Deck 6: Allocating Resources to the Project
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/89
Play
Full screen (f)
Deck 6: Allocating Resources to the Project
1
Often it is beneficial to crash activities not on the critical path.
False
2
The variance of the normal time can be quite different from the variance of the crash time.
True
3
Trade-offs must be made in order to optimize the use of limited resources.
True
4
The time to complete a task with normal or standard-practice resource usage is referred to as the crash duration.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
5
When the work is routine, fast-tracking rarely causes serious problems.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
6
Crashing non-critical activities will influence project duration.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
7
The CPM method cannot be used when task durations are probabilistic.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
8
A project that must be completed by a fixed time is referred to as resource constrained.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
9
Fast-tracking a project is used primarily in the pharmaceutical industry.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
10
Projects often compete with each other for the same resources.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
11
Resource loading refers to the amounts of specific resources that are scheduled for use on specific activities or projects at specific times.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
12
The amount of resources a project can use depends in part on the timing of the allocation.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
13
All projects are carried out under conditions of uncertainty.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
14
If resources were not scarce, the resource allocation problem would be concerned solely with profit maximization.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
15
It is considered good management to crash the least costly activities before the more costly ones.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
16
All tasks can be crashed to some extent.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
17
When crashing a task, the usual assumption is that a task is crashed the full amount or none at all.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
18
Good project managers are able to estimate project task times with absolute certainty.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
19
If resources were not scarce, the resource allocation problem would be concerned solely with cost minimization.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
20
For resources that are consumed when used, the problem is which project gets to use the resource first and which must wait.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
21
The as late as possible priority rule is considered the standard scheduling rule.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
22
Resource loading refers to the amounts of specific resources that are scheduled for use on specific activities or projects at specific times.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
23
Pseudoactivities have duration but do not require any resources.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
24
Pools of like resources from which labor can be added temporarily to projects tend to increase costs for the firm as a whole.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
25
Task duration is not necessarily dictated by the amount of labor required to complete the task.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
26
According to research minimum slack rule is the overall best priority rule.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
27
The process of line balancing is when individual production lines are made to generate the required amount of product with a little excess capacity as possible.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
28
A task's duration is a function of both the amount of labor required to complete the task as well as the calendar time required to complete it.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
29
Microsoft Project allows the project manager to create an individual availability calendar for each resource on the project
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
30
One limitation of Microsoft Project is that all resources must share the same availability calendar.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
31
The shortest duration task first rule minimizes the number of tasks that can be completed by a system in a given time period.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
32
The shortest-task-first priority rule for assigning resources minimizes completion time but maximizes the level of in-process inventory.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
33
Pools of like workers are most useful when labor is subdivided into highly specialized subtasks.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
34
Applying "line balancing" techniques to balance the capacity of a project typically yields significant benefits.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
35
A task's duration is a function of both the amount of labor required to complete the task as well as the cost required to complete it.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
36
Schedule slippage simply measures the amount by which a project, or a set of projects, is delayed by application of a leveling rule.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
37
A resource allocation decision may be intended to avoid a future problem rather than correct a current problem.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
38
Pools of like resources from which labor can be added temporarily to projects raise the cost of managing the project.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
39
Activities that have duration but do not require resources are referred to as pseudoactivities.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
40
In general, steady state demand for human resources is highly desirable.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
41
Alice, a project manager, has undertaken a project to build an irrigation canal. Based on the resources allocated to her, she makes an initial estimate that the time required to dig the canal would be 20 days. She also prepares an alternative estimate by adding an additional resource that will allow the project to be completed in 10 days. This alternative estimate that Alice prepares is referred to as the _____.
A) crash duration
B) standard duration
C) slope duration
D) buffer duration
E) critical duration
A) crash duration
B) standard duration
C) slope duration
D) buffer duration
E) critical duration
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
42
According to research, the best overall priority rule is…
A) as soon as possible
B) as late as possible
C) shortest task duration first
D) minimum slack first
E) most critical successor
A) as soon as possible
B) as late as possible
C) shortest task duration first
D) minimum slack first
E) most critical successor
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
43
Victoria, a project manager, has undertaken a project similar to one she did earlier. Owing to her team's familiarity with the processes that are required to complete the project, Victoria is able to produce the required deliverable ahead of schedule. She achieves this by simultaneously completing two phases of work. In this scenario, which of the following does Victoria use to complete the project?
A) A standard operating procedure
B) Fast-tracking
C) Micromanagement
D) Crashing
E) Resource leveling
A) A standard operating procedure
B) Fast-tracking
C) Micromanagement
D) Crashing
E) Resource leveling
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
44
A project that must be completed within the specified performance requirements is considered…
A) time constrained
B) schedule constrained
C) resource constrained
D) performance constrained
E) critically constrained
A) time constrained
B) schedule constrained
C) resource constrained
D) performance constrained
E) critically constrained
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
45
Hamid, a project manager, has a workload of 24,000 hours that needs to be completed in 75 workdays. He has a team of 40 people who work for five 8-hour days per week. In those 75 days, 20 people have each requested three days off at different times. In this scenario, the workload is _____ of capacity
A) 80 percent
B) 102 percent
C) 95 percent
D) 75 percent
E) 150 percent
A) 80 percent
B) 102 percent
C) 95 percent
D) 75 percent
E) 150 percent
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
46
The primary cause of concern in resource allocation is…
A) labor cost
B) resource scarcity
C) lack of solution methodologies
D) parallel activities
E) equipment downtime
A) labor cost
B) resource scarcity
C) lack of solution methodologies
D) parallel activities
E) equipment downtime
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
47
Renly, a project manager in a construction company, has undertaken a project to construct a house. He estimates that the house will take 5 months to complete with his team of 10 workers. He also prepares a second estimate that allows the house to be completed in 2 months if 10 more workers are added to the team. Renly's second estimate is referred to as the _____.
A) crash duration
B) standard duration
C) slope duration
D) buffer duration
E) critical duration
A) crash duration
B) standard duration
C) slope duration
D) buffer duration
E) critical duration
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
48
A project that must be completed by a specific time is considered…
A) time constrained
B) schedule constrained
C) resource constrained
D) performance constrained
E) critically constrained
A) time constrained
B) schedule constrained
C) resource constrained
D) performance constrained
E) critically constrained
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
49
Which of the following priority rules makes resources available so that activities start on their LSTs whenever possible without increasing the project's duration?
A) as soon as possible
B) as late as possible
C) shortest task duration first
D) minimum slack first
E) most critical successor
A) as soon as possible
B) as late as possible
C) shortest task duration first
D) minimum slack first
E) most critical successor
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
50
The task duration with standard-practice resource usage is referred to as the…
A) expected task duration
B) nominal task duration
C) crash duration
D) normal task duration
E) planned task duration
A) expected task duration
B) nominal task duration
C) crash duration
D) normal task duration
E) planned task duration
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
51
Multitasking speeds up project completion.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
52
The shortest-task-first priority rule for assigning resources gives the best combination of minimum project slippage, minimum resource idle-time, and minimum in-process inventory
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
53
Starting the building phase before the design and planning phases is called…
A) operations overlapping
B) concurrent engineering
C) fast-tracking
D) concurrent construction
E) construction overlapping
A) operations overlapping
B) concurrent engineering
C) fast-tracking
D) concurrent construction
E) construction overlapping
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
54
Which of the following rules maximizes the number of tasks that can be completed by a system in a given period of time?
A) as soon as possible
B) as late as possible
C) shortest task duration first
D) minimum slack first
E) most critical successor
A) as soon as possible
B) as late as possible
C) shortest task duration first
D) minimum slack first
E) most critical successor
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
55
William, a project manager, is trying to figure out how many hours his team can work in a period of three months. After accounting for weekends, he notes that each member of the team can work for five 8-hour days per week. After consulting his calendar, he realizes that there are three public holidays in the next three months and two employees have each requested two separate weeks off. His team consists of 15 people. Given this information, William can allocate approximately _____ of work to his team.
A) 7,200 hours
B) 6,120 hours
C) 7,600 hours
D) 6,680 hours
E) 5,500 hours
A) 7,200 hours
B) 6,120 hours
C) 7,600 hours
D) 6,680 hours
E) 5,500 hours
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
56
Allocating specific, limited resources to specific activities is called…
A) resource allocation
B) resource leveling
C) resource tracking
D) expediting a project
E) crashing a project
A) resource allocation
B) resource leveling
C) resource tracking
D) expediting a project
E) crashing a project
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
57
A task has a normal duration of 9 days and a crash duration of 7 days. Its normal cost is $40 and its crash cost is $1What is the crash cost per day?
A) $140
B) $70
C) $50
D) $40
E) $30
A) $140
B) $70
C) $50
D) $40
E) $30
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
58
Lauren, a project manager, has a workload of 24,000 hours that needs to be completed in 30 weeks. She has a team of 20 people who work five 8-hour days per week. She notices that in the 30-week period, there are five holidays and 5 members have each requested 10 days off. Given this information, Lauren is _____ short of completing her workload.
A) 1,200 hours
B) 2,500 hours
C) 2,000 hours
D) 1,500 hours
E) 3,800 hours
A) 1,200 hours
B) 2,500 hours
C) 2,000 hours
D) 1,500 hours
E) 3,800 hours
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
59
A limitation associated with traditional approaches to project management is that the dependency between resources and tasks is often ignored.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
60
Mark, the chief editor of a magazine, needs to create a list of all the in-house writers, designers, and freelancers who will be working on the next issue of the magazine. He also needs to list their activities, their schedules, and their cost per hour. In the context of project management, which of the following should Mark use to create this list?
A) Project crashing
B) Project chartering
C) Standard buffering
D) Fast-tracking
E) Resource loading
A) Project crashing
B) Project chartering
C) Standard buffering
D) Fast-tracking
E) Resource loading
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
61
The following describes which priority rule: This rule usually minimizes the number of late activities.
A) As soon as possible
B) As late as possible
C) Shortest task duration first
D) Minimum slack first
E) Most critical followers
A) As soon as possible
B) As late as possible
C) Shortest task duration first
D) Minimum slack first
E) Most critical followers
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
62
What is resource loading?
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
63
The following describes which priority rule: With this rule, resources are made available so that activities start on their latest start times (LS) whenever possible without increasing the project's duration.
A) As soon as possible
B) As late as possible
C) Shortest task duration first
D) Minimum slack first
E) Most critical followers
A) As soon as possible
B) As late as possible
C) Shortest task duration first
D) Minimum slack first
E) Most critical followers
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
64
The following describes which priority rule: Activities are scheduled to start on their earliest start times (ES), and resources are made available with that in mind.
A) As soon as possible
B) As late as possible
C) Shortest task duration first
D) Minimum slack first
E) Most critical followers
A) As soon as possible
B) As late as possible
C) Shortest task duration first
D) Minimum slack first
E) Most critical followers
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
65
Which of the following is a measure of the amount by which a project is delayed by application of a leveling rule?
A) schedule inflation
B) schedule progression
C) schedule efficacy
D) schedule efficiency
E) schedule slippage
A) schedule inflation
B) schedule progression
C) schedule efficacy
D) schedule efficiency
E) schedule slippage
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
66
The safety time added to chains other than the critical chain is called…
A) feeding buffer
B) project buffer
C) path buffer
D) critical buffer
E) team buffer
A) feeding buffer
B) project buffer
C) path buffer
D) critical buffer
E) team buffer
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
67
All of the following are criteria available to help choose the priority rule mentioned in the textbook except;
A) Schedule slippage
B) Project cost
C) resource utilization
D) in-process inventory
A) Schedule slippage
B) Project cost
C) resource utilization
D) in-process inventory
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
68
The following describes which priority rule: Always consistent with technological precedences, shorter tasks are given priority over longer tasks.
A) As soon as possible
B) As late as possible
C) Shortest task duration first
D) Minimum slack first
E) Most critical followers
A) As soon as possible
B) As late as possible
C) Shortest task duration first
D) Minimum slack first
E) Most critical followers
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
69
The following describes which priority rule: This is the standard rule in scheduling.
A) As soon as possible
B) As late as possible
C) Shortest task duration first
D) Minimum slack first
E) Most critical followers
A) As soon as possible
B) As late as possible
C) Shortest task duration first
D) Minimum slack first
E) Most critical followers
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
70
The following describes which priority rule: The number of successors on the critical path(s) for each activity is counted.
A) Most successors
B) Most resources first
C) Shortest task duration first
D) Minimum slack first
E) Most critical followers
A) Most successors
B) Most resources first
C) Shortest task duration first
D) Minimum slack first
E) Most critical followers
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
71
Arthur, a project manager, has multiple projects under him, and his team members are multitasking between these projects. When he planned these projects, Arthur asked his team members the number of hours they will take to complete their respective tasks. However, they are taking longer than discussed, which is preventing Arthur from taking on more projects. According to Goldratt, which of the following should Arthur do to fix this issue?
A) Hire more team members for new projects.
B) Increase the time allotted to projects that are taking longer.
C) Focus on completing the most resource-intensive projects first.
D) Focus on completing the least resource-intensive projects first.
E) Reduce the number of projects each team member is working on simultaneously.
A) Hire more team members for new projects.
B) Increase the time allotted to projects that are taking longer.
C) Focus on completing the most resource-intensive projects first.
D) Focus on completing the least resource-intensive projects first.
E) Reduce the number of projects each team member is working on simultaneously.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
72
The following describes which priority rule: The number of successors for each activity is counted. Activities with a higher number of successors take precedence.
A) Most successors
B) Most resources first
C) Shortest task duration first
D) Minimum slack first
E) Most critical followers
A) Most successors
B) Most resources first
C) Shortest task duration first
D) Minimum slack first
E) Most critical followers
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
73
The following describes which priority rule: This rule maximizes the number of tasks that can be completed by a system in a given time period.
A) As soon as possible
B) As late as possible
C) Shortest task duration first
D) Minimum slack first
E) Most critical followers
A) As soon as possible
B) As late as possible
C) Shortest task duration first
D) Minimum slack first
E) Most critical followers
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
74
What is fast-tracking a project?
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
75
Vanessa, a student, has to submit two assignments, A and B, on the same day. Each assignment is divided into three tasks. She has to write the first draft, check it for accuracy, and let her friend review it before submission. Each of these tasks takes 5 hours. In order to multitask effectively, Vanessa should:
A) complete the first two tasks of assignment A and start on assignment B while her friend reviews assignment A.
B) complete both assignments simultaneously for her friend to review.
C) complete the first task for each assignment before moving on to the second task and so on.
D) complete assignment B after assignment A has been reviewed.
E) complete assignment A after assignment B has been reviewed.
A) complete the first two tasks of assignment A and start on assignment B while her friend reviews assignment A.
B) complete both assignments simultaneously for her friend to review.
C) complete the first task for each assignment before moving on to the second task and so on.
D) complete assignment B after assignment A has been reviewed.
E) complete assignment A after assignment B has been reviewed.
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
76
Walter, a project manager in a design agency, is using a project management software to manage his project. The agency he works for is currently prioritizing other projects and needs to conserve scarce resources. In the context of priority rules for allocating resources, which of the following rules should Walter use?
A) Longest task duration first
B) As soon as possible
C) As late as possible
D) Most critical followers
E) Least successors
A) Longest task duration first
B) As soon as possible
C) As late as possible
D) Most critical followers
E) Least successors
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
77
The practice of assigning project team members to multiple projects is called…
A) concurrent engineering
B) parallel activities
C) fast-tracking
D) project crashing
E) multitasking
A) concurrent engineering
B) parallel activities
C) fast-tracking
D) project crashing
E) multitasking
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
78
The following describes which priority rule: With this rule, the greater the use of a specific resource on a task, the higher the task's priority for the resource.
A) Most successors
B) Most resources first
C) Shortest task duration first
D) Minimum slack first
E) Most critical followers
A) Most successors
B) Most resources first
C) Shortest task duration first
D) Minimum slack first
E) Most critical followers
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
79
The following describes which priority rule: asks are supplied with resources in inverse order of their slacks.
A) As soon as possible
B) As late as possible
C) Shortest task duration first
D) Minimum slack first
E) Most critical followers
A) As soon as possible
B) As late as possible
C) Shortest task duration first
D) Minimum slack first
E) Most critical followers
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck
80
The following describes which priority rule: This rule is based on the assumption that more important activities have a greater demand for scarce resources.
A) Most successors
B) Most resources first
C) Shortest task duration first
D) Minimum slack first
E) Most critical followers
A) Most successors
B) Most resources first
C) Shortest task duration first
D) Minimum slack first
E) Most critical followers
Unlock Deck
Unlock for access to all 89 flashcards in this deck.
Unlock Deck
k this deck