Deck 37: Construction of Semicircular and Segmental Arches
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/15
Play
Full screen (f)
Deck 37: Construction of Semicircular and Segmental Arches
1
Any type of arch needs to have flashing and weep holes installed to prevent moisture from penetrating and staying in the wall.
True
2
The rule for segmental arch construction is that the minimum rise should always be _____ the width of the opening or span, if the arch is to be self supporting and not on a form.
A) equal to one-eighth
B) more than one-fourth
C) up to one-half
D) no more than one-sixteenth
A) equal to one-eighth
B) more than one-fourth
C) up to one-half
D) no more than one-sixteenth
A
3
For arches _____ long, a good construction grade of ¾" plywood is excellent for the front and back of the arch form.
A) up to 6'
B) more than 6'
C) between 5' and 10'
D) more than 10'
A) up to 6'
B) more than 6'
C) between 5' and 10'
D) more than 10'
A
4
For minor arches _____ is usually enough time for curing if the temperature is not freezing and the mortar is setting correctly.
A) 3 hours
B) 24 hours
C) 48 hours
D) 3 days
A) 3 hours
B) 24 hours
C) 48 hours
D) 3 days
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
5
The bottom mortar joint that is set on an arch form should be slightly angled inward because it must be cut out with a chisel to a depth of _____ after the arch form is removed and repointed.
A) 1"
B) ¾"
C) ½"
D) ¼"
A) 1"
B) ¾"
C) ½"
D) ¼"
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
6
The back of the arch should be parged.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
7
Construction of an arch is always begun at the two ends and laid up to the center of the arch.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
8
A bonded soldier course is a minimum of _____ in height.
A) 4" or a half brick
B) 8" or a whole brick
C) 12" or a brick and a half
D) 16" or two bricks
A) 4" or a half brick
B) 8" or a whole brick
C) 12" or a brick and a half
D) 16" or two bricks
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
9
A mason should not construct an arch form but rather find a carpenter to complete this task.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
10
The mortar joints on an arch should be large to give support to the arch.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
11
If a brick must be moved after the mortar in the arch has set, fresh mortar should be applied and the brick relaid.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
12
Rowlocks should not be used as a bonding arrangement for semicircular brick arches.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
13
Brick arches are for aesthetic purposes and should not be used to support a heavy load.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
14
Do not remove the arch forms until the arch has cured enough to carry its own weight without sagging.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck
15
Arch brick can be laid in several positions for semicircular arches.
Unlock Deck
Unlock for access to all 15 flashcards in this deck.
Unlock Deck
k this deck