Question
Create & Sell Manufacturing Inc.uses a Kanban system for a component.The daily demand is 175 units.Each container has a combined waiting and processing time of 0.20 days.If the container size is 10 brackets and the safety factor is 11 percent,how many Kanban card sets should be authorized?

A) 2
B) 4
C) 6
D) 7
Use Space or
up arrow
down arrow
to flip the card.
Question
A company is using a Kanban system with 2 containers,each holding 50 parts,between a downstream (using)and an upstream (producing)work center.The using work center can handle 250 jobs per day.The average elapsed time for the entire cycle is currently 0.25 days.The company is concerned about the safety factor for the operation.Which of the following is the safety factor (α)of the current operation?

A) 20 percent
B) 60 percent
C) 80 percent
D) 40 percent
Question
Lean Six Sigma focuses on real dollar savings and has the ability to make significant financial impacts on an organization.
Question
Any activity,material,or operation that does not add value in an organization is considered waste.
Question
In the Timken company's bootcamp,employees and managers try to solve problems,such as removing non-value-added steps from processes to try to eliminate waste.
Question
Long setup times enable a manufacturer to have frequent changeovers and move toward single-piece flow,thus achieving high flexibility and product variety.
Question
In the context of the Toyota Motor Company's seven categories of waste,the result of not performing work correctly the first time is an example of _____.

A) production defects
B) processing
C) inventory
D) overproduction
Question
_____ is one in which employees at a given operation go to the source of required parts,such as machining or subassembly,and withdraw the units as they need them.

A) A classic base-stock system
B) A push system
C) A materials requirement planning system
D) A pull system
Question
In the context of lean tools and approaches,_____ are indicators for operating activities that are placed in plain sight of all employees so that everyone can quickly and easily understand the status and performance of the work system.

A) Kanban cards
B) push systems
C) pull systems
D) visual controls
Question
In the context of lean tools and approaches,_____,one of the components of the 5S principles,refers to a clean work area.

A) shine
B) standardize
C) sort
D) sustain
Question
In the context of the 5S principles,_____ means to arrange materials and equipment so that they are easy to find and use.

A) shine
B) standardize
C) sustain to produce
D) set in order
Question
Which of the following is true of a push manufacturing system?

A) It leads to high work-in-process inventories and high levels of indirect labor and overhead.
B) In this system,just enough new parts are procured to replace those withdrawn.
C) In this system,finished goods are made to coincide with the actual rate of demand.
D) It leads to minimal inventories and maximum responsiveness.
Question
Which of the following is not true about lean principles?

A) Lean manufacturing plants look significantly different from traditional plants.
B) They are always transferable to front-office services that involve high customer contact.
C) Lean manufacturing plants use multi-skilled workers who perform both direct and indirect work.
D) In the airline industry,idle time is the largest form of waste.
Question
A _____ is a flag or a piece of paper that contains all relevant information for an order,such as part number,description,process area used,time of delivery,quantity available,quantity delivered,production quantity,and so on.

A) Kaikaku
B) Jidoka
C) Kaizen
D) Kanban
Question
In the context of Kanban systems,a withdrawal Kanban authorizes the gateway workstation to produce parts.
Question
Total productive maintenance (TPM)seeks to reduce worker ownership of production equipment by excluding employees from maintenance activities.
Question
In the context of the 5S principles,_____ refers to ensuring that each item in a workplace is in its proper place or identified as unnecessary and removed.

A) sort
B) sustain
C) standardize
D) set in order
Question
Which of the following is an example of waste in organizations?

A) Short order-cycle time
B) Routing a job
C) Planned product obsolescence
D) High product variety
Question
Lean operating systems value idle stock and extra storage because it eliminates wait times to replenish stock.
Question
Kanban is a Japanese word that means elimination of waste.
Question
The equation used to calculate the number of Kanban cards required in a system is ,where ? denotes _____. d(p+w)(1+α)C\frac{d(p+w)(1+\alpha)}{C}

A) the demand during lead time
B) a form of safety stock
C) capacity utilization
D) the reorder point
Question
In the context of the major categories of waste classified by the Toyota Motor Company,which of the following is true of overproduction?

A) It ties up production facilities,and the resulting excess inventory simply sits idle.
B) It is waste associated with the expense of idle stock and extra storage.
C) It allows queues to build up between operations,resulting in longer lead times.
D) It is a result of inefficient workplace design and location of tools and materials.
Question
_____ is focused on ensuring that operating systems will perform their intended function reliably.

A) Total productive maintenance
B) A just-in-time system
C) An intermittent production system
D) Total quality management
Question
Quickly changing tooling and fixtures to reduce setup time and achieve higher flexibility and productivity is the principle of _____.

A) Kanban
B) andon
C) the 5Ss
D) SMED
Question
Which of the following is a difference between lean production and Six Sigma?

A) The lean production technique can be used in nonmanufacturing environments,whereas Six Sigma cannot be used in nonmanufacturing environments.
B) Lean production addresses less visible problems in processes,whereas Six Sigma is more concerned with visible problems.
C) Lean production is focused on effectiveness by reducing errors and defects,whereas Six Sigma is focused on efficiency by reducing waste and improving process flow.
D) Lean production tools are more intuitive and easier to apply by anybody in the workplace,whereas many Six Sigma tools require advanced training and expertise of specialists.
Question
In the airline industry,short setup and turnaround time translates into _____.

A) idle time
B) fewer service encounters
C) overproduction
D) higher asset utilization
Question
Drive-in-Style Motors follows a traditional manufacturing system.It produces a fixed number of cars every month.It is now planning to switch to a system of manufacturing where workers go to the source of required parts and withdraw them based on requirements.In this scenario,which of the following is most likely to occur if Drive-in-Style Motors implements this plan?

A) Its inventory levels will increase significantly when the demand is low.
B) Its component parts and subassemblies will be replenished only when needed.
C) Its finished goods inventory will decrease,but raw materials and work-in-process inventories will increase.
D) Its workers,at any given process,will produce units before they are needed.
Question
A _____ system produces finished-goods inventory in advance of customer demand using a forecast of sales.

A) just-in-time
B) push
C) Kanban
D) pull
Question
Which of the following is a similarity between lean production and Six Sigma?

A) Both solely address visible problems in processes.
B) Both focus on efficiency by reducing waste and improving process flow.
C) Both are driven by customer requirements.
D) Both focus on problems related to variation in performance.
Question
A hinge manufacturing company employs a Kanban system for a component part.The daily demand is 900 hinges.Each container has a waiting time of 0.05 days and a processing time of 0.37 days.The container size is 60 hinges,and the safety factor (α)is 10 percent.Given this data,the number of Kanbans necessary for the system is:

A) less than 4 Kanbans.
B) more than 4 but less than or equal to 8 Kanbans.
C) more than 8 but less than or equal to 12 Kanbans.
D) more than 12 but less than or equal to 16 Kanbans.
Question
A manufacturer of automobile engines is designing a new Kanban system for engine #321.The demand for #321 is 75 parts per day,and the container can hold 8 parts at a time.The total processing and waiting time is 3 days.The manager wants a safety factor (α)of 2 or 200 percent.How many Kanbans are required in this system?

A) 85
B) 90
C) 100
D) 115
Question
In the context of the 5S principles,_____ means to keep a process going through training,communication,and organizational structures.

A) shine
B) sort
C) sustain
D) standardize
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/32
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 18: Lean Operating Systems
1
Create & Sell Manufacturing Inc.uses a Kanban system for a component.The daily demand is 175 units.Each container has a combined waiting and processing time of 0.20 days.If the container size is 10 brackets and the safety factor is 11 percent,how many Kanban card sets should be authorized?

A) 2
B) 4
C) 6
D) 7
4
2
A company is using a Kanban system with 2 containers,each holding 50 parts,between a downstream (using)and an upstream (producing)work center.The using work center can handle 250 jobs per day.The average elapsed time for the entire cycle is currently 0.25 days.The company is concerned about the safety factor for the operation.Which of the following is the safety factor (α)of the current operation?

A) 20 percent
B) 60 percent
C) 80 percent
D) 40 percent
60 percent
3
Lean Six Sigma focuses on real dollar savings and has the ability to make significant financial impacts on an organization.
True
4
Any activity,material,or operation that does not add value in an organization is considered waste.
Unlock Deck
Unlock for access to all 32 flashcards in this deck.
Unlock Deck
k this deck
5
In the Timken company's bootcamp,employees and managers try to solve problems,such as removing non-value-added steps from processes to try to eliminate waste.
Unlock Deck
Unlock for access to all 32 flashcards in this deck.
Unlock Deck
k this deck
6
Long setup times enable a manufacturer to have frequent changeovers and move toward single-piece flow,thus achieving high flexibility and product variety.
Unlock Deck
Unlock for access to all 32 flashcards in this deck.
Unlock Deck
k this deck
7
In the context of the Toyota Motor Company's seven categories of waste,the result of not performing work correctly the first time is an example of _____.

A) production defects
B) processing
C) inventory
D) overproduction
Unlock Deck
Unlock for access to all 32 flashcards in this deck.
Unlock Deck
k this deck
8
_____ is one in which employees at a given operation go to the source of required parts,such as machining or subassembly,and withdraw the units as they need them.

A) A classic base-stock system
B) A push system
C) A materials requirement planning system
D) A pull system
Unlock Deck
Unlock for access to all 32 flashcards in this deck.
Unlock Deck
k this deck
9
In the context of lean tools and approaches,_____ are indicators for operating activities that are placed in plain sight of all employees so that everyone can quickly and easily understand the status and performance of the work system.

A) Kanban cards
B) push systems
C) pull systems
D) visual controls
Unlock Deck
Unlock for access to all 32 flashcards in this deck.
Unlock Deck
k this deck
10
In the context of lean tools and approaches,_____,one of the components of the 5S principles,refers to a clean work area.

A) shine
B) standardize
C) sort
D) sustain
Unlock Deck
Unlock for access to all 32 flashcards in this deck.
Unlock Deck
k this deck
11
In the context of the 5S principles,_____ means to arrange materials and equipment so that they are easy to find and use.

A) shine
B) standardize
C) sustain to produce
D) set in order
Unlock Deck
Unlock for access to all 32 flashcards in this deck.
Unlock Deck
k this deck
12
Which of the following is true of a push manufacturing system?

A) It leads to high work-in-process inventories and high levels of indirect labor and overhead.
B) In this system,just enough new parts are procured to replace those withdrawn.
C) In this system,finished goods are made to coincide with the actual rate of demand.
D) It leads to minimal inventories and maximum responsiveness.
Unlock Deck
Unlock for access to all 32 flashcards in this deck.
Unlock Deck
k this deck
13
Which of the following is not true about lean principles?

A) Lean manufacturing plants look significantly different from traditional plants.
B) They are always transferable to front-office services that involve high customer contact.
C) Lean manufacturing plants use multi-skilled workers who perform both direct and indirect work.
D) In the airline industry,idle time is the largest form of waste.
Unlock Deck
Unlock for access to all 32 flashcards in this deck.
Unlock Deck
k this deck
14
A _____ is a flag or a piece of paper that contains all relevant information for an order,such as part number,description,process area used,time of delivery,quantity available,quantity delivered,production quantity,and so on.

A) Kaikaku
B) Jidoka
C) Kaizen
D) Kanban
Unlock Deck
Unlock for access to all 32 flashcards in this deck.
Unlock Deck
k this deck
15
In the context of Kanban systems,a withdrawal Kanban authorizes the gateway workstation to produce parts.
Unlock Deck
Unlock for access to all 32 flashcards in this deck.
Unlock Deck
k this deck
16
Total productive maintenance (TPM)seeks to reduce worker ownership of production equipment by excluding employees from maintenance activities.
Unlock Deck
Unlock for access to all 32 flashcards in this deck.
Unlock Deck
k this deck
17
In the context of the 5S principles,_____ refers to ensuring that each item in a workplace is in its proper place or identified as unnecessary and removed.

A) sort
B) sustain
C) standardize
D) set in order
Unlock Deck
Unlock for access to all 32 flashcards in this deck.
Unlock Deck
k this deck
18
Which of the following is an example of waste in organizations?

A) Short order-cycle time
B) Routing a job
C) Planned product obsolescence
D) High product variety
Unlock Deck
Unlock for access to all 32 flashcards in this deck.
Unlock Deck
k this deck
19
Lean operating systems value idle stock and extra storage because it eliminates wait times to replenish stock.
Unlock Deck
Unlock for access to all 32 flashcards in this deck.
Unlock Deck
k this deck
20
Kanban is a Japanese word that means elimination of waste.
Unlock Deck
Unlock for access to all 32 flashcards in this deck.
Unlock Deck
k this deck
21
The equation used to calculate the number of Kanban cards required in a system is ,where ? denotes _____. d(p+w)(1+α)C\frac{d(p+w)(1+\alpha)}{C}

A) the demand during lead time
B) a form of safety stock
C) capacity utilization
D) the reorder point
Unlock Deck
Unlock for access to all 32 flashcards in this deck.
Unlock Deck
k this deck
22
In the context of the major categories of waste classified by the Toyota Motor Company,which of the following is true of overproduction?

A) It ties up production facilities,and the resulting excess inventory simply sits idle.
B) It is waste associated with the expense of idle stock and extra storage.
C) It allows queues to build up between operations,resulting in longer lead times.
D) It is a result of inefficient workplace design and location of tools and materials.
Unlock Deck
Unlock for access to all 32 flashcards in this deck.
Unlock Deck
k this deck
23
_____ is focused on ensuring that operating systems will perform their intended function reliably.

A) Total productive maintenance
B) A just-in-time system
C) An intermittent production system
D) Total quality management
Unlock Deck
Unlock for access to all 32 flashcards in this deck.
Unlock Deck
k this deck
24
Quickly changing tooling and fixtures to reduce setup time and achieve higher flexibility and productivity is the principle of _____.

A) Kanban
B) andon
C) the 5Ss
D) SMED
Unlock Deck
Unlock for access to all 32 flashcards in this deck.
Unlock Deck
k this deck
25
Which of the following is a difference between lean production and Six Sigma?

A) The lean production technique can be used in nonmanufacturing environments,whereas Six Sigma cannot be used in nonmanufacturing environments.
B) Lean production addresses less visible problems in processes,whereas Six Sigma is more concerned with visible problems.
C) Lean production is focused on effectiveness by reducing errors and defects,whereas Six Sigma is focused on efficiency by reducing waste and improving process flow.
D) Lean production tools are more intuitive and easier to apply by anybody in the workplace,whereas many Six Sigma tools require advanced training and expertise of specialists.
Unlock Deck
Unlock for access to all 32 flashcards in this deck.
Unlock Deck
k this deck
26
In the airline industry,short setup and turnaround time translates into _____.

A) idle time
B) fewer service encounters
C) overproduction
D) higher asset utilization
Unlock Deck
Unlock for access to all 32 flashcards in this deck.
Unlock Deck
k this deck
27
Drive-in-Style Motors follows a traditional manufacturing system.It produces a fixed number of cars every month.It is now planning to switch to a system of manufacturing where workers go to the source of required parts and withdraw them based on requirements.In this scenario,which of the following is most likely to occur if Drive-in-Style Motors implements this plan?

A) Its inventory levels will increase significantly when the demand is low.
B) Its component parts and subassemblies will be replenished only when needed.
C) Its finished goods inventory will decrease,but raw materials and work-in-process inventories will increase.
D) Its workers,at any given process,will produce units before they are needed.
Unlock Deck
Unlock for access to all 32 flashcards in this deck.
Unlock Deck
k this deck
28
A _____ system produces finished-goods inventory in advance of customer demand using a forecast of sales.

A) just-in-time
B) push
C) Kanban
D) pull
Unlock Deck
Unlock for access to all 32 flashcards in this deck.
Unlock Deck
k this deck
29
Which of the following is a similarity between lean production and Six Sigma?

A) Both solely address visible problems in processes.
B) Both focus on efficiency by reducing waste and improving process flow.
C) Both are driven by customer requirements.
D) Both focus on problems related to variation in performance.
Unlock Deck
Unlock for access to all 32 flashcards in this deck.
Unlock Deck
k this deck
30
A hinge manufacturing company employs a Kanban system for a component part.The daily demand is 900 hinges.Each container has a waiting time of 0.05 days and a processing time of 0.37 days.The container size is 60 hinges,and the safety factor (α)is 10 percent.Given this data,the number of Kanbans necessary for the system is:

A) less than 4 Kanbans.
B) more than 4 but less than or equal to 8 Kanbans.
C) more than 8 but less than or equal to 12 Kanbans.
D) more than 12 but less than or equal to 16 Kanbans.
Unlock Deck
Unlock for access to all 32 flashcards in this deck.
Unlock Deck
k this deck
31
A manufacturer of automobile engines is designing a new Kanban system for engine #321.The demand for #321 is 75 parts per day,and the container can hold 8 parts at a time.The total processing and waiting time is 3 days.The manager wants a safety factor (α)of 2 or 200 percent.How many Kanbans are required in this system?

A) 85
B) 90
C) 100
D) 115
Unlock Deck
Unlock for access to all 32 flashcards in this deck.
Unlock Deck
k this deck
32
In the context of the 5S principles,_____ means to keep a process going through training,communication,and organizational structures.

A) shine
B) sort
C) sustain
D) standardize