Deck 30: Reading Plumbing Plans
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/10
Play
Full screen (f)
Deck 30: Reading Plumbing Plans
1
Understanding mechanical, electrical and plumbing plans is neccessary for each tradesman.
True
2
Certain line weighs and configurations denote various types of _________.
piping
3
On the plan, the _______ and ________ of each piping system is shown.
size and location
4
The sanitary piping is located above gound except for the part that turns up to connect to the plumbing fixtures.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
5
The sanitary drainage piping is shown as a heavy soild line.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
6
The Plumbing Fixture ________ idenifies the manfacturem model number, and other pertinent information about each fiture.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
7
Details show specific information on connections, installation, and fittings.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
8
The demestic cold water piping includes the service piping to the building and the ________ piping to the building.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
9
The plumbing vent piping is shown with a series of dashes.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
10
Water and air cannot occupy the same ___________.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck

