Deck 7: Project Cost Management
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/102
Play
Full screen (f)
Deck 7: Project Cost Management
1
Project managers must conduct cash flow analysis to determine net present value.
True
Explanation: Cash flow analysis is a method of determining the estimated annual costs and benefits for a project and the resulting annual cash flow. Project managers must conduct cash flow analysis to determine net present value.
Explanation: Cash flow analysis is a method of determining the estimated annual costs and benefits for a project and the resulting annual cash flow. Project managers must conduct cash flow analysis to determine net present value.
2
It is important for project managers to focus on indirect costs because they can be easily controlled.
False
Explanation: Direct costs can be directly related to creating the products and services of the project. Project managers should focus on direct costs because they can be controlled.
Explanation: Direct costs can be directly related to creating the products and services of the project. Project managers should focus on direct costs because they can be controlled.
3
A budgetary estimate is the most accurate of the three types of estimates.
False
Explanation: A definitive estimate provides an accurate estimate of project costs. It provides details for purchases and estimates actual costs.
Explanation: A definitive estimate provides an accurate estimate of project costs. It provides details for purchases and estimates actual costs.
4
When deciding what projects to invest in or continue, one should include sunk costs.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
5
Analogous estimates are the most accurate technique to estimate costs.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
6
If an important supplier goes out of business, management reserves can be set aside to cover the resulting costs.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
7
Budgetary estimates are made even before a project is officially started.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
8
One of the reasons why project cost estimates are inaccurate is because human beings are biased toward underestimation.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
9
Contingency reserves are also known as unknown unknowns.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
10
Intangible costs can be easily measured in monetary terms.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
11
In a bottom-up estimate, the size of the individual work items is one of the factors that drives the accuracy of the estimates.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
12
IT project managers must be able to present and discuss project information both in financial and technical terms.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
13
Supporting details for an estimate include the ground rules and assumptions used in creating the estimate.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
14
Overrun is the additional percentage amount by which estimates exceed actual costs.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
15
A cost management plan can include organizational procedures links, control thresholds, and process descriptions.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
16
The primary output of the planning cost management process is a change request.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
17
Estimates should become more accurate as time progresses.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
18
Definitive estimates are made one year or less prior to project completion.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
19
Analogous estimates are called activity-based costing.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
20
Parametric models are reliable when the models are flexible in terms of the project's size.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
21
Which of the following is true of tangible costs?
A)They cannot be calculated in monetary terms.
B)They can be easily measured.
C)They are difficult to quantify.
D)Their examples include goodwill and prestige.
A)They cannot be calculated in monetary terms.
B)They can be easily measured.
C)They are difficult to quantify.
D)Their examples include goodwill and prestige.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
22
A schedule performance index of one means that the project is on schedule.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
23
Which of the following involves developing an approximation of the costs of resources needed to complete a project?
A)Determining the budget
B)Finalising the cost baseline
C)Controlling costs
D)Estimating costs
A)Determining the budget
B)Finalising the cost baseline
C)Controlling costs
D)Estimating costs
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
24
Profits may be defined as:
A)expenses plus net income.
B)costs plus revenues.
C)revenues plus expenses.
D)revenues minus expenditures.
A)expenses plus net income.
B)costs plus revenues.
C)revenues plus expenses.
D)revenues minus expenditures.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
25
If cost variance is a positive number, it means that performing the work costs more than planned.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
26
It is important for project managers to understand that every cost estimate is unique.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
27
Determining the budget involves allocating the project cost estimate to individual work items over time.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
28
One of the main outputs of the _____ process is a cost baseline.
A)cost controlling
B)cost estimating
C)cost budgeting
D)cost planning
A)cost controlling
B)cost estimating
C)cost budgeting
D)cost planning
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
29
Spreadsheets are a common tool for cost estimating, cost budgeting, and cost control.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
30
_____ helps develop an accurate projection of a project's financial expenses and benefits.
A)Critical path analysis
B)Fast tracking
C)Life cycle costing
D)Crashing
A)Critical path analysis
B)Fast tracking
C)Life cycle costing
D)Crashing
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
31
_____ involves allocating the overall cost estimate to individual work items to establish a baseline for measuring performance.
A)Determining the budget
B)Finalising policies for project costs
C)Controlling costs
D)Estimating costs
A)Determining the budget
B)Finalising policies for project costs
C)Controlling costs
D)Estimating costs
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
32
A negative schedule variance means that it took lesser than planned to perform the work.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
33
The project management plan and project funding requirements are inputs of the process of controlling costs.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
34
The process of controlling costs primarily involves:
A)determining the policies for project costs.
B)managing changes to the project budget.
C)finalising the procedures for project costs.
D)determining a basis for estimates.
A)determining the policies for project costs.
B)managing changes to the project budget.
C)finalising the procedures for project costs.
D)determining a basis for estimates.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
35
If the cost performance index (CPI) is less than 100 percent, the project is under budget.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
36
_____ is a method for determining the estimated annual costs and benefits for a project.
A)Critical path analysis
B)Cash flow analysis
C)Present value analysis
D)Requirements analysis
A)Critical path analysis
B)Cash flow analysis
C)Present value analysis
D)Requirements analysis
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
37
The formulas for variances and indexes start with EV, the earned value.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
38
Work performance information and cost forecasts are main outputs of the _____ process.
A)cost budgeting
B)cost estimating
C)cost control
D)cost pricing
A)cost budgeting
B)cost estimating
C)cost control
D)cost pricing
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
39
In an earned value chart, when the actual cost line is right on or above the earned value line, it indicates that costs are less than planned.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
40
_____ includes the processes required to ensure that a project team completes a project within an approved budget.
A)Project scope management
B)Project quality management
C)Project time management
D)Project cost management
A)Project scope management
B)Project quality management
C)Project time management
D)Project cost management
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
41
Indirect costs are:
A)directly related to performing the project.
B)those that cannot be allocated to projects.
C)those that can be easily controlled by managers.
D)not directly related to the products or services of a project.
A)directly related to performing the project.
B)those that cannot be allocated to projects.
C)those that can be easily controlled by managers.
D)not directly related to the products or services of a project.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
42
Which of the following is true of a rough order of magnitude estimate?
A)It is used to allocate money into an organization's budget.
B)It provides an estimate of what a project will cost.
C)Its timeframe is always less than a year prior to project completion.
D)It is a type of estimate that is done in the final stages of a project.
A)It is used to allocate money into an organization's budget.
B)It provides an estimate of what a project will cost.
C)Its timeframe is always less than a year prior to project completion.
D)It is a type of estimate that is done in the final stages of a project.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
43
Soles is a footwear company which has recently set up its store in Ambrosia. To manufacture its products, Soles incurs a range of different costs. Which of the following would be an example of an indirect cost?
A)Cost of machines to produce shoes
B)Salary paid to factory workers
C)Electricity used to run its factories
D)Cost of leather used to manufacture shoes
A)Cost of machines to produce shoes
B)Salary paid to factory workers
C)Electricity used to run its factories
D)Cost of leather used to manufacture shoes
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
44
Which of the following is most likely to be a reason for inaccuracies in information technology cost estimates?
A)Estimates take a long time to be worked out.
B)People lack estimating experience.
C)Human beings are biased toward overestimation.
D)Only software development provides the scope for estimates to be accurate.
A)Estimates take a long time to be worked out.
B)People lack estimating experience.
C)Human beings are biased toward overestimation.
D)Only software development provides the scope for estimates to be accurate.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
45
Which of the following reserves allows for future situations that are unpredictable?
A)Contingency reserves
B)Management reserves
C)Known unknowns
D)Cost baseline reserves
A)Contingency reserves
B)Management reserves
C)Known unknowns
D)Cost baseline reserves
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
46
Which of the following is true of analogous estimates?
A)Their main disadvantage is that they cost more than other techniques.
B)They are the only technique which do not require expert judgement.
C)They are most reliable when previous projects are similar in fact with current projects.
D)They use project characteristics in a mathematical model to estimate project costs.
A)Their main disadvantage is that they cost more than other techniques.
B)They are the only technique which do not require expert judgement.
C)They are most reliable when previous projects are similar in fact with current projects.
D)They use project characteristics in a mathematical model to estimate project costs.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
47
A _____ estimate is used for making many purchasing decisions for which accurate estimates are required and for estimating final project costs.
A)budgetary
B)definitive
C)rough order of magnitude
D)final
A)budgetary
B)definitive
C)rough order of magnitude
D)final
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
48
Analogous estimates are also known as _____ estimates.
A)bottom-up
B)top-down
C)parametric
D)budgetary
A)bottom-up
B)top-down
C)parametric
D)budgetary
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
49
The first step in project cost management is:
A)to allocate project cost estimates to individual material resources.
B)to plan how costs will be managed.
C)to control project costs and monitor cost performance.
D)to develop several estimates of costs for different types of resources.
A)to allocate project cost estimates to individual material resources.
B)to plan how costs will be managed.
C)to control project costs and monitor cost performance.
D)to develop several estimates of costs for different types of resources.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
50
Which of the following is true of contingency reserves?
A)They allow for future situations that can be partially planned for.
B)They are also known as unknown unknowns.
C)They are not included in a cost baseline.
D)They allow for dollar amounts to be used to cover existing, fixed costs.
A)They allow for future situations that can be partially planned for.
B)They are also known as unknown unknowns.
C)They are not included in a cost baseline.
D)They allow for dollar amounts to be used to cover existing, fixed costs.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
51
_____ uses project characteristics in a mathematical model to estimate project costs.
A)Rough order of magnitude estimating
B)Parametric estimating
C)Bottom-up estimating
D)Analogous estimating
A)Rough order of magnitude estimating
B)Parametric estimating
C)Bottom-up estimating
D)Analogous estimating
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
52
If the cost estimate for a project is a basis for contract awards and performance reporting, it should be a(n) _____ estimate and as accurate as possible.
A)budgetary
B)definitive
C)rough order of magnitude
D)analogous
A)budgetary
B)definitive
C)rough order of magnitude
D)analogous
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
53
Which of the following is true of bottom-up estimates?
A)They are based on the actual cost of a previous, similar project.
B)They are also known as parametric estimating.
C)They are most accurate when they involve large, extensive work items.
D)They are time-intensive and expensive to develop.
A)They are based on the actual cost of a previous, similar project.
B)They are also known as parametric estimating.
C)They are most accurate when they involve large, extensive work items.
D)They are time-intensive and expensive to develop.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
54
_____ are those costs that are difficult to measure in monetary terms.
A)Intangible costs
B)Direct costs
C)Tangible costs
D)Fixed costs
A)Intangible costs
B)Direct costs
C)Tangible costs
D)Fixed costs
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
55
A cost estimation tool which involves estimating individual work items or activities and summing them to get a project total is known as a(n) _____ estimate.
A)budgetary
B)parametric
C)bottom-up
D)analogous
A)budgetary
B)parametric
C)bottom-up
D)analogous
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
56
Which of the following types of estimate use the actual cost of a previous, similar project as the basis for estimating the cost of the current project?
A)Definitive estimates
B)Parametric estimates
C)Bottom-up estimates
D)Analogous estimates
A)Definitive estimates
B)Parametric estimates
C)Bottom-up estimates
D)Analogous estimates
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
57
A cost estimation tool which is used to allocate money into an organization's budget is known as a _____ estimate.
A)budgetary
B)definitive
C)rough order of magnitude
D)ballpark
A)budgetary
B)definitive
C)rough order of magnitude
D)ballpark
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
58
Good Earth, a company manufacturing packaged food products, sets up its stores in Baltonia. However, a year later, the company closes the store down due to high operating costs. In such a scenario, the money spent in paying for the rent of the store in Baltonia would be an example of _____ costs.
A)recurring
B)direct
C)sunk
D)intangible
A)recurring
B)direct
C)sunk
D)intangible
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
59
A rough order of magnitude estimate can be referred to as a _____ estimate.
A)definitive
B)budgetary
C)final
D)ballpark
A)definitive
B)budgetary
C)final
D)ballpark
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
60
Newtech Inc. hires John for the position of a software programmer to work on their new project. Salary paid to John by Newtech Inc. would be an example of _____ costs.
A)direct
B)indirect
C)sunk
D)intangible
A)direct
B)indirect
C)sunk
D)intangible
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
61
The main outputs of the _____ process are activity cost estimates, basis of estimates, and project document updates.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
62
_____ costing considers the total cost of ownership, or development plus support costs, for a project.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
63
The _____ theory states that when many items are produced repetitively, the unit cost of those items decreases in a regular pattern as more units are produced.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
64
Project managers must conduct cash flow analysis to determine _____.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
65
Schedule variance is:
A)the earned value minus the planned value.
B)the earned value minus the actual cost.
C)the planned value plus the earned value.
D)the planned value plus the rate of performance.
A)the earned value minus the planned value.
B)the earned value minus the actual cost.
C)the planned value plus the earned value.
D)the planned value plus the rate of performance.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
66
Cost variance is:
A)the planned value plus actual costs.
B)the earned value minus the actual cost.
C)the rate of performance minus earned value.
D)the planned value minus the rate of performance.
A)the planned value plus actual costs.
B)the earned value minus the actual cost.
C)the rate of performance minus earned value.
D)the planned value minus the rate of performance.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
67
_____ costing helps to see a big-picture view of the cost of a project throughout its life cycle.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
68
_____ are revenues minus expenditures.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
69
The budget is one of the three values of earned value management and is also known as _____.
A)earned value
B)actual cost
C)indirect cost
D)planned value
A)earned value
B)actual cost
C)indirect cost
D)planned value
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
70
The main output of the planning cost management process is a(n) _____.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
71
Which of the following is true of the schedule performance index (SPI)?
A)It can be used to estimate the projected time to complete the project.
B)It means that a project is behind schedule if an SPI is greater than one.
C)It means that a project is ahead of schedule if SPI is lesser than one or hundred percent.
D)It is the ratio of planned value to actual costs.
A)It can be used to estimate the projected time to complete the project.
B)It means that a project is behind schedule if an SPI is greater than one.
C)It means that a project is ahead of schedule if SPI is lesser than one or hundred percent.
D)It is the ratio of planned value to actual costs.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
72
Variances are calculated by subtracting the actual cost from _____.
A)earned value
B)schedule variance
C)planned value
D)rate of performance
A)earned value
B)schedule variance
C)planned value
D)rate of performance
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
73
The main outputs of the _____ process are a cost performance baseline, project funding requirements, and project document updates.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
74
The cost performance index (CPI):
A)indicates that a project is under budget if CPI is less than one.
B)can be used to estimate the projected cost of completing the project.
C)indicates that the planned and actual costs are equal if CPI is more than one.
D)is the ratio of earned value to planned value.
A)indicates that a project is under budget if CPI is less than one.
B)can be used to estimate the projected cost of completing the project.
C)indicates that the planned and actual costs are equal if CPI is more than one.
D)is the ratio of earned value to planned value.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
75
Which of the following is an output of the process of controlling costs?
A)Cost forecasts
B)Project funding requirements
C)Basis of estimates
D)Scope baselines
A)Cost forecasts
B)Project funding requirements
C)Basis of estimates
D)Scope baselines
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
76
The additional percentage or dollar amount by which actual costs exceed estimates is known as a(n) _____.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
77
Which of the following is an input of the process of controlling costs?
A)Cost forecasts
B)Work performance data
C)Change requests
D)Scope baseline
A)Cost forecasts
B)Work performance data
C)Change requests
D)Scope baseline
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
78
Which of the following is true of earned value?
A)It is the actual cost plus the planned cost.
B)It is based solely on the total cost estimate to be spent on an activity.
C)It is an estimate of the value of the physical work actually completed.
D)It is also known as the planned value.
A)It is the actual cost plus the planned cost.
B)It is based solely on the total cost estimate to be spent on an activity.
C)It is an estimate of the value of the physical work actually completed.
D)It is also known as the planned value.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
79
Accountants define _____ as a resource sacrificed or foregone to to achieve a specific objective.
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck
80
The main goal of the _____ process is to produce a cost baseline for measuring project performance and project funding requirements.
A)cost budgeting
B)cost planning
C)cost controlling
D)cost estimating
A)cost budgeting
B)cost planning
C)cost controlling
D)cost estimating
Unlock Deck
Unlock for access to all 102 flashcards in this deck.
Unlock Deck
k this deck