Deck 5: Different Construction Contract Delivery Methods

Full screen (f)
exit full mode
Question
The best part about Design-Bid-Build is it does not create an adversarial atmosphere
Use Space or
up arrow
down arrow
to flip the card.
Question
A special purpose vehicle is created specifically for executing a PPP project
Question
Design-Bid-Build

A) can cause adversarial relationships between Owner, Designer and Constructor
B) is no longer a common form of contracting
C) is the oldest form of contracting
D) should be avoided as a form of contracting
Question
An advantage of Design-Bid-Build is

A) it usually provides close to final pricing before the work begins
B) the Owner usually gets more for the money than other methods
C) quality is improved
D) schedule is minimized
Question
Multi-prime Contracting

A) is hazardous
B) usually improves the schedule
C) is often done by public authorities such as school boards
D) saves the Owner supervision
Question
Design Builders

A) are not commonly found except on very large projects
B) usually resolve their own disputes between design and construction
C) are a new form of Constructor
D) are not commonly found except on small projects
Question
IPD

A) stands for Important Project Directive and can significantly affect cost or schedule
B) is intended to bring several entities together to help complete the entire project
C) works best when the Construction Manager can control the schedule
D) works best when the Construction Manager can control both the cost and schedule
Question
PPP

A) stands for Private Public Partnership
B) puts price as a priority
C) creates difficult relationships
D) improves private petroleum production in certain states
Question
BIM

A) is Building Information Management
B) is best with input during the design phase from critical trades
C) is the way construction has always been successful
D) helps cost but often lengthens the schedule
Question
A CM at Risk

A) has safety violations that need to be addressed
B) must be bonded on the project
C) will need to closely analyze design and construction related to a Guaranteed Maximum Price
D) can escape risk by passing it on to the Constructor
Question
IPD relies upon full and open communication between all parties
Question
PPP stands for Private Public Partnership
Question
The expertise of each party is to be shared in an IPD relationship
Question
In Design-Bid-Build, the Owner usually has a good idea of the final price for the project
Question
Desig-Bid-Build is a way for the Owner to get a very competitive price
Question
In Design-Bid-Build, the roles of the parties overlap and even duplicate each other so it is easier to complete the work
Question
Multi-prime Contracting is most often used by public Owners, such as School Boards
Question
Construction Managers do not assume the risk when they oversee a General Contractor
Question
Since the Design Builder is liable for all design ambiguities and defect, there is less arguing and fault-finding and more solutions come forth quicker
Question
Specialty Contractors are sometimes required to install equipment to meet a certain level of performance
Question
IPD stands for Immediate Project Delivery
Question
Full and Open communication is expected between IPD parties
Question
Using complete sentences, describe in full the construction contract delivery methods. Be very careful to provide the distinguishing characteristics of each.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/23
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 5: Different Construction Contract Delivery Methods
1
The best part about Design-Bid-Build is it does not create an adversarial atmosphere
False
2
A special purpose vehicle is created specifically for executing a PPP project
True
3
Design-Bid-Build

A) can cause adversarial relationships between Owner, Designer and Constructor
B) is no longer a common form of contracting
C) is the oldest form of contracting
D) should be avoided as a form of contracting
A
4
An advantage of Design-Bid-Build is

A) it usually provides close to final pricing before the work begins
B) the Owner usually gets more for the money than other methods
C) quality is improved
D) schedule is minimized
Unlock Deck
Unlock for access to all 23 flashcards in this deck.
Unlock Deck
k this deck
5
Multi-prime Contracting

A) is hazardous
B) usually improves the schedule
C) is often done by public authorities such as school boards
D) saves the Owner supervision
Unlock Deck
Unlock for access to all 23 flashcards in this deck.
Unlock Deck
k this deck
6
Design Builders

A) are not commonly found except on very large projects
B) usually resolve their own disputes between design and construction
C) are a new form of Constructor
D) are not commonly found except on small projects
Unlock Deck
Unlock for access to all 23 flashcards in this deck.
Unlock Deck
k this deck
7
IPD

A) stands for Important Project Directive and can significantly affect cost or schedule
B) is intended to bring several entities together to help complete the entire project
C) works best when the Construction Manager can control the schedule
D) works best when the Construction Manager can control both the cost and schedule
Unlock Deck
Unlock for access to all 23 flashcards in this deck.
Unlock Deck
k this deck
8
PPP

A) stands for Private Public Partnership
B) puts price as a priority
C) creates difficult relationships
D) improves private petroleum production in certain states
Unlock Deck
Unlock for access to all 23 flashcards in this deck.
Unlock Deck
k this deck
9
BIM

A) is Building Information Management
B) is best with input during the design phase from critical trades
C) is the way construction has always been successful
D) helps cost but often lengthens the schedule
Unlock Deck
Unlock for access to all 23 flashcards in this deck.
Unlock Deck
k this deck
10
A CM at Risk

A) has safety violations that need to be addressed
B) must be bonded on the project
C) will need to closely analyze design and construction related to a Guaranteed Maximum Price
D) can escape risk by passing it on to the Constructor
Unlock Deck
Unlock for access to all 23 flashcards in this deck.
Unlock Deck
k this deck
11
IPD relies upon full and open communication between all parties
Unlock Deck
Unlock for access to all 23 flashcards in this deck.
Unlock Deck
k this deck
12
PPP stands for Private Public Partnership
Unlock Deck
Unlock for access to all 23 flashcards in this deck.
Unlock Deck
k this deck
13
The expertise of each party is to be shared in an IPD relationship
Unlock Deck
Unlock for access to all 23 flashcards in this deck.
Unlock Deck
k this deck
14
In Design-Bid-Build, the Owner usually has a good idea of the final price for the project
Unlock Deck
Unlock for access to all 23 flashcards in this deck.
Unlock Deck
k this deck
15
Desig-Bid-Build is a way for the Owner to get a very competitive price
Unlock Deck
Unlock for access to all 23 flashcards in this deck.
Unlock Deck
k this deck
16
In Design-Bid-Build, the roles of the parties overlap and even duplicate each other so it is easier to complete the work
Unlock Deck
Unlock for access to all 23 flashcards in this deck.
Unlock Deck
k this deck
17
Multi-prime Contracting is most often used by public Owners, such as School Boards
Unlock Deck
Unlock for access to all 23 flashcards in this deck.
Unlock Deck
k this deck
18
Construction Managers do not assume the risk when they oversee a General Contractor
Unlock Deck
Unlock for access to all 23 flashcards in this deck.
Unlock Deck
k this deck
19
Since the Design Builder is liable for all design ambiguities and defect, there is less arguing and fault-finding and more solutions come forth quicker
Unlock Deck
Unlock for access to all 23 flashcards in this deck.
Unlock Deck
k this deck
20
Specialty Contractors are sometimes required to install equipment to meet a certain level of performance
Unlock Deck
Unlock for access to all 23 flashcards in this deck.
Unlock Deck
k this deck
21
IPD stands for Immediate Project Delivery
Unlock Deck
Unlock for access to all 23 flashcards in this deck.
Unlock Deck
k this deck
22
Full and Open communication is expected between IPD parties
Unlock Deck
Unlock for access to all 23 flashcards in this deck.
Unlock Deck
k this deck
23
Using complete sentences, describe in full the construction contract delivery methods. Be very careful to provide the distinguishing characteristics of each.