Deck 33: Residential Utility-Interactive Photovoltaic Systems

Full screen (f)
exit full mode
Question
A single small inverter connected to each photovoltaic module is known as a ____-inverter.

A) mini
B) sub
C) partial
D) micro
Use Space or
up arrow
down arrow
to flip the card.
Question
When determining the circuit size and current of a PV system, first use a multiplier to calculate the maximum source circuit current, then apply a second multiplier to determine the size of system conductors and ____________________.
Question
NEC 690.7(C) limits photovoltaic source and output circuits to 600 volts or less for one- and two-family dwellings.
Question
Photovoltaic modules that also serve as an outer protective finish for a building are known as structure-integrated photovoltaic (SIPV) modules.
Question
Inverter size is based on the ____ of the array.

A) size
B) weight
C) capacity
D) age
Question
What are buildings with stand-alone or utility-interactive PV systems required to have indicating the presence of the system and location(s) of disconnecting means?
Question
Most residential PV systems are made up of ____ strings that can be combined in a single box.

A) three
B) three to six
C) eight or more
D) six to ten
Question
How are the sizes of PV system conductors and components determined?
Question
An inverter or ac module is required to automatically ____ its output when utility power is lost.

A) de-energize
B) energize
C) increase
D) halt
Question
All photovoltaic modules are required by the NEC to be listed to nationally recognized standards.
Question
A connection on the ____________________ side of the main disconnect is known as a supply-side point of connection.
Question
Exposed single-conductor cable is permitted to be installed for array interconnection, and only types ____ and listed PV wire are permitted.

A) USE
B) USE-2
C) PV-2
D) USP
Question
Define anti-islanding.
Question
If circuit conductors for PV systems were sized using the requirements of 690.8(B) and there are no external sources of parallel currents that exceed the ampacity of the conductors, then overcurrent protection is required.
Question
A dedicated PV system circuit breaker, suitable for backfeed and positioned at the opposite end of the bus from the ____, is a requirement of NEC 705.12(B).

A) panelboard
B) disconnecting means
C) main circuit breaker
D) modules
Question
According to 690.41, one conductor of a 2-wire PV system over ____________________ volts shall be grounded.
Question
A disconnect for the ungrounded dc string conductor(s) is never required before the conductors enter the dwelling.
Question
A photovoltaic module is a manufactured unit made up of many semi-conductor PV cells encased in a protective covering and mounted to a(n) ____________________.
Question
A combination of factors recently has made photovoltaic systems very popular including ____.

A) environmental concerns with the use of fossil fuels
B) concern over dependence on foreign sources of energy
C) decreased efficiency of fossil fuels
D) both a and b
Question
A grounding electrode system is required for ____ photovoltaic systems.

A) dc
B) ac
C) both dc and ac
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/20
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 33: Residential Utility-Interactive Photovoltaic Systems
1
A single small inverter connected to each photovoltaic module is known as a ____-inverter.

A) mini
B) sub
C) partial
D) micro
D
2
When determining the circuit size and current of a PV system, first use a multiplier to calculate the maximum source circuit current, then apply a second multiplier to determine the size of system conductors and ____________________.
overcurrent devices
3
NEC 690.7(C) limits photovoltaic source and output circuits to 600 volts or less for one- and two-family dwellings.
True
4
Photovoltaic modules that also serve as an outer protective finish for a building are known as structure-integrated photovoltaic (SIPV) modules.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
5
Inverter size is based on the ____ of the array.

A) size
B) weight
C) capacity
D) age
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
6
What are buildings with stand-alone or utility-interactive PV systems required to have indicating the presence of the system and location(s) of disconnecting means?
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
7
Most residential PV systems are made up of ____ strings that can be combined in a single box.

A) three
B) three to six
C) eight or more
D) six to ten
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
8
How are the sizes of PV system conductors and components determined?
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
9
An inverter or ac module is required to automatically ____ its output when utility power is lost.

A) de-energize
B) energize
C) increase
D) halt
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
10
All photovoltaic modules are required by the NEC to be listed to nationally recognized standards.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
11
A connection on the ____________________ side of the main disconnect is known as a supply-side point of connection.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
12
Exposed single-conductor cable is permitted to be installed for array interconnection, and only types ____ and listed PV wire are permitted.

A) USE
B) USE-2
C) PV-2
D) USP
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
13
Define anti-islanding.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
14
If circuit conductors for PV systems were sized using the requirements of 690.8(B) and there are no external sources of parallel currents that exceed the ampacity of the conductors, then overcurrent protection is required.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
15
A dedicated PV system circuit breaker, suitable for backfeed and positioned at the opposite end of the bus from the ____, is a requirement of NEC 705.12(B).

A) panelboard
B) disconnecting means
C) main circuit breaker
D) modules
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
16
According to 690.41, one conductor of a 2-wire PV system over ____________________ volts shall be grounded.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
17
A disconnect for the ungrounded dc string conductor(s) is never required before the conductors enter the dwelling.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
18
A photovoltaic module is a manufactured unit made up of many semi-conductor PV cells encased in a protective covering and mounted to a(n) ____________________.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
19
A combination of factors recently has made photovoltaic systems very popular including ____.

A) environmental concerns with the use of fossil fuels
B) concern over dependence on foreign sources of energy
C) decreased efficiency of fossil fuels
D) both a and b
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
20
A grounding electrode system is required for ____ photovoltaic systems.

A) dc
B) ac
C) both dc and ac
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 20 flashcards in this deck.