expand icon
book Cornerstones of Managerial Accounting 6th Edition by Maryanne Mowen,Don Hansen ,Dan Heitger cover

Cornerstones of Managerial Accounting 6th Edition by Maryanne Mowen,Don Hansen ,Dan Heitger

Edition 6ISBN: 978-1305103962
book Cornerstones of Managerial Accounting 6th Edition by Maryanne Mowen,Don Hansen ,Dan Heitger cover

Cornerstones of Managerial Accounting 6th Edition by Maryanne Mowen,Don Hansen ,Dan Heitger

Edition 6ISBN: 978-1305103962
Exercise 79
Applying Overhead to Jobs, Costing Jobs
Jagjit Company designs and builds retaining walls for individual customers. On August 1, there were two jobs in process: Job 93 with a beginning balance of $8,750, and Job 94 with a beginning balance of $7,300. Jagjit applies overhead at the rate of $8 per direct labor hour. Direct labor wages average $18 per hour.
Data on August costs for all jobs are as follows:
Applying Overhead to Jobs, Costing Jobs  Jagjit Company designs and builds retaining walls for individual customers. On August 1, there were two jobs in process: Job 93 with a beginning balance of $8,750, and Job 94 with a beginning balance of $7,300. Jagjit applies overhead at the rate of $8 per direct labor hour. Direct labor wages average $18 per hour. Data on August costs for all jobs are as follows:     During August, Jobs 95 and 96 were started. Job 93 was completed on August 17, and the client was billed at cost plus 40%. All other jobs remained in process. Required:  1. Calculate the number of direct labor hours that were worked on each job in August. 2. Calculate the overhead applied to each job during the month of August. 3. Prepare job-order cost sheets for each job as of the end of August. 4. Calculate the balance in Work in Process on August 31. 5. What is the price of Job 93? 6. CONCEPTUAL CONNECTION Partway though the year, Jagjit bought a bulldozer to handle larger jobs. The bulldozer cost $38,000 and is needed for larger commercial jobs. Smaller residential jobs can still be done with the smaller bobcat tractor. How could the bulldozer's cost be applied to only those jobs that need the larger equipment?
During August, Jobs 95 and 96 were started. Job 93 was completed on August 17, and the client was billed at cost plus 40%. All other jobs remained in process.
Required:
1. Calculate the number of direct labor hours that were worked on each job in August.
2. Calculate the overhead applied to each job during the month of August.
3. Prepare job-order cost sheets for each job as of the end of August.
4. Calculate the balance in Work in Process on August 31.
5. What is the price of Job 93?
6. CONCEPTUAL CONNECTION Partway though the year, Jagjit bought a bulldozer to handle larger jobs. The bulldozer cost $38,000 and is needed for larger commercial jobs. Smaller residential jobs can still be done with the smaller bobcat tractor. How could the bulldozer's cost be applied to only those jobs that need the larger equipment?
Explanation
Verified
like image
like image

Job costing:
It is a method of costing ...

close menu
Cornerstones of Managerial Accounting 6th Edition by Maryanne Mowen,Don Hansen ,Dan Heitger
cross icon