A hole can be dug in one hour with a small shovel and in half an hour with a large shovel.
1. What is the RTS of labor time for shovel size?
2. What does the ''one hole'' isoquant look like? How much time would it take a worker to dig a hole if he or she used a small shovel for half the hole, then switched to the large shovel?
1. What is the RTS of labor time for shovel size?
2. What does the ''one hole'' isoquant look like? How much time would it take a worker to dig a hole if he or she used a small shovel for half the hole, then switched to the large shovel?
Explanation
A small shovel takes 1 hour to dig a hol...