Deck 6: Construction and Building Foundations
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/25
Play
Full screen (f)
Deck 6: Construction and Building Foundations
1
A type of cast-in-situ pile which has an enlarged base and a corrugated stem, is
A)simplex pile
B)Franki pile
C)vibro-pile
D)Raymond pile
A)simplex pile
B)Franki pile
C)vibro-pile
D)Raymond pile
Franki pile
2
The type of foundation most suitable for brideges is
A)pier foundation
B)raft foundation
C)pile foundation
D)strap foundation
A)pier foundation
B)raft foundation
C)pile foundation
D)strap foundation
pile foundation
3
The cement which is commonly used in all types of structures and require no special consideration, is called
A)rapid hardening cement
B)normal setting cement
C)quick setting cement
D)white cement
A)rapid hardening cement
B)normal setting cement
C)quick setting cement
D)white cement
normal setting cement
4
The depth of arch is the
A)vertical distance between the springing line and the highest point on the intrados
B)vertical distance between the springing line and the highest point on the extrados
C)perpendicular distance between the intrados and extrados
D)horizontal distance between the supports
A)vertical distance between the springing line and the highest point on the intrados
B)vertical distance between the springing line and the highest point on the extrados
C)perpendicular distance between the intrados and extrados
D)horizontal distance between the supports
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
5
In residential building, the average value of stair width is
A)600 mm
B)700 mm
C)800 mm
D)900 mm
A)600 mm
B)700 mm
C)800 mm
D)900 mm
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
6
The process of filling up all mail holes, cracks etc. with putty is known as
A)knotting
B)priming
C)stopping
D)finishing
A)knotting
B)priming
C)stopping
D)finishing
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
7
Coping is defined as a
A)horizontal course of masonry projecting from the face of the wall
B)horizontal moulded projection provided ner the top of a building
C)covering placed on the exposed top of an external wall
D)triangular shaped portion of masonry at the end of a sloped roof
A)horizontal course of masonry projecting from the face of the wall
B)horizontal moulded projection provided ner the top of a building
C)covering placed on the exposed top of an external wall
D)triangular shaped portion of masonry at the end of a sloped roof
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
8
Which of the following statement is correct?
A)The cavity should start near the ground level.
B)The cavity should terminate near eaves level in case of sloping roof.
C)The cavity should terminate near coping in case of flat roof with parapet wall.
D)all of the above
A)The cavity should start near the ground level.
B)The cavity should terminate near eaves level in case of sloping roof.
C)The cavity should terminate near coping in case of flat roof with parapet wall.
D)all of the above
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
9
The pitch of stair should never exceed
A)20°
B)25°
C)30°
D)40°
A)20°
B)25°
C)30°
D)40°
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
10
In a stretching bond
A)all the bricks are laid as headers
B)all the bricks are laid as stretchers
C)the arrangement of bricks is similar to English bond
D)the bonding bricks are laid at any angle other than zero or ninety degrees
A)all the bricks are laid as headers
B)all the bricks are laid as stretchers
C)the arrangement of bricks is similar to English bond
D)the bonding bricks are laid at any angle other than zero or ninety degrees
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
11
For ordinary Portland cement, the initial setting time should not be more than
A)30 minutes
B)1 hour
C)5 hours
D)10 hours
A)30 minutes
B)1 hour
C)5 hours
D)10 hours
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
12
Corbel is the extension of one or more course of bricks from the
A)face
B)back
A)face
B)back
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
13
The intermediate support of an arch is known as pier.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
14
If the water-cement ratio is low, the strength of the mix is high.
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
15
The flooring made with small pieces of broken tiles of china glazed or of marble arranged in different pattern, is known as
A)asphalt flooring
B)mosaic flooring
C)terrazo flooring
D)granolithic flooring
A)asphalt flooring
B)mosaic flooring
C)terrazo flooring
D)granolithic flooring
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
16
Which of the following foundation is used for weaker soil?
A)Column footing
B)Grillage footing
C)Raft footing
D)all of these
A)Column footing
B)Grillage footing
C)Raft footing
D)all of these
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
17
A tomparary structure constructed in a river for excluding water from a given site to enable the building operation to be performed on dry surface, is called
A)caisson
B)cofferdam
C)well foundation
D)raft foundatio
A)caisson
B)cofferdam
C)well foundation
D)raft foundatio
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
18
The minimum depth of foundation for the load bearing wall of a building is restricted to
A)600 mm
B)700 mm
C)800 mm
D)900 mm
A)600 mm
B)700 mm
C)800 mm
D)900 mm
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
19
A pitched roof in which rafters slope to one side only is called
A)lean-to roof
B)Pent roof
C)Aisle roof
D)any one of these
A)lean-to roof
B)Pent roof
C)Aisle roof
D)any one of these
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
20
When two or more footings are connected by a beam, it is called
A)beam footing
B)combined footing
C)strap footing
D)mat footing
A)beam footing
B)combined footing
C)strap footing
D)mat footing
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
21
A type of bond in a brick masonry in which each course consists of alternate headers and stretchers, is called
A)English bond
B)Flemish bond
C)stretching bond
D)heading bond
A)English bond
B)Flemish bond
C)stretching bond
D)heading bond
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
22
The diameter of the drilled piles should not exceed
A)200 mm
B)400 mm
C)600 mm
D)800 mm
A)200 mm
B)400 mm
C)600 mm
D)800 mm
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
23
The dampness on roof may be due to
A)use of porous materials
B)insufficient lap of covering material
C)bad workmanship in plumbing
D)all of these
A)use of porous materials
B)insufficient lap of covering material
C)bad workmanship in plumbing
D)all of these
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
24
The perpendicular distance between the intrados and extrados of an arch, is called
A)pitch of an arch
B)depth of an arch
C)width of an arch
D)thickness of an arch
A)pitch of an arch
B)depth of an arch
C)width of an arch
D)thickness of an arch
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck
25
For D.P.C. at plinth level, the commonly adopted material is
A)bitumen sheeting
B)plastic sheeting
C)mastic asphalt
D)cement concrete
A)bitumen sheeting
B)plastic sheeting
C)mastic asphalt
D)cement concrete
Unlock Deck
Unlock for access to all 25 flashcards in this deck.
Unlock Deck
k this deck