Deck 10: Wall and Ceiling Framing

Full screen (f)
exit full mode
Question
Rafters are in a staggered alignment at the ridge when the ceiling joists are lapped.
Use Space or
up arrow
down arrow
to flip the card.
Question
Jack studs and window trimmers do the same type of job.
Question
In some locales, wind and seismic forces require the use of a(n) ____ to improve the lateral (side-to-side) strength of an exterior wall.

A) shearwall
B) embankment
C) buttress
D) abutment
Question
Exterior walls are referred to as walls, and interior walls are referred to as ____.

A) dividers
B) separators
C) segments
D) partitions
Question
____ studs provide for fastening of interior wall covering in the corners formed by intersecting walls.

A) Partition
B) Cantilevered
C) Extended
D) Trimmed
Question
Ribbands and strongbacks are similar where the ribband is used to carry more load.
Question
____ walls support the ceiling and roof.

A) End
B) Loadbearing
C) Free-standing
D) Non-loadbearing
Question
The width and height of rough openings are always indicated in the floor plans.
Question
____ bracing is a continuous diagonal 1 * 4 notched into the face of the studs, top plate, and sole plate at each corner of the building.

A) Let-in
B) Cut-in
C) Temporary
D) Metal
Question
____ is used to provide support for later fastening of trim or fixtures.

A) Molding
B) Bounding
C) Curbing
D) Backing
Question
Rough openings always have load bearing headers above them.
Question
In a balloon construction, ____ are used to support the second-floor joists.

A) bands
B) ribbons
C) bridges
D) girders
Question
The weight of the roof and weather are transferred from the roof to the exterior walls.
Question
A rough ceiling height of ____ is a standard for most homes.

A) 6'-1"
B) 7'-1"
C) 8'-1"
D) 10'-1"
Question
Plywood has a strength axis which should be installed perpendicular to the support members
Question
Wall sheathing is the first layer applied to wall studs.
Question
Headers run at right angles to wall studs.
Question
Horizontal application of steel furring channels on walls is preferred.
Question
The top and bottom horizontal members of a wall frame are called ____.

A) jacks
B) trimmers
C) plates
D) sills
Question
Corner posts are the same length as ____.

A) plates
B) studs
C) sills
D) shoes
Question
With the addition of a 2 * 6 installed on edge, the ribband becomes a ____.

A) post
B) gable end stud
C) ceiling joist
D) strongback
Question
____ channels or hat track are hat-shaped pieces made of 18- and 33-mil steel.

A) Cold-rolled
B) Hot-rolled
C) Paneling
D) Furring
Question
The main parts of an interior steel framing system are ____, track, channels, and accessories.

A) studs
B) rafters
C) sills
D) joists
Question
In a conventionally framed roof, the rafters and the ceiling joists form a ____.

A) triangle
B) square
C) pentagon
D) hexagon
Question
____ are short boards fastened to the side of a ceiling joist and centered on the joint.

A) Trimmers
B) Jacks
C) Scabs
D) Headers
Question
____ is installed to provide support for parts of the structure, weather-tightness, and draftstopping.

A) Sealing
B) Blocking
C) Jamming
D) Wedging
Question
____ insulated panels consist of two outer skins and an inner core of an insulating material.

A) Non-structural
B) Structural
C) Reinforced
D) Laminated
Question
Metal furring may be used on ceilings and walls by applying them at ____ angles to joists or studs.

A) obtuse
B) acute
C) right
D) variable
Question
Joists are toenailed into position with at least two ____ D (3-inch) nails.

A) 3
B) 6
C) 10
D) 16
Question
To estimate the amount of material needed for ____, multiply the total linear feet of wall by three and then add 5 percent for waste in cutting.

A) exterior wall studs
B) wall sheathing
C) ceiling joists
D) plates
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/30
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 10: Wall and Ceiling Framing
1
Rafters are in a staggered alignment at the ridge when the ceiling joists are lapped.
True
2
Jack studs and window trimmers do the same type of job.
True
3
In some locales, wind and seismic forces require the use of a(n) ____ to improve the lateral (side-to-side) strength of an exterior wall.

A) shearwall
B) embankment
C) buttress
D) abutment
A
4
Exterior walls are referred to as walls, and interior walls are referred to as ____.

A) dividers
B) separators
C) segments
D) partitions
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
5
____ studs provide for fastening of interior wall covering in the corners formed by intersecting walls.

A) Partition
B) Cantilevered
C) Extended
D) Trimmed
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
6
Ribbands and strongbacks are similar where the ribband is used to carry more load.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
7
____ walls support the ceiling and roof.

A) End
B) Loadbearing
C) Free-standing
D) Non-loadbearing
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
8
The width and height of rough openings are always indicated in the floor plans.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
9
____ bracing is a continuous diagonal 1 * 4 notched into the face of the studs, top plate, and sole plate at each corner of the building.

A) Let-in
B) Cut-in
C) Temporary
D) Metal
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
10
____ is used to provide support for later fastening of trim or fixtures.

A) Molding
B) Bounding
C) Curbing
D) Backing
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
11
Rough openings always have load bearing headers above them.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
12
In a balloon construction, ____ are used to support the second-floor joists.

A) bands
B) ribbons
C) bridges
D) girders
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
13
The weight of the roof and weather are transferred from the roof to the exterior walls.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
14
A rough ceiling height of ____ is a standard for most homes.

A) 6'-1"
B) 7'-1"
C) 8'-1"
D) 10'-1"
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
15
Plywood has a strength axis which should be installed perpendicular to the support members
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
16
Wall sheathing is the first layer applied to wall studs.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
17
Headers run at right angles to wall studs.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
18
Horizontal application of steel furring channels on walls is preferred.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
19
The top and bottom horizontal members of a wall frame are called ____.

A) jacks
B) trimmers
C) plates
D) sills
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
20
Corner posts are the same length as ____.

A) plates
B) studs
C) sills
D) shoes
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
21
With the addition of a 2 * 6 installed on edge, the ribband becomes a ____.

A) post
B) gable end stud
C) ceiling joist
D) strongback
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
22
____ channels or hat track are hat-shaped pieces made of 18- and 33-mil steel.

A) Cold-rolled
B) Hot-rolled
C) Paneling
D) Furring
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
23
The main parts of an interior steel framing system are ____, track, channels, and accessories.

A) studs
B) rafters
C) sills
D) joists
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
24
In a conventionally framed roof, the rafters and the ceiling joists form a ____.

A) triangle
B) square
C) pentagon
D) hexagon
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
25
____ are short boards fastened to the side of a ceiling joist and centered on the joint.

A) Trimmers
B) Jacks
C) Scabs
D) Headers
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
26
____ is installed to provide support for parts of the structure, weather-tightness, and draftstopping.

A) Sealing
B) Blocking
C) Jamming
D) Wedging
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
27
____ insulated panels consist of two outer skins and an inner core of an insulating material.

A) Non-structural
B) Structural
C) Reinforced
D) Laminated
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
28
Metal furring may be used on ceilings and walls by applying them at ____ angles to joists or studs.

A) obtuse
B) acute
C) right
D) variable
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
29
Joists are toenailed into position with at least two ____ D (3-inch) nails.

A) 3
B) 6
C) 10
D) 16
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
30
To estimate the amount of material needed for ____, multiply the total linear feet of wall by three and then add 5 percent for waste in cutting.

A) exterior wall studs
B) wall sheathing
C) ceiling joists
D) plates
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 30 flashcards in this deck.