Question
Which of the following can be included in processing time?

A)Machine time
B)Configuring work center
C)Configuring equipment
D)Labor time
E)Setup time
Use Space or
up arrow
down arrow
to flip the card.
Question
What does a stock requirement list contain?

A)Material
B)BOM
C)Plant
D)MRP type
E)All of the above
Question
A production order typically includes references to which of the following?

A)BOM
B)Routing
C)Work centers
D)Sales order
E)PRT
Question
Which of the following are included in the header information of a production order?

A)Status
B)Work center
C)Plant
D)Validity
E)Material number
Question
In process industries like chemicals and beverages,the bill of materials is also known as an)

A)Formula
B)List of chemicals
C)Bill of chemicals
D)Equation
E)Material list
Question
What are the basic time elements in the production process?

A)Setup time
B)Alternate time
C)Build time
D)Teardown time
E)Processing time
Question
A planned order is a formal request that indicates

A)How many units of a product are needed
B)Where the finished goods are to be shipped
C)What materials are needed
D)Where the raw materials are stored
E)When the materials are needed
Question
Which one of the following best describes a work center?

A)A location where materials are placed right before they are shipped
B)Another term used to describe an office building
C)A location where value-added work needed to produce a material is carried out
D)A shipping dock
E)A storage shelf in a warehouse
Question
Which are the following are options when a production manager receives a planned order?

A)Create an alternate planned order
B)Reject the planned order
C)Combine the planned order with other orders
D)Authorize the production
E)Return the order to purchasing
Question
Which one of the following is NOT a type of organizational data relevant to the production process?

A)Company code
B)Credit control area
C)Client
D)Storage location
E)Plant
Question
Which of the following are the general classifications of time elements in production?

A)Floating
B)Volatile
C)Fixed
D)Explosive
E)Variable
Question
The material master is grouped into different views or segments based on which factors?

A)Processes that use the materials
B)Material type
C)Organizational level
D)Material composition
E)Material description
Question
Which of the following are statuses that can apply to a BOM?

A)On
B)Off
C)Active
D)Inactive
E)Open
Question
What are the organizational data that are included in a planned order?

A)Client
B)Company code
C)Plant
D)Storage location
E)Bill of materials
Question
Which user inputs are included in a goods receipt?

A)Plant
B)Material master
C)Quantities
D)Dates
E)Production order number
Question
Examples of production resource tools are

A)Raw materials
B)Fixtures
C)Engineering drawings
D)Calibration instruments
E)Warehouse building
Question
The master data relevant to the production process are

A)Work centers
B)Material master
C)Bills of material
D)Client
E)Company code
Question
What data are included in a confirmation?

A)Where the work was completed
B)How much raw material was used
C)Who the material is to be shipped to
D)How much work was completed
E)Who completed the work
Question
SAP ERP systems can communicate with

A)Shop floor control systems
B)PDC systems
C)Systems that automate tasks in work centers
D)Storage facilities
E)None of the above
Question
Which one of the following are key organizational data relevant to the production process?

A)Company code
B)Credit control area
C)Client
D)Storage location
E)Plant
Question
Which of the following is not a step in the production process?

A)Production authorization
B)Goods issue
C)Request production
D)Billing
E)Order release
Question
The creation of a production order results in several outcomes including all of the following except

A)Scheduling
B)Availability checks
C)Purchase requisitions
D)Preliminary costing
E)Confirmation
Question
When the finished goods have been produced the SAP ERP system allows a user to record which of the following?

A)Confirmation
B)Goods issue
C)Order release
D)Goods receipt
E)Authorize production
Question
If a company has adopted the make-to-stock strategy,what is the trigger for the production of goods?

A)Need to increase inventory
B)Customer order
C)Request for quotation
D)Customer inquiry
E)Billing document
Question
Which of the following is not an outcome of a goods issue to a production order?

A)The material master is updated to reflect the reduction in the quantity and value of the materials issued
B)Actual costs associated with material consumption are calculated
C)Material reservations are updated
D)A goods receipt is automatically recorded
E)An FI document is created to record financial accounting data
Question
Variable time elements are independent of how many units of material are produced.
Question
All of the following can serve as a work center except

A)A group of machines
B)A group of people responsible for completing operations
C)A production line
D)A work area
E)A shipping dock
Question
Which of the following does a routing identify on a production order?

A)The materials or components to be used in production
B)The location where operations are to be performed
C)The capacity requirements of the production order
D)The location of raw materials in the warehouse
E)The operations needed to produce a material
Question
What step in the production process is used to enter data in to the SAP ERP system when the operations needed to produce a materials are completed?

A)Production note
B)Confirmation
C)Order complete
D)Production record
E)Production outcome
Question
A bill of materials identifies the finished goods that are to be shipped to a specific customer.
Question
Which of the following is an important report in the production process?

A)Work list
B)Stock requirement list
C)Online list
D)BOM
E)None of the above
Question
What term identifies the list of materials needed to produce one or more units of a finished good?

A)Routing
B)Source materials
C)Component listing
D)Bill of components
E)Bill of materials
Question
An active bill of materials can be used in the production of a material,but an inactive BOM cannot.
Question
A work center is a location where materials are placed immediately before they are shipped.
Question
Which one of the following best defines material staging?

A)Component materials are moved into storage
B)Component materials are received from the vendor
C)Component materials are moved from storage and prepared for use
D)Defective returned goods are broken down into several components for refurbishment
E)Finished materials are moved back into a storage area
Question
All operations must be performed in some type of sequence,and many operations can be completed in a variety of sequences.
Question
Fixed time elements represent the time needed to produce one unit of material.
Question
What operation in the routing is sometimes necessary to prepare materials for use in production?

A)Backflushing
B)Confirmation
C)Material staging
D)Recall
E)Reservation
Question
At what level are material requirements planning MRP)and work scheduling data defined?

A)Client level
B)Plant level
C)Company code level
D)Sales area level
E)Production level
Question
What term describes two simultaneous series of operations needed to build components for a finished product?

A)Parallel sequences
B)Alternate sequences
C)Same sequence
D)Line sequence
E)Production sequence
Question
Production resource tools are movable resources that are shared among different work centers.
Question
Material staging is a technique that is used to automatically record the goods issue when an order is confirmed
Question
Typically a production order does not include any references to the BOM,routing,or work centers.
Question
If the bill of materials and the routing data are changed after the production order has been created,the system must be manually instructed to reenter the data
Question
Periodic processing is also known as period-end closing
Question
Capacity split is a strategy that is used to determine how the production work is to be distributed among machines and/or people
Question
A time ticket is used to record the amount of time required to complete various operations
Question
Component assignment is a technique that assigns components in a BOM either to a routing or to a specific operation within the routing.
Question
Material staging is the process in which component materials are moved from storage and prepared for use.
Question
A technically complete status for a production order means that even though the main material is complete,other production processes may be needed to complete smaller components of the material
Question
Overhead allocation,work in process determination,and order settlement are all included in periodic processing
Question
After production has been completed,a goods receipt against the production order is used to pick the goods and ship them to the customer
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/52
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 6: The Production Process
1
Which of the following can be included in processing time?

A)Machine time
B)Configuring work center
C)Configuring equipment
D)Labor time
E)Setup time
A,D
2
What does a stock requirement list contain?

A)Material
B)BOM
C)Plant
D)MRP type
E)All of the above
A,C,D
3
A production order typically includes references to which of the following?

A)BOM
B)Routing
C)Work centers
D)Sales order
E)PRT
A,B.C,E
4
Which of the following are included in the header information of a production order?

A)Status
B)Work center
C)Plant
D)Validity
E)Material number
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
5
In process industries like chemicals and beverages,the bill of materials is also known as an)

A)Formula
B)List of chemicals
C)Bill of chemicals
D)Equation
E)Material list
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
6
What are the basic time elements in the production process?

A)Setup time
B)Alternate time
C)Build time
D)Teardown time
E)Processing time
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
7
A planned order is a formal request that indicates

A)How many units of a product are needed
B)Where the finished goods are to be shipped
C)What materials are needed
D)Where the raw materials are stored
E)When the materials are needed
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
8
Which one of the following best describes a work center?

A)A location where materials are placed right before they are shipped
B)Another term used to describe an office building
C)A location where value-added work needed to produce a material is carried out
D)A shipping dock
E)A storage shelf in a warehouse
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
9
Which are the following are options when a production manager receives a planned order?

A)Create an alternate planned order
B)Reject the planned order
C)Combine the planned order with other orders
D)Authorize the production
E)Return the order to purchasing
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
10
Which one of the following is NOT a type of organizational data relevant to the production process?

A)Company code
B)Credit control area
C)Client
D)Storage location
E)Plant
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
11
Which of the following are the general classifications of time elements in production?

A)Floating
B)Volatile
C)Fixed
D)Explosive
E)Variable
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
12
The material master is grouped into different views or segments based on which factors?

A)Processes that use the materials
B)Material type
C)Organizational level
D)Material composition
E)Material description
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
13
Which of the following are statuses that can apply to a BOM?

A)On
B)Off
C)Active
D)Inactive
E)Open
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
14
What are the organizational data that are included in a planned order?

A)Client
B)Company code
C)Plant
D)Storage location
E)Bill of materials
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
15
Which user inputs are included in a goods receipt?

A)Plant
B)Material master
C)Quantities
D)Dates
E)Production order number
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
16
Examples of production resource tools are

A)Raw materials
B)Fixtures
C)Engineering drawings
D)Calibration instruments
E)Warehouse building
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
17
The master data relevant to the production process are

A)Work centers
B)Material master
C)Bills of material
D)Client
E)Company code
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
18
What data are included in a confirmation?

A)Where the work was completed
B)How much raw material was used
C)Who the material is to be shipped to
D)How much work was completed
E)Who completed the work
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
19
SAP ERP systems can communicate with

A)Shop floor control systems
B)PDC systems
C)Systems that automate tasks in work centers
D)Storage facilities
E)None of the above
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
20
Which one of the following are key organizational data relevant to the production process?

A)Company code
B)Credit control area
C)Client
D)Storage location
E)Plant
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
21
Which of the following is not a step in the production process?

A)Production authorization
B)Goods issue
C)Request production
D)Billing
E)Order release
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
22
The creation of a production order results in several outcomes including all of the following except

A)Scheduling
B)Availability checks
C)Purchase requisitions
D)Preliminary costing
E)Confirmation
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
23
When the finished goods have been produced the SAP ERP system allows a user to record which of the following?

A)Confirmation
B)Goods issue
C)Order release
D)Goods receipt
E)Authorize production
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
24
If a company has adopted the make-to-stock strategy,what is the trigger for the production of goods?

A)Need to increase inventory
B)Customer order
C)Request for quotation
D)Customer inquiry
E)Billing document
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
25
Which of the following is not an outcome of a goods issue to a production order?

A)The material master is updated to reflect the reduction in the quantity and value of the materials issued
B)Actual costs associated with material consumption are calculated
C)Material reservations are updated
D)A goods receipt is automatically recorded
E)An FI document is created to record financial accounting data
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
26
Variable time elements are independent of how many units of material are produced.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
27
All of the following can serve as a work center except

A)A group of machines
B)A group of people responsible for completing operations
C)A production line
D)A work area
E)A shipping dock
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
28
Which of the following does a routing identify on a production order?

A)The materials or components to be used in production
B)The location where operations are to be performed
C)The capacity requirements of the production order
D)The location of raw materials in the warehouse
E)The operations needed to produce a material
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
29
What step in the production process is used to enter data in to the SAP ERP system when the operations needed to produce a materials are completed?

A)Production note
B)Confirmation
C)Order complete
D)Production record
E)Production outcome
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
30
A bill of materials identifies the finished goods that are to be shipped to a specific customer.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
31
Which of the following is an important report in the production process?

A)Work list
B)Stock requirement list
C)Online list
D)BOM
E)None of the above
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
32
What term identifies the list of materials needed to produce one or more units of a finished good?

A)Routing
B)Source materials
C)Component listing
D)Bill of components
E)Bill of materials
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
33
An active bill of materials can be used in the production of a material,but an inactive BOM cannot.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
34
A work center is a location where materials are placed immediately before they are shipped.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
35
Which one of the following best defines material staging?

A)Component materials are moved into storage
B)Component materials are received from the vendor
C)Component materials are moved from storage and prepared for use
D)Defective returned goods are broken down into several components for refurbishment
E)Finished materials are moved back into a storage area
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
36
All operations must be performed in some type of sequence,and many operations can be completed in a variety of sequences.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
37
Fixed time elements represent the time needed to produce one unit of material.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
38
What operation in the routing is sometimes necessary to prepare materials for use in production?

A)Backflushing
B)Confirmation
C)Material staging
D)Recall
E)Reservation
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
39
At what level are material requirements planning MRP)and work scheduling data defined?

A)Client level
B)Plant level
C)Company code level
D)Sales area level
E)Production level
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
40
What term describes two simultaneous series of operations needed to build components for a finished product?

A)Parallel sequences
B)Alternate sequences
C)Same sequence
D)Line sequence
E)Production sequence
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
41
Production resource tools are movable resources that are shared among different work centers.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
42
Material staging is a technique that is used to automatically record the goods issue when an order is confirmed
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
43
Typically a production order does not include any references to the BOM,routing,or work centers.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
44
If the bill of materials and the routing data are changed after the production order has been created,the system must be manually instructed to reenter the data
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
45
Periodic processing is also known as period-end closing
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
46
Capacity split is a strategy that is used to determine how the production work is to be distributed among machines and/or people
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
47
A time ticket is used to record the amount of time required to complete various operations
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
48
Component assignment is a technique that assigns components in a BOM either to a routing or to a specific operation within the routing.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
49
Material staging is the process in which component materials are moved from storage and prepared for use.
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
50
A technically complete status for a production order means that even though the main material is complete,other production processes may be needed to complete smaller components of the material
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
51
Overhead allocation,work in process determination,and order settlement are all included in periodic processing
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
52
After production has been completed,a goods receipt against the production order is used to pick the goods and ship them to the customer
Unlock Deck
Unlock for access to all 52 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 52 flashcards in this deck.