
Engineering Economy 7th Edition by Leland Blank ,Anthony Tarquin
Edition 7ISBN: 978-0073376301
Engineering Economy 7th Edition by Leland Blank ,Anthony Tarquin
Edition 7ISBN: 978-0073376301 Exercise 35
A new bridge across the Allegheny River in Pittsburgh is expected to be permanent and will have an initial cost of $30 million. This bridge must be resurfaced every 5 years at a cost of $1 million. The annual inspection and operating costs are estimated to be $50,000. Determine its equivalent annual worth at an interest rate of 10% per year.
Explanation
Annual worth and the recovery amount of ...
Engineering Economy 7th Edition by Leland Blank ,Anthony Tarquin
Why don’t you like this exercise?
Other Minimum 8 character and maximum 255 character
Character 255

