair of broken parts
E)Replacement of worn parts
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
17
Maintenance activities are often organized into the two groups: buildings and grounds,and equipment maintenance.
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
18
Maintenance activities are often organized into the two groups:

A)breakdown maintenance and preventive maintenance.
B)breakdown maintenance and predictive maintenance.
C)preventive maintenance and predictive maintenance.
D)equipment maintenance and breakdown maintenance.
E)equipment maintenance and buildings maintenance.
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
19
Factors affecting the decision of how much preventive maintenance is desirable typically include all of the following EXCEPT:

A)age of equipment.
B)type of product.
C)degree of technology.
D)type of production process.
E)condition of facilities and equipment.
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
20
The goal of maintenance is to maintain the productive system in good working order while minimizing:

A)total preventive maintenance costs.
B)total breakdown maintenance costs.
C)total maintenance costs.
D)the difference between preventive and breakdown costs.
E)the ratio of breakdown to preventive maintenance costs.
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
21
When breakdowns become frequent and/or costly,managers are faced with a trade-off decision between the cost of continued maintenance and the cost of ________________.

A)passage of time
B)preventive maintenance
C)breakdowns
D)replacement
E)reliability
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
22
Ideally,preventive maintenance will be performed:

A)after a planned inspection.
B)after the passage of a specified period of time.
C)after a predetermined number of operating hours.
D)just prior to the start of the workday.
E)just prior to a breakdown.
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
23
"Total productive maintenance" is best described as:

A)avoiding all breakdown maintenance.
B)doing a great deal of preventative maintenance to try to avoid breakdown maintenance.
C)having workers that operate equipment responsible for performing maintenance.
D)extending preventative maintenance back to design.
E)simultaneously changing all components that are subject to a breakdown.
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
24
The frequency of breakdown of a piece of equipment is 2.55 breakdowns per month.The cost of a breakdown is $1,000 and the cost of preventive maintenance is $2,000 per month.Assume that the equipment breakdown can be avoided if preventive maintenance is performed.Should the manager use preventive maintenance,or would it be better to fix the equipment when it breaks down?
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
25
The average time before breakdown of a machine is normally distributed and has a mean of 11 weeks and a standard deviation of 2.5 weeks.If breakdown cost averages $2,500 and preventive maintenance costs $500,what is the optimal preventive maintenance interval?
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
26
The type of maintenance which is reactive in nature is:

A)breakdown maintenance.
B)predictive maintenance.
C)preventive maintenance.
D)total productive maintenance.
E)reliability-centered maintenance.
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
27
Reliability-centered maintenance is an approach based on:

A)dealing with breakdowns after they occur.
B)reducing the effect of each major cause of failure.
C)increasing frequency of preventive maintenance.
D)predictions based on historical data.
E)routine planned inspections.
Unlock Deck
Unlock for access to all 27 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 27 flashcards in this deck.