Deck 9: Land Descriptions and Drawings
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/15
Play
Full screen (f)
Deck 9: Land Descriptions and Drawings
1
A drainage gate acts as a funnel to collect water and channel it into the storm system.
False
2
A ____ is used to show the area surrounding the construction site.
A) topography plan
B) vicinity map
C) landscape plan
D) grading plan
A) topography plan
B) vicinity map
C) landscape plan
D) grading plan
B
3
A rod is equal to ____.
A) 10' (3048 mm)
B) 15' (4572 mm)
C) 16.5' (5000 mm)
D) 20' (6096 mm)
A) 10' (3048 mm)
B) 15' (4572 mm)
C) 16.5' (5000 mm)
D) 20' (6096 mm)
D
4
A ____ is a drawing showing the surface of the ground and underlying earth taken along any desired fixed line.
A) Revit
B) phantom line
C) leader line
D) profile
A) Revit
B) phantom line
C) leader line
D) profile
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
5
A ____ is used to show the finished configuration of the building site.
A) grading plan
B) irrigation plan
C) landscape plan
D) topography plan
A) grading plan
B) irrigation plan
C) landscape plan
D) topography plan
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
6
A catch basin is covered by a metal cover level with the ground surface called a ____.
A) drainage grate
B) bound
C) profile
D) lateral
A) drainage grate
B) bound
C) profile
D) lateral
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
7
An underground concrete box called a ____ is often placed at the low point of swales to divert water from the site.
A) bound
B) mete
C) drainage grate
D) catch basin
A) bound
B) mete
C) drainage grate
D) catch basin
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
8
A(n) ____ shows the existing contour of the construction site.
A) grading plan
B) irrigation plan
C) landscape plan
D) topography plan
A) grading plan
B) irrigation plan
C) landscape plan
D) topography plan
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
9
In arid climates, an irrigation plan may be required to show how landscaping will be maintained.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
10
A ____ may be provided to show the location, type, size, and quantity of all vegetation required for the project.
A) grading plan
B) contour plan
C) landscape plan
D) topography plan
A) grading plan
B) contour plan
C) landscape plan
D) topography plan
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
11
A chain is equal to 16.5' (5000 mm) or 5.5 yd.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
12
Legal descriptions specify land parcels as they are bought, sold, and taxed.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
13
A grading plan uses contour lines to represent existing and finished grades.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
14
The pipe that connects the construction site to the public sewer pipe is referred to as a ____.
A) drainage grate
B) bound
C) lateral
D) mete
A) drainage grate
B) bound
C) lateral
D) mete
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
15
Lines used to represent a specific elevation are referred to as ____.
A) cutting planes
B) contour lines
C) object line
D) break lines
A) cutting planes
B) contour lines
C) object line
D) break lines
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck

