Exercise 10
Draw an operations process chart for the assembly of a ballpoint pen. The pen is made from three subassemblies (see figure): Draw an operations process chart for the assembly of a ballpoint pen. The pen is made from three subassemblies (see figure):    1. upper barrel 2. cartridge 3. lower barrel Operation 1 attach clip to upper barrel 2 insert button into upper barrel 3 insert rotor into upper barrel 4 press ball into tip of cartridge 5 insert tip into cartridge 6 fill cartridge with ink Inspection 1 test cartridge Operation 7 insert cartridge into upper barrel 8 slip spring over cartridge 9 screw lower barrel and upper barrel together Inspection 2 test operation of pen 3 final inspection
1. upper barrel
2. cartridge
3. lower barrel
Operation 1 attach clip to upper barrel
2 insert button into upper barrel
3 insert rotor into upper barrel
4 press ball into tip of cartridge
5 insert tip into cartridge
6 fill cartridge with ink
Inspection 1 test cartridge
Operation 7 insert cartridge into upper barrel
8 slip spring over cartridge
9 screw lower barrel and upper barrel together
Inspection 2 test operation of pen
3 final inspection
Explanation
Verified
like image
like image

Operation process chart: