Deck 13: Culvert Design

Full screen (f)
exit full mode
Question
The principal goal of outcome design for a culvert is determination of the size and alignment of the culvert and provisions for erosion control.
Use Space or
up arrow
down arrow
to flip the card.
Question
The number of barrels used in a culvert should be ___.

A)exactly 1
C)kept to a minimum
B)exactly 5
D)kept at maximum
Question
To design an inlet apron lining, compute velocity at the inlet of the culvert by using the ___________________ equation.
Question
Meetings are least important in the culvert design process.
Question
When designing an inlet apron lining, cross-sectional area is computed by using the ____________________ depth together with barrel dimensions.
Question
A site visit must be conducted during culvert design to verify the topography and note any features that are not clearly depicted on the maps.
Question
When computing the cross-sectional area of a culvert and the face of the culvert is skewed, use the dimensions ____ to the long axis of the barrel.

A)parallel
C)not associated with
B)perpendicular
D)skew
Question
An important environmental consideration when designing a culvert is the potential for ___________________ downstream from the culvert.
Question
Generally, the culvert should follow the streambed only in horizontal alignment.
Question
What is an advantage of designing a new culvert over replacing an old culvert?

A)fewer existing streams
C)only outlet control
B)fewer existing constraints
D)previously existing utilities
Question
____ is a key design parameter and constitutes the maximum height of headwater that will be allowed for the design storm.

A)Allowable headwater elevation
C)Design outcome
B)Embankment
D)Backwater
Question
The engineer's job in designing a culvert ____________________ often is made difficult by the physical constraints within which the design must be accomplished.
Question
An important environmental consideration to culvert design is ____.

A)type of soil
C)existing culverts
B)fish habitat
D)apron lining
Question
A typical constraint when replacing a culvert is the presence of established improvements and utilities adjacent to the existing culvert and stream.
Question
In many culvert replacements, the existing culvert is ____________________ inadequate because of various factors.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/15
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 13: Culvert Design
1
The principal goal of outcome design for a culvert is determination of the size and alignment of the culvert and provisions for erosion control.
True
2
The number of barrels used in a culvert should be ___.

A)exactly 1
C)kept to a minimum
B)exactly 5
D)kept at maximum
C
3
To design an inlet apron lining, compute velocity at the inlet of the culvert by using the ___________________ equation.
continuity
4
Meetings are least important in the culvert design process.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
5
When designing an inlet apron lining, cross-sectional area is computed by using the ____________________ depth together with barrel dimensions.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
6
A site visit must be conducted during culvert design to verify the topography and note any features that are not clearly depicted on the maps.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
7
When computing the cross-sectional area of a culvert and the face of the culvert is skewed, use the dimensions ____ to the long axis of the barrel.

A)parallel
C)not associated with
B)perpendicular
D)skew
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
8
An important environmental consideration when designing a culvert is the potential for ___________________ downstream from the culvert.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
9
Generally, the culvert should follow the streambed only in horizontal alignment.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
10
What is an advantage of designing a new culvert over replacing an old culvert?

A)fewer existing streams
C)only outlet control
B)fewer existing constraints
D)previously existing utilities
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
11
____ is a key design parameter and constitutes the maximum height of headwater that will be allowed for the design storm.

A)Allowable headwater elevation
C)Design outcome
B)Embankment
D)Backwater
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
12
The engineer's job in designing a culvert ____________________ often is made difficult by the physical constraints within which the design must be accomplished.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
13
An important environmental consideration to culvert design is ____.

A)type of soil
C)existing culverts
B)fish habitat
D)apron lining
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
14
A typical constraint when replacing a culvert is the presence of established improvements and utilities adjacent to the existing culvert and stream.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
15
In many culvert replacements, the existing culvert is ____________________ inadequate because of various factors.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 15 flashcards in this deck.