Deck 15: Introduction to Programmable Control

Full screen (f)
exit full mode
Question
The compilation of all available instructions for a given PLC is called the ____.

A) instruction ladder
B) instruction set
C) block diagram
D) configuration
Use Space or
up arrow
down arrow
to flip the card.
Question
Through a sophisticated system of digital signal transmission and reception, binary data can be organized in a structured format called a(n) ____.

A) protocol
B) Ethernet
C) instruction set
D) data highway
Question
In industrial applications where the PLC will replace the relay logic circuit, the operator controls and process switches will generally remain as they are wired.
Question
The time required for the PLC to complete one scan (read inputs, solve logic, and update outputs) is called the scan time. A typical value for scan time is in the order of ____.

A) 20 msec
B) 20 ns
C) 20 μ\mu s
D) 20 seconds
Question
The input signal must be converted to a(n) ____ logic voltage for use in the processor.

A) high voltage DC
B) low-level AC
C) analog
D) low-level DC
Question
The most common PLC programming language used in industry is called ____________________.
Question
The only devices in the decision maker category for the PLC system are the ___________________ that reside in the PLC logic program.
Question
Volatile memory will lose its programmed contents if operating power is removed or lost.
Question
By definition, ____________________ devices are all devices outside the processor, including all hardware.
Question
A PLC system offers many advantages over a relay-based control system except that it can be difficult to implement.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/10
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 15: Introduction to Programmable Control
1
The compilation of all available instructions for a given PLC is called the ____.

A) instruction ladder
B) instruction set
C) block diagram
D) configuration
B
2
Through a sophisticated system of digital signal transmission and reception, binary data can be organized in a structured format called a(n) ____.

A) protocol
B) Ethernet
C) instruction set
D) data highway
A
3
In industrial applications where the PLC will replace the relay logic circuit, the operator controls and process switches will generally remain as they are wired.
True
4
The time required for the PLC to complete one scan (read inputs, solve logic, and update outputs) is called the scan time. A typical value for scan time is in the order of ____.

A) 20 msec
B) 20 ns
C) 20 μ\mu s
D) 20 seconds
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
5
The input signal must be converted to a(n) ____ logic voltage for use in the processor.

A) high voltage DC
B) low-level AC
C) analog
D) low-level DC
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
6
The most common PLC programming language used in industry is called ____________________.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
7
The only devices in the decision maker category for the PLC system are the ___________________ that reside in the PLC logic program.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
8
Volatile memory will lose its programmed contents if operating power is removed or lost.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
9
By definition, ____________________ devices are all devices outside the processor, including all hardware.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
10
A PLC system offers many advantages over a relay-based control system except that it can be difficult to implement.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 10 flashcards in this deck.