Deck 7: Introduction to Residential Service Entrances
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/41
Play
Full screen (f)
Deck 7: Introduction to Residential Service Entrances
1
One set of service entrance conductors is permitted to supply __________ service disconnecting means instead of a single main disconnect.
A) 2 to 4
B) 2 to 6
C) 3 to 6
D) 3 to 5
A) 2 to 4
B) 2 to 6
C) 3 to 6
D) 3 to 5
B
2
A metal underground water pipe in contact with the earth for 20 feet is permitted to be the only grounding electrode needed to meet NEC requirements.
False
3
When a metal underground water pipe is used as a grounding electrode, it must be in contact with the earth for at least __________ feet.
A) 5
B) 8
C) 10
D) 12
A) 5
B) 8
C) 10
D) 12
C
4
When installing service drop conductors above a residential roof, conductors must have a vertical clearance of at least __________. (General Rule)
A) 3 feet
B) 5 feet
C) 8 feet
D) 10 feet
A) 3 feet
B) 5 feet
C) 8 feet
D) 10 feet
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
5
If a single grounding electrode that is a rod, pipe or plate does not have resistance to earth of 25 ohms or less, an additional electrode must be installed.
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
6
What group is the final authority for determining the required vertical clearances for service conductors?
A) Underwriters Laboratories
B) National Electrical Code
C) National Electrical Manufacturers Association
D) Utility Company
A) Underwriters Laboratories
B) National Electrical Code
C) National Electrical Manufacturers Association
D) Utility Company
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
7
The point of connection between the wiring of the electric utility and the house wiring is called the __________.
A) service drop
B) service lateral
C) service point
D) service conductors
A) service drop
B) service lateral
C) service point
D) service conductors
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
8
__________ is a general term used for material, fittings, devices, appliances, lighting fixtures, apparatus, machinery, and other parts used in connection with an electrical installation.
A) Circuit
B) Equipment
C) Enclosure
D) Electrode
A) Circuit
B) Equipment
C) Enclosure
D) Electrode
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
9
Overhead service conductors are permitted to be attached to trees for support.
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
10
When a ground ring is used as a grounding electrode, it must be at least a 2 AWG copper conductor at least __________ feet long.
A) 15
B) 20
C) 30
D) 50
A) 15
B) 20
C) 30
D) 50
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
11
The overhead service conductors from the last pole to the point connecting them to the service entrance conductors at the building are called __________ conductors.
A) service drop
B) riser
C) service lateral
D) None of the above
A) service drop
B) riser
C) service lateral
D) None of the above
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
12
The NEC requires a clearance of at least __________ feet above final grade for service conductors where they are connected to the building, above sidewalks and other areas accessible to pedestrians.
A) 18
B) 12
C) 10
D) 8
A) 18
B) 12
C) 10
D) 8
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
13
Outdoor light fixtures are permitted to be attached to trees.
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
14
Service entrance cables must be supported by straps or staples within __________ inches of any electrical enclosure and at intervals not exceeding __________ inches.
A) 8, 24
B) 12, 24
C) 8, 30
D) 12, 30
A) 8, 24
B) 12, 24
C) 8, 30
D) 12, 30
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
15
The enclosure housing a temporary service entrance disconnecting means must be dust-tight.
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
16
The NEC requires a vertical clearance of at least __________ feet above public streets, alleys, roads, and parking areas subject to truck traffic.
A) 10
B) 12
C) 15
D) 18
A) 10
B) 12
C) 15
D) 18
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
17
Direct buried conductors emerging from the ground must be protected to a point at least __________ feet above finished grade.
A) 1.5
B) 2.5
C) 5
D) 8
A) 1.5
B) 2.5
C) 5
D) 8
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
18
Underground service conductors installed as a cable assembly are required to be buried at least __________ feet by the NEC.
A) 1
B) 2
C) 3
D) 4
A) 1
B) 2
C) 3
D) 4
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
19
When a warning ribbon is required to mark the location of buried underground service conductors, it must be placed at least __________ above the buried conductors.
A) 12"
B) 8"
C) 18"
D) 24"
A) 12"
B) 8"
C) 18"
D) 24"
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
20
The NEC requires a minimum clearance of __________ feet above residential property and driveways where the voltage to ground does not exceed 300 volts.
A) 18
B) 10
C) 15
D) None of the above
A) 18
B) 10
C) 15
D) None of the above
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
21
Explain why a seal is required anytime a raceway containing electrical conductors is installed from a cold area to a warm area.
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
22
Ground rods must be at least ________ feet long.
A) 6
B) 8
C) 10
D) 12
A) 6
B) 8
C) 10
D) 12
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
23
Where more than one ground rod, pipe, or plate is used, the grounding electrodes must be at least __________ feet apart.
A) 4
B) 8
C) 10
D) None of the above
A) 4
B) 8
C) 10
D) None of the above
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
24
A(n) __________ is a conducting object through which a direct connection to the earth is established.
A) bond wire
B) grounding electrode
C) main bonding jumper
D) grounded conductor
A) bond wire
B) grounding electrode
C) main bonding jumper
D) grounded conductor
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
25
A length of raceway that extends up a utility pole and encloses the service entrance conductors in an underground service is called a(n) _______________.
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
26
A(n) __________ is the conductor connected to the neutral point of a system and is intended to carry current under normal conditions.
A) grounding conductor
B) ungrounded conductor
C) service conductor
D) neutral conductor
A) grounding conductor
B) ungrounded conductor
C) service conductor
D) neutral conductor
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
27
Where service entrance conductors extend from the weatherhead, a _______________ is required to keep water from entering the weatherhead and getting into the meter enclosure.
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
28
A piece of electrical equipment used by the utility company to step down the high voltage of the utility system to the 120/240 volts required for a residential electrical system is called a(n) _______________.
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
29
_______________ is the term for being connected together to establish electrical continuity and conductivity.
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
30
A system or circuit conductor that is intentionally grounded is called a(n) _______________ conductor.
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
31
Copper coated steel ground rods must be listed and be at least __________ in diameter.
A) 1/2"
B) 5/8"
C) 3/4"
D) 1"
A) 1/2"
B) 5/8"
C) 3/4"
D) 1"
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
32
120/240-volt overhead service conductors must maintain a vertical clearance of at least __________ feet above the back yard of a house.
A) 10
B) 12
C) 15
D) 18
A) 10
B) 12
C) 15
D) 18
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
33
When bonding together the noncurrent carrying metal parts of a service entrance, which of the following methods may be used?
A) exothermic welding
B) listed pressure connectors
C) listed clamps
D) all of the above
A) exothermic welding
B) listed pressure connectors
C) listed clamps
D) all of the above
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
34
A transformer designed to be mounted directly on a foundation at ground level is called a(n) ____________________________.
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
35
A ground rod cannot be driven completely into the ground because of large rocks in the soil. Explain what options you have to meet NEC requirements.
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
36
The _______________ conductor of an AC service is connected to a grounding electrode system to limit the voltage to ground from lightning, line surges, and unintentional high voltage crossovers, and to stabilize the voltage to ground during normal operation.
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
37
According to NEC Table 250.66, the minimum size copper grounding electrode conductor for a service entrance installed with 4/0 copper conductors is__________.
A) 8 AWG
B) 6 AWG
C) 4 AWG
D) 2 AWG
A) 8 AWG
B) 6 AWG
C) 4 AWG
D) 2 AWG
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
38
Article _______________ of the NEC covers the grounding and bonding requirements for residential services.
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
39
The __________ is the conductor used to connect the grounding electrode to a system conductor or equipment.
A) grounding electrode conductor
B) grounding conductor
C) neutral conductor
D) service conductor
A) grounding electrode conductor
B) grounding conductor
C) neutral conductor
D) service conductor
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
40
The type of cable normally used as the service drop for a residential service entrance is called __________.
A) quadplex cable
B) Romex
C) triplex cable
D) UF cable
A) quadplex cable
B) Romex
C) triplex cable
D) UF cable
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck
41
Explain why the NEC and local utility companies require the service entrance disconnecting means, if located inside a house, to be installed as close as possible to where the service conductors enter the house.
Unlock Deck
Unlock for access to all 41 flashcards in this deck.
Unlock Deck
k this deck

