Deck 21: Just-In-Timelean Manufacturing Jitlean
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/10
Play
Full screen (f)
Deck 21: Just-In-Timelean Manufacturing Jitlean
1
JIT/LEAN/Lean minimizes production lot sizes.
True
2
In order for JIT/LEAN/Lean to bring about all the benefits inherent in its philosophy, it must be part of a total quality system.
True
3
In a JIT/LEAN/Lean production facility, the supplying process makes product, then stores it until a Kanban from the receiving process notifies the supplying process that product is needed.
False
4
In a JIT/LEAN plant, there is no such thing as a bottleneck.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
5
Automation is being superseded by JIT/LEAN/Lean in manufacturing plants.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
6
The JIT/LEAN/Lean "pull" system ensures that:
A) Costs are minimized through "economy of scale."
B) That the production line will never stop because of a problem
C) Buffer stocks are on hand to prevent line stoppage when a critical machine fails.
D) The internal supplier process does not build product unless told to do so by the internal customer process.
A) Costs are minimized through "economy of scale."
B) That the production line will never stop because of a problem
C) Buffer stocks are on hand to prevent line stoppage when a critical machine fails.
D) The internal supplier process does not build product unless told to do so by the internal customer process.
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
7
Which of the following individuals are identified as the developer of JIT/LEAN/Lean?
A) Eiji Toyoda
B) W. Edwards Deming
C) Taiichi Ohno
D) Henry Ford
A) Eiji Toyoda
B) W. Edwards Deming
C) Taiichi Ohno
D) Henry Ford
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
8
Reduced setup times are essential for:
A) Supporting smaller lot sizes
B) Preventing machine problems
C) Making larger lot sizes possible
D) Reducing machine maintenance time
A) Supporting smaller lot sizes
B) Preventing machine problems
C) Making larger lot sizes possible
D) Reducing machine maintenance time
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
9
It is critical that machines used in JIT/LEAN/Lean processes are consistent and reliable. Which of the following philosophies are used to assure that?
A) Concurrent engineering
B) Total Productive Maintenance (TPM)
C) If it isn't broken, don't fix it
D) Frequent machine replacement
A) Concurrent engineering
B) Total Productive Maintenance (TPM)
C) If it isn't broken, don't fix it
D) Frequent machine replacement
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck
10
Which of the following are NOT consistent with JIT/LEAN/Lean manufacturing?
A) Partnering with suppliers
B) Product flexibility
C) Having environmentally controlled warehouses
D) Elimination of all kinds of waste
A) Partnering with suppliers
B) Product flexibility
C) Having environmentally controlled warehouses
D) Elimination of all kinds of waste
Unlock Deck
Unlock for access to all 10 flashcards in this deck.
Unlock Deck
k this deck