Deck 12: Raceway Installation

Full screen (f)
exit full mode
Question
Rigid Metal Conduit must be supported at least every __________ feet along a conduit run. (General Rule)

A) 3
B) 8
C) 10
D) 12
Use Space or
up arrow
down arrow
to flip the card.
Question
To find the maximum number of conductors of the same size and insulation type permitted in various types and sizes of conduit, you would look in __________ of the National Electrical Code.

A) Chapter 8
B) Informative Annex C
C) Informative Annex D
D) the index
Question
Where only two conductors are installed in a raceway, the conduit cannot be filled to more than __________ of the conduit's cross-sectional area.

A) 25%
B) 31%
C) 40%
D) 55%
Question
Electrical Metallic Tubing (Type EMT) must be secured within 30" of every outlet box, junction box, cabinet, and conduit body.
Question
Section 300.9 states that when installing conduits above grade in a wet location (like outdoors on the side of a house), the interior of the conduit is considered a wet location.
Question
EMT must be supported at least every __________ along the run. (General Rule)

A) 3'
B) 5'
C) 10'
D) 12'
Question
Expansion fittings are generally provided in exposed runs of rigid pvc conduit where __________.

A) the run is long
B) the run is subject to large temperature variations during or after installation
C) expansion and contraction measures are provided for the building or other structures
D) All of the above
Question
The NEC considers horizontal runs of EMT supported by openings through framing members at intervals not greater than 10' and securely fastened within 3' of termination points to be properly supported.
Question
The NEC requires that a(n) __________ be used for the protection of conductors sized 4 AWG and larger installed in conduit.

A) antioxidant
B) coupling
C) locknut
D) insulated bushing
Question
The NEC defines __________ as an unthreaded thinwall raceway of circular cross section designed for the physical protection and routing of conductors and cables.

A) EMT
B) IMC
C) PVC
D) RMC
Question
A(n) __________ bend is a conduit bend that results in a conduit going over an object that is blocking the path of the run.

A) back-to-back
B) field
C) offset
D) saddle
Question
Schedule 80 rigid PVC conduit has a larger inside diameter than Schedule 40 rigid PVC conduit.
Question
Rigid Metal Conduit must be supported within __________ of outlet boxes, junction boxes, cabinets, and conduit bodies. (General Rule)

A) 8"
B) 10"
C) 12"
D) 36"
Question
According to Underwriters Laboratories, lengths of Flexible Metal Conduit longer than __________ have not been judged suitable for grounding purposes.

A) 6'
B) 8'
C) 10'
D) 12'
Question
The securing and supporting requirements for Flexible Metal Conduit are the same as those for Type NM cable.
Question
A(n) __________ bend is a conduit bend formed by two 90-degree bends with a straight length of conduit between the two bends.

A) back-to-back
B) field
C) offset
D) saddle
Question
The securing and supporting requirements for liquidtight flexible metal conduit (Type LFMC) are the same as which of the following?

A) Type NM cable
B) Type AC cable
C) Flexible Metal Conduit
D) All of the above
Question
A separate equipment grounding conductor must always be installed in runs of ENT.
Question
Nonmetallic sheathed cable is permitted to be run in a raceway.
Question
A(n) __________ bend is a conduit bend that is made with two equal-degree bends in such a way so the conduit changes elevation and avoids an obstruction.

A) back-to-back
B) field
C) offset
D) saddle
Question
The conduit bend used on the conduit ends when the conduit enters a box or other electrical enclosure that is surface mounted is called a(n) _________________________ bend.
Question
Three-point and four-point bends are types of __________ bends.

A) back-to-back
B) offset
C) saddle
D) None of the above
Question
RMC, IMC, EMT, and PVC conduits come in standard __________ foot lengths.

A) 5
B) 6
C) 8
D) 10
Question
____________________ is the amount that must be subtracted from a desired stub up height so the bend will come out right. This term relates to the use of EMT benders.
Question
The metric designator for 6" trade size rigid metal conduit is __________.

A) 100
B) 155
C) 175
D) 208
Question
The __________ on a conduit hand bender head is where you will place the middle bending mark when doing a three-point saddle bend.

A) arrow
B) rim notch
C) star point
D) hook
Question
When installing more than two conductors in a conduit or tubing, the maximum percentage of fill allowed by the NEC is __________.

A) 25
B) 31
C) 40
D) 60
Question
The __________ on a conduit hand bender head is where you will place the bending mark when doing a stub-up bend.

A) arrow
B) rim notch
C) star point
D) hook
Question
The number of bends in a conduit run from one box to another box cannot exceed a total of ____________________ degrees.
Question
The __________ on a conduit hand bender head is where you will place the bending mark when doing the second 90 degree bend of a back-to-back bend.

A) arrow
B) rim notch
C) star point
D) hook
Question
The most common conduit bend is a 90-degree bend also known as a(n) ____________________.
Question
ENT must be supported at intervals not exceeding __________ feet.(General Rule)

A) 10
B) 8
C) 5
D) 3
Question
Conduit systems must be completely installed before the electrical conductors are permitted to be pulled in.
Question
The metric designator for 1/2" trade size EMT is __________.

A) 12
B) 13
C) 16
D) 28
Question
The most common types of conduit bodies include which of the following?

A) L-shaped bodies ("Ells")
B) T-shaped bodies ("Tees")
C) C-shaped bodies ("Cees")
D) All of the above
Question
A steel fish tape should be used when pulling conductors through an installed conduit system and into an energized loadcenter.
Question
A(n) __________ plastic cap on the ends of rigid metal conduit designates inch trade sizes.

A) black
B) red
C) blue
D) None of the above
Question
The maximum number of 14 AWG conductors with THHN insulation that you could install in a 3/8" trade size FMC is __________ if the connector fittings are inside or __________ if the connector fittings are outside. (assume the use of a grounding conductor)

A) 1, 2
B) 3, 4
C) 4, 5
D) 5, 6
Question
__________ is the amount that must be subtracted from a desired stub-up height so the bend will come out right.

A) Sweep
B) Stub height
C) Saddle mark
D) Take up
Question
Any installation of Liquidtight Flexible Metal Conduit over ____________________ feet in length requires the installation of a grounding conductor.
Question
Explain the purpose of cutting oil when threading conduit.
Question
Describe the technique that must be used if the length of a conduit run is longer than the length of your longest fish tape.
Question
Describe a conduit body.
Question
List at least 5 raceway types that could be used in residential wiring.
Question
Explain the difference between Flexible Metal Conduit and Type AC or Type MC cable.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/45
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 12: Raceway Installation
1
Rigid Metal Conduit must be supported at least every __________ feet along a conduit run. (General Rule)

A) 3
B) 8
C) 10
D) 12
C
2
To find the maximum number of conductors of the same size and insulation type permitted in various types and sizes of conduit, you would look in __________ of the National Electrical Code.

A) Chapter 8
B) Informative Annex C
C) Informative Annex D
D) the index
B
3
Where only two conductors are installed in a raceway, the conduit cannot be filled to more than __________ of the conduit's cross-sectional area.

A) 25%
B) 31%
C) 40%
D) 55%
B
4
Electrical Metallic Tubing (Type EMT) must be secured within 30" of every outlet box, junction box, cabinet, and conduit body.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
5
Section 300.9 states that when installing conduits above grade in a wet location (like outdoors on the side of a house), the interior of the conduit is considered a wet location.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
6
EMT must be supported at least every __________ along the run. (General Rule)

A) 3'
B) 5'
C) 10'
D) 12'
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
7
Expansion fittings are generally provided in exposed runs of rigid pvc conduit where __________.

A) the run is long
B) the run is subject to large temperature variations during or after installation
C) expansion and contraction measures are provided for the building or other structures
D) All of the above
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
8
The NEC considers horizontal runs of EMT supported by openings through framing members at intervals not greater than 10' and securely fastened within 3' of termination points to be properly supported.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
9
The NEC requires that a(n) __________ be used for the protection of conductors sized 4 AWG and larger installed in conduit.

A) antioxidant
B) coupling
C) locknut
D) insulated bushing
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
10
The NEC defines __________ as an unthreaded thinwall raceway of circular cross section designed for the physical protection and routing of conductors and cables.

A) EMT
B) IMC
C) PVC
D) RMC
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
11
A(n) __________ bend is a conduit bend that results in a conduit going over an object that is blocking the path of the run.

A) back-to-back
B) field
C) offset
D) saddle
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
12
Schedule 80 rigid PVC conduit has a larger inside diameter than Schedule 40 rigid PVC conduit.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
13
Rigid Metal Conduit must be supported within __________ of outlet boxes, junction boxes, cabinets, and conduit bodies. (General Rule)

A) 8"
B) 10"
C) 12"
D) 36"
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
14
According to Underwriters Laboratories, lengths of Flexible Metal Conduit longer than __________ have not been judged suitable for grounding purposes.

A) 6'
B) 8'
C) 10'
D) 12'
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
15
The securing and supporting requirements for Flexible Metal Conduit are the same as those for Type NM cable.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
16
A(n) __________ bend is a conduit bend formed by two 90-degree bends with a straight length of conduit between the two bends.

A) back-to-back
B) field
C) offset
D) saddle
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
17
The securing and supporting requirements for liquidtight flexible metal conduit (Type LFMC) are the same as which of the following?

A) Type NM cable
B) Type AC cable
C) Flexible Metal Conduit
D) All of the above
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
18
A separate equipment grounding conductor must always be installed in runs of ENT.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
19
Nonmetallic sheathed cable is permitted to be run in a raceway.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
20
A(n) __________ bend is a conduit bend that is made with two equal-degree bends in such a way so the conduit changes elevation and avoids an obstruction.

A) back-to-back
B) field
C) offset
D) saddle
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
21
The conduit bend used on the conduit ends when the conduit enters a box or other electrical enclosure that is surface mounted is called a(n) _________________________ bend.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
22
Three-point and four-point bends are types of __________ bends.

A) back-to-back
B) offset
C) saddle
D) None of the above
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
23
RMC, IMC, EMT, and PVC conduits come in standard __________ foot lengths.

A) 5
B) 6
C) 8
D) 10
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
24
____________________ is the amount that must be subtracted from a desired stub up height so the bend will come out right. This term relates to the use of EMT benders.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
25
The metric designator for 6" trade size rigid metal conduit is __________.

A) 100
B) 155
C) 175
D) 208
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
26
The __________ on a conduit hand bender head is where you will place the middle bending mark when doing a three-point saddle bend.

A) arrow
B) rim notch
C) star point
D) hook
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
27
When installing more than two conductors in a conduit or tubing, the maximum percentage of fill allowed by the NEC is __________.

A) 25
B) 31
C) 40
D) 60
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
28
The __________ on a conduit hand bender head is where you will place the bending mark when doing a stub-up bend.

A) arrow
B) rim notch
C) star point
D) hook
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
29
The number of bends in a conduit run from one box to another box cannot exceed a total of ____________________ degrees.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
30
The __________ on a conduit hand bender head is where you will place the bending mark when doing the second 90 degree bend of a back-to-back bend.

A) arrow
B) rim notch
C) star point
D) hook
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
31
The most common conduit bend is a 90-degree bend also known as a(n) ____________________.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
32
ENT must be supported at intervals not exceeding __________ feet.(General Rule)

A) 10
B) 8
C) 5
D) 3
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
33
Conduit systems must be completely installed before the electrical conductors are permitted to be pulled in.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
34
The metric designator for 1/2" trade size EMT is __________.

A) 12
B) 13
C) 16
D) 28
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
35
The most common types of conduit bodies include which of the following?

A) L-shaped bodies ("Ells")
B) T-shaped bodies ("Tees")
C) C-shaped bodies ("Cees")
D) All of the above
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
36
A steel fish tape should be used when pulling conductors through an installed conduit system and into an energized loadcenter.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
37
A(n) __________ plastic cap on the ends of rigid metal conduit designates inch trade sizes.

A) black
B) red
C) blue
D) None of the above
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
38
The maximum number of 14 AWG conductors with THHN insulation that you could install in a 3/8" trade size FMC is __________ if the connector fittings are inside or __________ if the connector fittings are outside. (assume the use of a grounding conductor)

A) 1, 2
B) 3, 4
C) 4, 5
D) 5, 6
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
39
__________ is the amount that must be subtracted from a desired stub-up height so the bend will come out right.

A) Sweep
B) Stub height
C) Saddle mark
D) Take up
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
40
Any installation of Liquidtight Flexible Metal Conduit over ____________________ feet in length requires the installation of a grounding conductor.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
41
Explain the purpose of cutting oil when threading conduit.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
42
Describe the technique that must be used if the length of a conduit run is longer than the length of your longest fish tape.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
43
Describe a conduit body.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
44
List at least 5 raceway types that could be used in residential wiring.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
45
Explain the difference between Flexible Metal Conduit and Type AC or Type MC cable.
Unlock Deck
Unlock for access to all 45 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 45 flashcards in this deck.