Deck 13: Stacks
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/17
Play
Full screen (f)
Deck 13: Stacks
1
Always get instruction and/or permission before drilling into pre-cast concrete walls.
True
2
PVC stacks do not require support at their base.
False
3
In a properly designed venting system, the pressure variation at any trap outlet should be + or - __________ inch water column.
1
one
one
4
_______________ stacks are special stacks that do not receive any liquid or solid wastes; they convey air so that the pressures within the DWV system remain equalized.
Unlock Deck
Unlock for access to all 17 flashcards in this deck.
Unlock Deck
k this deck
5
Terminal velocity is a measure of how fast water will discharge from the fixture.
Unlock Deck
Unlock for access to all 17 flashcards in this deck.
Unlock Deck
k this deck
6
The more branch intervals on a stack, the higher the DFU rating for each size pipe.
Unlock Deck
Unlock for access to all 17 flashcards in this deck.
Unlock Deck
k this deck
7
A stack is a vertical waste, soil, vent, or storm pipe that extends either through the _______________ or for at least _______________ stories.
Unlock Deck
Unlock for access to all 17 flashcards in this deck.
Unlock Deck
k this deck
8
Holes for pipe penetrations in wood floors should be as tight as possible to support the pipe.
Unlock Deck
Unlock for access to all 17 flashcards in this deck.
Unlock Deck
k this deck
9
Stacks made of plastic pipe must be supported every 4 feet.
Unlock Deck
Unlock for access to all 17 flashcards in this deck.
Unlock Deck
k this deck
10
Vent stacks should never be less than one-half the size of the drain they serve.
Unlock Deck
Unlock for access to all 17 flashcards in this deck.
Unlock Deck
k this deck
11
Some codes require at least one stack to extend ____________________ from the base through the roof.
Unlock Deck
Unlock for access to all 17 flashcards in this deck.
Unlock Deck
k this deck
12
A joist may not be notched in the middle _______________ of the span.
Unlock Deck
Unlock for access to all 17 flashcards in this deck.
Unlock Deck
k this deck
13
Cast iron stacks do not require support at their base.
Unlock Deck
Unlock for access to all 17 flashcards in this deck.
Unlock Deck
k this deck
14
Stacks should be supported at every ____________________ except for threaded pipe, which should be supported at ____________________ ____________________ ____________________.
Unlock Deck
Unlock for access to all 17 flashcards in this deck.
Unlock Deck
k this deck
15
A ____________________ ____________________ is the distance along a stack corresponding to one story in height.
Unlock Deck
Unlock for access to all 17 flashcards in this deck.
Unlock Deck
k this deck
16
The space between a pipe sleeve and a pipe should be left open to allow for better ventilation.
Unlock Deck
Unlock for access to all 17 flashcards in this deck.
Unlock Deck
k this deck
17
At rated full load, a stack is about ____________________ full.
Unlock Deck
Unlock for access to all 17 flashcards in this deck.
Unlock Deck
k this deck

