Deck 13: Statistical Quality Control

Full screen (f)
exit full mode
Question
If the fraction defective is 0.12 based on a sample size of 16, the standard deviation used in the p-chart is about 0.08.
Use Space or
up arrow
down arrow
to flip the card.
Question
The p-chart is only useful for sampling that deals with continuous variables.
Question
Variation that is inherent in a production process itself is called assignable variation.
Question
It is impossible to have zero variability in production processes.
Question
An example of assignable variation in a production system may be that a machine is not adjusted properly.
Question
The value for "z" used in quality control charts is based on the degree of confidence you want to have in the resulting UCL and LCL values.
Question
A p-chart has upper and lower control limits expressed as lines on the chart.As long as the sample values fall between these two lines, there is no need to investigate process behavior.
Question
To obtain a 99.7 percent confidence level in a p-chart, we would use a value of 3 for "z".
Question
Attributes are those quality characteristics that are classified as either conforming or not conforming to specification.
Question
Measurement by attributes means taking a sample, measuring the attribute in question, and determining the level of quality in the population from which the sample was drawn.
Question
Variation in production systems that is caused by factors that can be clearly identified and possibly even managed is called assignable variation.
Question
Acceptance sampling is performed on goods that already exist to determine what percentage of items conforms to specifications.
Question
Genichi Taguchi's view of the cost of quality is that variance is a discontinuous function.
Question
In acceptance sampling, the number of units in the sample (n) is determined by the interaction of the acceptable quality level (AQL), the lot tolerance percent defective (LTPD), the probability of rejecting a high-quality lot (alpha), and the probability of accepting a low-quality lot (beta).
Question
The capability index is used to gauge economic changes in service systems.
Question
Variation that is inherent in a production process itself is called common variation.
Question
An example of assignable variation in a production system may be that workers are not identically trained.
Question
Process control is concerned with monitoring quality after the product or service has been produced.
Question
If the fraction defective is 0.4 based on a sample size of 100, the standard deviation used in the p-chart is about 0.10.
Question
Statistical process control involves testing random samples of output from a process to determine whether the process is producing items within a preselected range.
Question
In acceptance sampling, the value for the acceptance number (c) is determined by the interaction of the acceptable quality level (AQL), the lot tolerance percent defective (LTPD), the probability of rejecting a high-quality lot (alpha), and the probability of accepting a low-quality lot (beta).
Question
The probability associated with rejecting a high-quality lot is denoted in acceptance sampling with the Greek letter alpha.
Question
Total, 100 percent inspection can never be cost justified.
Question
Standard practice in statistical process control for variables is to set control limits so that 95 percent of the sample means will fall within the UCL and the LCL.
Question
Quality control charts usually have a central line and upper and lower control limit lines.Which of the following is not a reason that the process being monitored with the chart should be investigated?

A)A large number of plots are close to the upper or lower control lines.
B)The behaviorbehaviour of the plots is erratic.
C)A single plot falls above or below the control limits.
D)TheeThere is a change in raw materials or operators.
E)There is a run of five above the central line.
Question
Sampling plans are generally displayed graphically through the use of operating characteristic (OC) curves.
Question
AQL stands for accepting questionable lots in production quality management.
Question
Quality control charts usually have a central line and upper and lower control limit lines.Which of the following is a reason that the process being monitored with the chart should be investigated?

A)A single plot falls above or below the control limits.
B)Behavior is normal.
C)A large number of plots are on or near the central line.
D)There is no real trend in any direction.
E)There is a change in raw materials or operators.
Question
LTPD in acceptance sampling stands for lot tolerance for parts defective.
Question
In monitoring process quality, we might use which of the following statistics?

A)Absolute values
B)Percentage deviation from tolerance centers
C)"k" values for the sample mean
D)Logarithmic control intervals
E)Difference between the highest and lowest value in a sample
Question
The probability associated with accepting a low-quality lot is denoted in acceptance sampling with the Greek letter alpha.
Question
You have just used the capability index (Cpk) formulas to compute the two values "min [2, 2.5]." Which of the following is the proper interpretation of these numbers?

A)The true capability index value is 2.5.
B)The mean of the production process has shifted to the left of the design limits.
C)The mean of the production process has shifted to the right of the design limits.
D)The mean has not shifted at all.
E)The true capability index value is between 2 and 2.5.
Question
The capability index (Cpk) calculates the percentage of items being produced within specifications.
Question
In variables sampling, the actual measurements of the variable observed are used regardless of whether the unit is good or bad.
Question
The producer's risk associated with rejecting a high-quality lot is denoted in acceptance sampling with the Greek letter beta.
Question
You have just used the capability index (Cpk) formulas to compute the two values "min [1, 1]." Which of the following is the proper interpretation of these numbers?

A)The true capability index value is exactly 1.
B)The mean of the production process has shifted to the left of the design limits.
C)The mean of the production process has shifted to the right of the design limits.
D)The mean has not shifted at all.
E)None of these
Question
You have just used the capability index (Cpk) formulas to compute the two values "min [1.5, 1]." Which of the following is the interpretation of these numbers?

A)The true capability index value is 1.
B)The mean of the production process has shifted to the left of the design limits.
C)The mean of the production process has shifted to the right of the design limits.
D)The mean has not shifted at all.
E)The true capability index value is between 1.5 and 1.
Question
The Greek letter alpha is associated with consumer's risk.
Question
One hundred percent inspection is justified when the cost of inspection is low.
Question
The capability index (Cpk) indicates the position of the mean and tails of a process's variance relative to design specifications.
Question
Other things remaining the same, and assuming that is smaller than USL and larger than LSL, if the standard deviation (σ) of the process decreases, process capability index (Cpk) of the process will

A)Stay the same
B)Will always increase.
C)Will always decrease
D)Either B or C
E)Will sometimes increase
Question
You want to determine the control lines for a p-chart for quality control purposes.If the total number of defects from all samples is 2,500, the number of samples is 100, and the sample size is 50, which of the following would be the standard deviation used in developing the control lines?

A)0.4900
B)0.2499
C)0.1556
D)0.0707
E)0.02499
Question
You want to develop a three-sigma R-chart.You know the average range is 5 based on several samples of size 10.Which of the following is the resulting UCL?

A)20.9
B)8.9
C)7.02
D)5
E)3.1
Question
For which of the following should we use an R-chart to monitor process quality?

A)Weighing trucks at a highway inspection station to determine if they are overloaded
B)Deciding whether an airliner has sufficient fuel for its trip
C)Student grades measured from 1 to 100
D)Determining whether vehicles from a motor pool will run
E)Determining the accuracy of a forecast of "snow"
Question
You are going to develop an X-bar chart based on range statistics, and you are using a sample size of 12 for your charting purposes.Which of the following is the A2 factor for the X-bar chart?

A)0.37
B)0.31
C)0.27
D)0.22
E)0.18
Question
For which of the following should we use an X-bar chart based on sample means to monitor process quality?

A)Grades in a freshman "pass/fail" course
B)Tire pressures in an auto assembly plant
C)Vehicles passing emissions inspection
D)Computer software errors
E)Number of units with missing operations
Question
For which of the following should we use an R-chart to monitor process quality?

A)Grades in a freshman "pass/fail" course
B)Tire pressures in an auto assembly plant
C)Vehicles passing emissions inspection
D)Computer software errors
E)Number of units with missing operations
Question
You are going to develop an R-chart based on range statistics, and you are using a sample size of 15 for your charting purposes.Which of the following is the upper control limit D4 factor for the chart?

A)1.65
B)1.70
C)1.76
D)1.87
E)1.92
Question
For which of the following should we use a p-chart to monitor process quality?

A)Defective electrical switches
B)Errors in the length of a pencil
C)Weight errors in cans of soup
D)Temperature of entrees in a restaurant
E)Letter grades on a final examination
Question
You are developing an X-bar chart based on sample means.You know the standard deviation of the sample means is 4, the desired confidence level is 99.7 percent, and the average of the sample means is 24.Which of the following is your UCL?

A)36
B)24
C)12
D)4
E)None of these
Question
You are going to develop an R-chart based on range statistics, and you are using a sample size of 9 for your charting purposes.Which of the following is the lower control limit D3 factor for the chart?

A)0.08
B)0.14
C)0.18
D)0.22
E)0.29
Question
You want to determine the upper control line for a p-chart for quality control purposes.You take several samples of a size of 100 items in your production process.From the samples, you determine the fraction defective is 0.05 and the standard deviation is 0.01.If the desired confidence level is 99.7 percent, which of the following is the resulting UCL value for the line?

A)0.39
B)0.08
C)0.06
D)0.05
E)None of these
Question
You are developing an X-bar chart based on sample means.You know the standard deviation of the sample means is 4, the desired confidence level is 99 percent, and the average of the sample means is 20.Which of the following is your LCL?

A)36
B)24
C)9.68
D)16.79
E)30.32
Question
If there are 400 total defects from 8 samples, each sample consisting of 20 individual items in a production process, which of the following is the fraction defective that can be used in a p-chart for quality control purposes?

A)400
B)160
C)2.5
D)1.0
E)0.4
Question
You want to determine the lower control line for a p-chart for quality control purposes.You take several samples of a size of 50 items in your production process.From the samples, you determine the fraction defective is 0.006 and the standard deviation is 0.001.If the desired confidence level is 99.7 percent, which of the following is the resulting LCL value for the line?

A)0.0
B)0.002
C)0.003
D)0.004
E)None of these
Question
You want to develop a three-sigma R-chart.You know the average range is 12 based on several samples of size 6.Which of the following is the resulting LCL?

A)20.0
B)18.3
C)7.02
D)5.6
E)0.0
Question
For which of the following should we use a p-chart to monitor process quality?

A)The dimensions of brick entering a kiln
B)Lengths of boards cut in a mill
C)The weight of fluid in a container
D)Grades in a freshman "pass/fail" course
E)Temperatures in a classroom
Question
You want to determine the control lines for a p-chart for quality control purposes.If the desired confidence level is 99 percent, which of the following values for "z" would you use in computing the UCL and LCL?

A)0.99
B)2
C)2.58
D)3
E)None of these
Question
You want to determine the control lines for a p-chart for quality control purposes.If the total number of defects from all samples is 560, the number of samples is 70, and the sample size is 80, which of the following would be the standard deviation used in developing the control lines?

A)0.9000
B)0.4556
C)0.0335
D)0.0011
E)0.0112
Question
If there are 120 total defects from 10 samples, each sample consisting of 10 individual items in a production process, which of the following is the fraction defective that can be used in a p-chart for quality control purposes?

A)120
B)10
C)8
D)1.2
E)0.8
Question
Consider a sampling plan with n=40 and c=1 and given Acceptable quality level (AQL), Lot tolerance percent defective (LTPD), producer's risk (α) and consumer's risk (β).Suppose that c is increased to 2, keeping AQL and LTPD unchanged, producer's risk (α) will

A)Always decrease
B)Always increase
C)Sometime decrease
D)Stay the same.
E)None of the above.
Question
Consider a sampling plan with n=40 and c=1 and given Acceptable quality level (AQL), Lot tolerance percent defective (LTPD), producer's risk (α) and consumer's risk (β).Suppose that c is increased to 2, keeping AQL and LTPD unchanged, consumer's risk (β) will

A)Always decrease
B)Always increase
C)Sometime decrease
D)Stay the same.
E)None of the above.
Question
Comparing traditional view of the cost of variability and Taguchi's view of cost of variability,

A)Both views are about the same.
B)Traditional view holds that as long as the product is within specification, there is no difference.
C)Taguchi's view holds that closer to the midpoint of specifications better it is.
D)B and C are true.
E)None of the above.
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/63
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 13: Statistical Quality Control
1
If the fraction defective is 0.12 based on a sample size of 16, the standard deviation used in the p-chart is about 0.08.
True
2
The p-chart is only useful for sampling that deals with continuous variables.
False
3
Variation that is inherent in a production process itself is called assignable variation.
False
4
It is impossible to have zero variability in production processes.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
5
An example of assignable variation in a production system may be that a machine is not adjusted properly.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
6
The value for "z" used in quality control charts is based on the degree of confidence you want to have in the resulting UCL and LCL values.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
7
A p-chart has upper and lower control limits expressed as lines on the chart.As long as the sample values fall between these two lines, there is no need to investigate process behavior.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
8
To obtain a 99.7 percent confidence level in a p-chart, we would use a value of 3 for "z".
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
9
Attributes are those quality characteristics that are classified as either conforming or not conforming to specification.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
10
Measurement by attributes means taking a sample, measuring the attribute in question, and determining the level of quality in the population from which the sample was drawn.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
11
Variation in production systems that is caused by factors that can be clearly identified and possibly even managed is called assignable variation.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
12
Acceptance sampling is performed on goods that already exist to determine what percentage of items conforms to specifications.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
13
Genichi Taguchi's view of the cost of quality is that variance is a discontinuous function.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
14
In acceptance sampling, the number of units in the sample (n) is determined by the interaction of the acceptable quality level (AQL), the lot tolerance percent defective (LTPD), the probability of rejecting a high-quality lot (alpha), and the probability of accepting a low-quality lot (beta).
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
15
The capability index is used to gauge economic changes in service systems.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
16
Variation that is inherent in a production process itself is called common variation.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
17
An example of assignable variation in a production system may be that workers are not identically trained.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
18
Process control is concerned with monitoring quality after the product or service has been produced.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
19
If the fraction defective is 0.4 based on a sample size of 100, the standard deviation used in the p-chart is about 0.10.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
20
Statistical process control involves testing random samples of output from a process to determine whether the process is producing items within a preselected range.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
21
In acceptance sampling, the value for the acceptance number (c) is determined by the interaction of the acceptable quality level (AQL), the lot tolerance percent defective (LTPD), the probability of rejecting a high-quality lot (alpha), and the probability of accepting a low-quality lot (beta).
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
22
The probability associated with rejecting a high-quality lot is denoted in acceptance sampling with the Greek letter alpha.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
23
Total, 100 percent inspection can never be cost justified.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
24
Standard practice in statistical process control for variables is to set control limits so that 95 percent of the sample means will fall within the UCL and the LCL.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
25
Quality control charts usually have a central line and upper and lower control limit lines.Which of the following is not a reason that the process being monitored with the chart should be investigated?

A)A large number of plots are close to the upper or lower control lines.
B)The behaviorbehaviour of the plots is erratic.
C)A single plot falls above or below the control limits.
D)TheeThere is a change in raw materials or operators.
E)There is a run of five above the central line.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
26
Sampling plans are generally displayed graphically through the use of operating characteristic (OC) curves.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
27
AQL stands for accepting questionable lots in production quality management.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
28
Quality control charts usually have a central line and upper and lower control limit lines.Which of the following is a reason that the process being monitored with the chart should be investigated?

A)A single plot falls above or below the control limits.
B)Behavior is normal.
C)A large number of plots are on or near the central line.
D)There is no real trend in any direction.
E)There is a change in raw materials or operators.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
29
LTPD in acceptance sampling stands for lot tolerance for parts defective.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
30
In monitoring process quality, we might use which of the following statistics?

A)Absolute values
B)Percentage deviation from tolerance centers
C)"k" values for the sample mean
D)Logarithmic control intervals
E)Difference between the highest and lowest value in a sample
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
31
The probability associated with accepting a low-quality lot is denoted in acceptance sampling with the Greek letter alpha.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
32
You have just used the capability index (Cpk) formulas to compute the two values "min [2, 2.5]." Which of the following is the proper interpretation of these numbers?

A)The true capability index value is 2.5.
B)The mean of the production process has shifted to the left of the design limits.
C)The mean of the production process has shifted to the right of the design limits.
D)The mean has not shifted at all.
E)The true capability index value is between 2 and 2.5.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
33
The capability index (Cpk) calculates the percentage of items being produced within specifications.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
34
In variables sampling, the actual measurements of the variable observed are used regardless of whether the unit is good or bad.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
35
The producer's risk associated with rejecting a high-quality lot is denoted in acceptance sampling with the Greek letter beta.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
36
You have just used the capability index (Cpk) formulas to compute the two values "min [1, 1]." Which of the following is the proper interpretation of these numbers?

A)The true capability index value is exactly 1.
B)The mean of the production process has shifted to the left of the design limits.
C)The mean of the production process has shifted to the right of the design limits.
D)The mean has not shifted at all.
E)None of these
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
37
You have just used the capability index (Cpk) formulas to compute the two values "min [1.5, 1]." Which of the following is the interpretation of these numbers?

A)The true capability index value is 1.
B)The mean of the production process has shifted to the left of the design limits.
C)The mean of the production process has shifted to the right of the design limits.
D)The mean has not shifted at all.
E)The true capability index value is between 1.5 and 1.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
38
The Greek letter alpha is associated with consumer's risk.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
39
One hundred percent inspection is justified when the cost of inspection is low.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
40
The capability index (Cpk) indicates the position of the mean and tails of a process's variance relative to design specifications.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
41
Other things remaining the same, and assuming that is smaller than USL and larger than LSL, if the standard deviation (σ) of the process decreases, process capability index (Cpk) of the process will

A)Stay the same
B)Will always increase.
C)Will always decrease
D)Either B or C
E)Will sometimes increase
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
42
You want to determine the control lines for a p-chart for quality control purposes.If the total number of defects from all samples is 2,500, the number of samples is 100, and the sample size is 50, which of the following would be the standard deviation used in developing the control lines?

A)0.4900
B)0.2499
C)0.1556
D)0.0707
E)0.02499
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
43
You want to develop a three-sigma R-chart.You know the average range is 5 based on several samples of size 10.Which of the following is the resulting UCL?

A)20.9
B)8.9
C)7.02
D)5
E)3.1
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
44
For which of the following should we use an R-chart to monitor process quality?

A)Weighing trucks at a highway inspection station to determine if they are overloaded
B)Deciding whether an airliner has sufficient fuel for its trip
C)Student grades measured from 1 to 100
D)Determining whether vehicles from a motor pool will run
E)Determining the accuracy of a forecast of "snow"
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
45
You are going to develop an X-bar chart based on range statistics, and you are using a sample size of 12 for your charting purposes.Which of the following is the A2 factor for the X-bar chart?

A)0.37
B)0.31
C)0.27
D)0.22
E)0.18
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
46
For which of the following should we use an X-bar chart based on sample means to monitor process quality?

A)Grades in a freshman "pass/fail" course
B)Tire pressures in an auto assembly plant
C)Vehicles passing emissions inspection
D)Computer software errors
E)Number of units with missing operations
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
47
For which of the following should we use an R-chart to monitor process quality?

A)Grades in a freshman "pass/fail" course
B)Tire pressures in an auto assembly plant
C)Vehicles passing emissions inspection
D)Computer software errors
E)Number of units with missing operations
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
48
You are going to develop an R-chart based on range statistics, and you are using a sample size of 15 for your charting purposes.Which of the following is the upper control limit D4 factor for the chart?

A)1.65
B)1.70
C)1.76
D)1.87
E)1.92
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
49
For which of the following should we use a p-chart to monitor process quality?

A)Defective electrical switches
B)Errors in the length of a pencil
C)Weight errors in cans of soup
D)Temperature of entrees in a restaurant
E)Letter grades on a final examination
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
50
You are developing an X-bar chart based on sample means.You know the standard deviation of the sample means is 4, the desired confidence level is 99.7 percent, and the average of the sample means is 24.Which of the following is your UCL?

A)36
B)24
C)12
D)4
E)None of these
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
51
You are going to develop an R-chart based on range statistics, and you are using a sample size of 9 for your charting purposes.Which of the following is the lower control limit D3 factor for the chart?

A)0.08
B)0.14
C)0.18
D)0.22
E)0.29
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
52
You want to determine the upper control line for a p-chart for quality control purposes.You take several samples of a size of 100 items in your production process.From the samples, you determine the fraction defective is 0.05 and the standard deviation is 0.01.If the desired confidence level is 99.7 percent, which of the following is the resulting UCL value for the line?

A)0.39
B)0.08
C)0.06
D)0.05
E)None of these
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
53
You are developing an X-bar chart based on sample means.You know the standard deviation of the sample means is 4, the desired confidence level is 99 percent, and the average of the sample means is 20.Which of the following is your LCL?

A)36
B)24
C)9.68
D)16.79
E)30.32
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
54
If there are 400 total defects from 8 samples, each sample consisting of 20 individual items in a production process, which of the following is the fraction defective that can be used in a p-chart for quality control purposes?

A)400
B)160
C)2.5
D)1.0
E)0.4
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
55
You want to determine the lower control line for a p-chart for quality control purposes.You take several samples of a size of 50 items in your production process.From the samples, you determine the fraction defective is 0.006 and the standard deviation is 0.001.If the desired confidence level is 99.7 percent, which of the following is the resulting LCL value for the line?

A)0.0
B)0.002
C)0.003
D)0.004
E)None of these
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
56
You want to develop a three-sigma R-chart.You know the average range is 12 based on several samples of size 6.Which of the following is the resulting LCL?

A)20.0
B)18.3
C)7.02
D)5.6
E)0.0
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
57
For which of the following should we use a p-chart to monitor process quality?

A)The dimensions of brick entering a kiln
B)Lengths of boards cut in a mill
C)The weight of fluid in a container
D)Grades in a freshman "pass/fail" course
E)Temperatures in a classroom
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
58
You want to determine the control lines for a p-chart for quality control purposes.If the desired confidence level is 99 percent, which of the following values for "z" would you use in computing the UCL and LCL?

A)0.99
B)2
C)2.58
D)3
E)None of these
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
59
You want to determine the control lines for a p-chart for quality control purposes.If the total number of defects from all samples is 560, the number of samples is 70, and the sample size is 80, which of the following would be the standard deviation used in developing the control lines?

A)0.9000
B)0.4556
C)0.0335
D)0.0011
E)0.0112
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
60
If there are 120 total defects from 10 samples, each sample consisting of 10 individual items in a production process, which of the following is the fraction defective that can be used in a p-chart for quality control purposes?

A)120
B)10
C)8
D)1.2
E)0.8
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
61
Consider a sampling plan with n=40 and c=1 and given Acceptable quality level (AQL), Lot tolerance percent defective (LTPD), producer's risk (α) and consumer's risk (β).Suppose that c is increased to 2, keeping AQL and LTPD unchanged, producer's risk (α) will

A)Always decrease
B)Always increase
C)Sometime decrease
D)Stay the same.
E)None of the above.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
62
Consider a sampling plan with n=40 and c=1 and given Acceptable quality level (AQL), Lot tolerance percent defective (LTPD), producer's risk (α) and consumer's risk (β).Suppose that c is increased to 2, keeping AQL and LTPD unchanged, consumer's risk (β) will

A)Always decrease
B)Always increase
C)Sometime decrease
D)Stay the same.
E)None of the above.
Unlock Deck
Unlock for access to all 63 flashcards in this deck.
Unlock Deck
k this deck
63
Comparing traditional view of the cost of variability and Taguchi's view of cost of variability,

A)Both views are about the same.
B)Traditional view holds that as long as the product is within specification, there is no difference.
C)Taguchi's view holds that closer to the midpoint of specifications better it is.
D)B and C are true.
E)None of the above.