Deck 15: 3D Design Database and Drawing Management
1
The reproduction process requiring exposure to light and ammonia vapor is the:
A) Diazo-moist
B) Diazo-dry
C) Blueprint
D) Zerography
E) Digital image
A) Diazo-moist
B) Diazo-dry
C) Blueprint
D) Zerography
E) Digital image
Blueprint
2
A reproduction process that gives black lines on a white background using a selenium-coated and electrostatically charged plate is the:
A) Diazo-moist
B) Diazo-dry
C) Blueprint
D) Zerography
E) Digital image
A) Diazo-moist
B) Diazo-dry
C) Blueprint
D) Zerography
E) Digital image
Zerography
3
A rewritable media storage generally not suitable for archival storage yet has fast retrieval speeds describes:
A) Photostats
B) Optical disk
C) CD-ROM
D) Xerography
E) Offset printing
A) Photostats
B) Optical disk
C) CD-ROM
D) Xerography
E) Offset printing
Optical disk
4
A photographic image of information, records, or drawings that is stored on film at a greatly reduced scale describes:
A) Line etching
B) Optical disk storage
C) Offset printing
D) Photostats
E) Microfilm
A) Line etching
B) Optical disk storage
C) Offset printing
D) Photostats
E) Microfilm
Unlock Deck
Unlock for access to all 13 flashcards in this deck.
Unlock Deck
k this deck
5
Legal standards for the retention of engineering drawings require that they be retained for:
A) 2 years
B) 5 years
C) 10 years
D) 50 years
E) The legal standards are unique to state and industry.
A) 2 years
B) 5 years
C) 10 years
D) 50 years
E) The legal standards are unique to state and industry.
Unlock Deck
Unlock for access to all 13 flashcards in this deck.
Unlock Deck
k this deck
6
Revised drawings must be ______________ for future reference.
A) Tracked
B) Identified
C) Logged
D) Saved
E) All of the above
A) Tracked
B) Identified
C) Logged
D) Saved
E) All of the above
Unlock Deck
Unlock for access to all 13 flashcards in this deck.
Unlock Deck
k this deck
7
Electronic drawings require approval authorities and are applied electronically.
Unlock Deck
Unlock for access to all 13 flashcards in this deck.
Unlock Deck
k this deck
8
Change orders are seldom required and therefore do not need tracking.
Unlock Deck
Unlock for access to all 13 flashcards in this deck.
Unlock Deck
k this deck
9
It is recommended that you have a single "work" directory for all the current projects you are working on.
Unlock Deck
Unlock for access to all 13 flashcards in this deck.
Unlock Deck
k this deck
10
An effective drawing/document management software requires setup tome, training, and ongoing effort to maintain established standards.
Unlock Deck
Unlock for access to all 13 flashcards in this deck.
Unlock Deck
k this deck
11
Even with extensive network drives, backups are essential.
Unlock Deck
Unlock for access to all 13 flashcards in this deck.
Unlock Deck
k this deck
12
With the increased use of electronic data, including CAD, the use of paper has been greatly reduced.
Unlock Deck
Unlock for access to all 13 flashcards in this deck.
Unlock Deck
k this deck
13
Changes to original drawings must be documented in a ____________ block showing what, who, and when the change was made.
Unlock Deck
Unlock for access to all 13 flashcards in this deck.
Unlock Deck
k this deck