____ is a relatively new design approach that attempts to bring together all the diverse participants of a project at the beginning of the design phase.

A) A construction change directive
B) A contractor request for information
C) Building Information Modeling
D) Integrated Design Process
Use Space or
up arrow
down arrow
to flip the card.
Question
Describe how the numbers and titles in MasterFormat are divided.
Question
In addition to the purely technical information, division ____ of the specifications outlines the guidelines for the pre-construction phase of the project.

A) 00
B) 01
C) 02
D) 03
Question
Describe the Design-Build contracting method.
Question
Construction specifications for buildings and other projects are written using the ____.

A) Facilities Services Subgroup
B) MasterFormat system
C) General Conditions clause
D) Design-Bid-Build method
Question
Give a brief description of Building Information Modeling.
Question
Describe the possible duties and roles a construction manager may take on in a project.
Question
Briefly describe the basic process of both competitive bidding and invitational bidding.
Question
Describe the types of projects that would be referred to as heavy construction. Explain what entities are usually responsible for such projects and why.
Question
Describe the purpose and scope of a shop drawing.
Question
____ drawings are substantially different from architectural drawings in style and content, including manufacturing conventions and special fabrication instructions.

A) Data
B) Mock-up
C) Shop
D) Construction
Question
During the ____ phase, the architect, other design consultants, and the owner mutually determine the goals and objectives of the project.

A) pre-design
B) CD
C) project delivery
D) design build
Question
Describe the advantages of a negotiated contract and why an owner may decide to do a negotiated contract instead of seeking bids.
Question
____ initiated the regulation of safety standards for the construction industry.

A) NIBS
B) BIM
C) IDP
D) OSHA
Question
Using the ______  method, the construction manager may act purely as an advisor, providing guidance and expertise throughout the design and construction of a project, and does not guarantee a budget or schedule.

A) Construction Management for Fee
B) Design-Build
C) Construction Management at Risk
D) Integrated Design Process
Question
Both specialty and subcontractors are independent contractors employed by the ____ to perform specific work at a specified cost.

A) general contractor
B) superintendent
C) field supervisor
D) architect
Question
Describe the Design-Bid-Build contracting method.
Question
____ is the traditional method of project delivery that moves sequentially from conception of a project through its construction.

A) Design-Build
B) Design-Bid-Build
C) Bid-Build
D) Design-Bid
Question
Describe what a field office is and explain the purpose of establishing a field office on a construction site.
Question
The construction documents include a written manual called the ____.

A) clarifications
B) specifications
C) CDs
D) MasterFormat
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/20
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 1: The Construction Industry: an Overview
1
____ is a relatively new design approach that attempts to bring together all the diverse participants of a project at the beginning of the design phase.

A) A construction change directive
B) A contractor request for information
C) Building Information Modeling
D) Integrated Design Process
D
2
Describe how the numbers and titles in MasterFormat are divided.
The numbers and titles in MasterFormat are divided into fifty basic groupings called divisions, thirty-four of which are active, with sixteen reserved for future expansion. Each division has a title and identifying number. Division one describes the general requirements of the contract, outlining administrative methods for a construction project, such as project management procedures and construction facilities and controls.
3
In addition to the purely technical information, division ____ of the specifications outlines the guidelines for the pre-construction phase of the project.

A) 00
B) 01
C) 02
D) 03
A
4
Describe the Design-Build contracting method.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
5
Construction specifications for buildings and other projects are written using the ____.

A) Facilities Services Subgroup
B) MasterFormat system
C) General Conditions clause
D) Design-Bid-Build method
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
6
Give a brief description of Building Information Modeling.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
7
Describe the possible duties and roles a construction manager may take on in a project.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
8
Briefly describe the basic process of both competitive bidding and invitational bidding.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
9
Describe the types of projects that would be referred to as heavy construction. Explain what entities are usually responsible for such projects and why.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
10
Describe the purpose and scope of a shop drawing.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
11
____ drawings are substantially different from architectural drawings in style and content, including manufacturing conventions and special fabrication instructions.

A) Data
B) Mock-up
C) Shop
D) Construction
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
12
During the ____ phase, the architect, other design consultants, and the owner mutually determine the goals and objectives of the project.

A) pre-design
B) CD
C) project delivery
D) design build
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
13
Describe the advantages of a negotiated contract and why an owner may decide to do a negotiated contract instead of seeking bids.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
14
____ initiated the regulation of safety standards for the construction industry.

A) NIBS
B) BIM
C) IDP
D) OSHA
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
15
Using the ______  method, the construction manager may act purely as an advisor, providing guidance and expertise throughout the design and construction of a project, and does not guarantee a budget or schedule.

A) Construction Management for Fee
B) Design-Build
C) Construction Management at Risk
D) Integrated Design Process
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
16
Both specialty and subcontractors are independent contractors employed by the ____ to perform specific work at a specified cost.

A) general contractor
B) superintendent
C) field supervisor
D) architect
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
17
Describe the Design-Bid-Build contracting method.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
18
____ is the traditional method of project delivery that moves sequentially from conception of a project through its construction.

A) Design-Build
B) Design-Bid-Build
C) Bid-Build
D) Design-Bid
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
19
Describe what a field office is and explain the purpose of establishing a field office on a construction site.
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
20
The construction documents include a written manual called the ____.

A) clarifications
B) specifications
C) CDs
D) MasterFormat
Unlock Deck
Unlock for access to all 20 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 20 flashcards in this deck.