Deck 12: Building Drains
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/25
Play
Full screen (f)
Deck 12: Building Drains
1
Branch openings into a building drain should enter at a __________ degree angle and ____________________ the centerline of the pipe.
45, above
2
Fixtures not subject to backflow should drain by ____________________ to the building drain or building sewer.
gravity
3
Floor drains do not require a trap.
False
4
If installing the building drain involves trenching, all the rules of trenching safety must be observed.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
5
A dead end is an extension of more than 2' of a drain or vent beyond the last active connection.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
6
When installing a buiding drainage system, it is usually necessary to make a drawing.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
7
No connections should be made to a horizontal line within ten pipe diameters downstream from the base of a stack unless special venting is provided.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
8
The minimum satisfactory velocity in a drain line is
A) 1 fps.
B) 2 fps.
C) 2.5 fps.
D) 3 fps.
A) 1 fps.
B) 2 fps.
C) 2.5 fps.
D) 3 fps.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
9
If the building drain is buried in the earth, care is necessary to be sure that the piping has ____________________ ____________________.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
10
The building drain
A) receives the discharge from soil, waste, and other drainage piping inside the walls of a building.
B) is the lowest part of the drainage system.
C) conveys all discharge to the building sewer.
D) all of the above.
A) receives the discharge from soil, waste, and other drainage piping inside the walls of a building.
B) is the lowest part of the drainage system.
C) conveys all discharge to the building sewer.
D) all of the above.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
11
____ intercept and retain greasy and oily substances.
A) Oil traps
B) Grease traps
C) Culinary waste traps
D) Food waste grinders
A) Oil traps
B) Grease traps
C) Culinary waste traps
D) Food waste grinders
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
12
Cleanouts or cleanout equivalents must be located for access to all of the drainage pipe.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
13
Building ____________________ may be permitted to use a wider range of materials than building ____________________.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
14
If fixtures are subject to backflow, they should be protected with a backwater valve or sewage pump.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
15
____ is caused when fast-moving waste from a stack meets with slower-moving waste in horizontal piping.
A) Stoppage
B) Hydraulic jump
C) Blockage
D) Water hammer
A) Stoppage
B) Hydraulic jump
C) Blockage
D) Water hammer
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
16
The building drain is sized based on
A) the length of all the piping in the building.
B) the diameter of all the piping in the building.
C) the drainage fixture unit load connected to the drain.
D) the number of bedrooms in the building.
A) the length of all the piping in the building.
B) the diameter of all the piping in the building.
C) the drainage fixture unit load connected to the drain.
D) the number of bedrooms in the building.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
17
Connections from stacks to building drains may be made with straight tees.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
18
The minimum size trap for a floor drain is 1- inches.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
19
Hydraulic jump is a term used to describe the flow pattern at the base of a stack.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
20
It is usually considered that building drains receive the discharge from ____________________ and not from individual ____________________.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
21
A flow rate of ____________________ is necessary to move solids in a drain line.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
22
It is good practice to wash drains that carry ____________________ ____________________ with another fixture or fixture group upstream.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
23
The building drain is sized from the same table as for building ____________________.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
24
Fixtures that could be flooded when the sewer is overloaded should be protected by a ____________________ ____________________ or ____________________ ____________________.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
25
____________________ ____________________ and ____________________ ____________________ are kept separate until these lines are outside the building, and depending on local code, they may never connect to each other.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck

