According to learning curve theory, for certain kinds of tasks the cost per unit decreases as the number of repetitions increases.
Use Space or
up arrow
down arrow
to flip the card.
Question
When the task is fairly complex and has a longer duration, it will take a larger number of repetitions before improvement is observed.
Question
Learning curves are used primarily for mass production applications.
Question
If the elapsed time for the task is short and the activity is somewhat routine, a modest amount of improvement occurs during the first few repetitions.
Question
According to learning curve theory, the time reduction per unit decreases (improves) as the number of units increases.
Question
The learning curve principle would apply to a baseball pitcher learning to throw a curveball.
Question
The learning curve principle would apply to the number of students in a class: a class twice as large will learn 80 percent faster.
Question
The decrease in time between the second and fourth units will be equal to the decrease in time between the first and second units.
Question
A learning percentage of 95 percent indicates greater learning than a percentage of 90 percent.
Question
An 80 percent learning curve means that with each doubling of repetitions there will be a 20 percent decrease in time per unit.
Question
If we have never made the first unit but only think we know how much the labor time will be, we cannot draw a learning curve.
Question
If an 80 percent curve is appropriate for a task and the first unit takes 10 hours, the average time for the first two units would be eight hours.
Question
Learning curves are mostly relevant for complex, new activities that have not been done often.
Question
A learning curve for an overqualified worker is higher than that for an average worker.
Question
The learning curve is a basic tool for mass production-type activities because it can deal with large volumes of output.
Question
According to learning curve theory, every doubling of total output will produce a constant percentage decrease in time per unit.
Question
Suppose the first unit of output required 800 labor hours, and the second required only 640. How many hours will be reduced from the second unit to the fourth?

A) 128
B) 256
C) 512
D) 486
E) 322
Question
Negotiated purchasing results in lower unit costs for smaller quantities.
Question
For an 80 percent learning curve, if the first unit requires 10 hours, the second unit will require 8 hours and the third 6.4 hours.
Question
Learning curves generally apply to situations in which there is a high degree of human involvement and tasks are fairly repetitive.
Question
Suppose the first unit of output required 900 labor hours, and the second unit required only 810. At this rate, how many more units must be produced before labor requirements are less than 700 hours?

A) 2
B) 4
C) 6
D) 8
E) 10
Question
Once production is underway and the learning curve effect is occurring, successive changes made to the production process will cause the time per unit to:

A) continue following the original learning curve without any impact.
B) cause a scallop effect.
C) increase the unit time and result in a higher percentage learning curve.
D) decrease the unit time and result in a higher percentage learning curve.
E) decrease the unit time and result in a lower percentage learning curve.
Question
The more __________ a task, the less likely it is that a substantial learning curve will be in effect.

A) strategic
B) capital intensive
C) routine
D) tactical
E) unusual
Question
Which of the following is not a major caution or criticism of learning curves?

A) Learning rates may differ between organizations.
B) Projections should be regarded as approximations.
C) The base time must be carefully determined.
D) The curve may eventually tip upwards.
E) Carryover effects may alter the learning rate.
Question
A job is expected to have a 70 percent learning curve. The first unit has been completed in 20 hours. Accordingly, the second unit can be expected to take approximately how many hours?

A) 6
B) 9.8
C) 14
D) 20
E) 34
Question
A job has an 80 percent learning curve. If the first unit took 40 hours to complete, the fourth unit should take roughly how many hours?

A) 20
B) 25
C) 31
D) 35
E) 40
Question
Which one of the following would learning curves probably affect the least?

A) pricing new products
B) negotiated purchasing
C) layout analysis
D) scheduling
E) capacity planning
Question
Increasing volumes result in ___________ the learning curve.

A) moving up
B) moving down
C) moving off
D) moving away from
E) stabilization of
Question
A job is expected to have a learning curve of 90 percent. The third unit required 16 hours. The 12th unit should take approximately how many hours?

A) 2.67
B) 4.83
C) 7.94
D) 10.31
E) 12.95
Question
In which of the following managerial activities would learning curves probably be the least useful?

A) negotiated purchasing
B) manpower planning
C) location analysis
D) budgeting
E) pricing new products
Question
It took exactly 10 hours to perform the first kidney transplant on a 100 percent learning curve. The second kidney transplant will take how many hours to perform?

A) 8 hours
B) 10 hours
C) 12 hours
D) A 100 percent learning curve cannot exist.
E) 5 hours
Question
The fact that human activities typically improve when they are done on a repetitive basis is described by a(n):

A) normal distribution curve.
B) learning curve.
C) binomial distribution curve.
D) exponential curve.
E) fatigue factor allowance.
Question
How long would a job with a 70 percent learning curve and a time of 20 hours for the first unit require (approximately, in hours) for the third unit?

A) 14.1
B) 11.4
C) 10.0
D) 7.8
E) 4.3
Question
A job has an 80 percent learning curve. The second unit required 12 hours to complete. Approximately how many hours will be devoted to the first five units (including those already completed)?

A) 26
B) 36
C) 46
D) 56
E) 66
Question
A manager is trying to estimate the appropriate learning curve for a certain job. The manager notes that the first four units had a total time of 30 minutes. Which learning curve would yield approximately this result if the first unit took 10 minutes?

A) .70
B) .75
C) .80
D) .85
E) .90
Question
On a log-log graph, learning curves appear as:

A) upward-curving lines.
B) downward-curving lines.
C) straight lines.
D) lines which increase at a decreasing rate.
E) lines which decrease at a decreasing rate.
Question
A job with a 70 percent learning curve required 20 hours for the initial unit. The fourth unit should require approximately how many hours?

A) 6
B) 9.8
C) 14
D) 20
E) 34
Question
Sometimes improvements in labor requirements are more apparent than real because of:

A) fixed costs increasing.
B) automation.
C) mass production.
D) increases in indirect labor.
E) greater precision in estimating the learning rate.
Question
To which worker would learning curves be most applicable?

A) bus driver
B) printing press operator
C) assembly-line worker
D) auto service mechanic
E) baker or cook
Question
A job has a 70 percent learning curve. If the first unit took 10 hours to complete, the third unit should take roughly how many hours?

A) 7
B) 5.7
C) 5
D) 3.5
E) 4.9
Question
A manager wants to analyze the learning curve associated with producing one of his company's products. Accordingly, he has gathered the following data:  UNIT PRODUCED  TIME REQUIRED  Second 5 hours  Fourth 4 hours \begin{array} { | l | l | } \hline \text { UNIT PRODUCED } &{ \text { TIME REQUIRED } } \\\hline \text { Second } & 5 \text { hours } \\\hline \text { Fourth } & 4 \text { hours } \\\hline\end{array} Approximately how long will it take to produce the fifth through tenth units?

A) 15 hours
B) 16 hours
C) 18 hours
D) 20 hours
E) 21 hours
Question
A company is preparing a bid on a government contract for 40 units of a certain product. The operations manager estimates the assembly time required for the first two units to be 10.4 hours and 8.8 hours. Approximately how long will it take to produce the 25th through 30th units?

A) 23 hours
B) 49 hours
C) 29 hours
D) 38 hours
E) It is impossible to say without additional information.
Question
Unit times for a job exhibit a learning effect. If the second unit took 30 hours, and the fourth unit took 21 hours, roughly how many hours would you estimate the third unit took?

A) 29
B) 27
C) 25
D) 24
E) 21
Question
A manager wants to analyze the learning curve associated with producing one of his company's products. Accordingly, he has gathered the following data:  UNIT PRODUCED  TIME REQUIRED  Second 5 hours  Fourth 4 hours \begin{array} { | l | l | } \hline \text { UNIT PRODUCED } & { \text { TIME REQUIRED } } \\\hline \text { Second } & 5 \text { hours } \\\hline \text { Fourth } & 4 \text { hours } \\\hline\end{array} Approximately how long did it take to produce the first four units?

A) 15 hours
B) 16 hours
C) 18 hours
D) 20 hours
E) 21 hours
Question
A job will have a learning rate of 75 percent. If the third unit requires 10 hours, the 12th unit should require about this many hours:

A) 5.6.
B) 6.5.
C) 7.4.
D) 8.3.
E) 9.2.
Question
A company is preparing a bid on a government contract for 40 units of a certain product. The operations manager estimates the assembly time required for the first two units to be 10.4 hours and 8.8 hours. Approximately how long will it take to produce the 15th unit?

A) 4.3 hours
B) 5.5 hours
C) 4.7 hours
D) 6.9 hours
E) 3.4 hours
Question
A manager wants to analyze the learning curve associated with producing one of his company's products. Accordingly, he has gathered the following data:  UNIT PRODUCED  TIME REQUIRED  Second 5 hours  Fourth 4 hours \begin{array} { | l | l | } \hline \text { UNIT PRODUCED } & { \text { TIME REQUIRED } } \\\hline \text { Second } & 5 \text { hours } \\\hline \text { Fourth } & 4 \text { hours } \\\hline\end{array} What is the learning curve percentage?

A) 40 percent
B) 50 percent
C) 75 percent
D) 80 percent
E) 90 percent
Question
When are learning curves most relevant to managerial decision making in mass production settings?

A) late in product life cycles
B) in the maturity phase
C) in the decline phase
D) before processes are stabilized
E) never
Question
A company is preparing a bid on a government contract for 40 units of a certain product. The operations manager estimates the assembly time required for the first two units to be 10.4 hours and 8.8 hours. What is the expected time required to produce the 40th unit?

A) 3.2 hours
B) 4.4 hours
C) 5.9 hours
D) 3.7 hours
E) 2.2 hours
Question
A company is preparing a bid on a government contract for 40 units of a certain product. The operations manager estimates the assembly time required for the first two units to be 10.4 hours and 8.8 hours respectively. What is the appropriate learning curve?

A) 70 percent
B) 75 percent
C) 80 percent
D) 85 percent
E) 90 percent
Question
Which of the following is an example of a carryover effect?

A) capacity that was used on older products but that can be used on new products
B) previous experience that is relevant to the current scenario
C) existing products that are still in the maturity phase of their life cycle
D) forecasting errors from previous product lines
E) old supplier contracts that must still be honored
Question
To which of the following challenges are learning curves important considerations?

A) capacity planning
B) product designs
C) process layouts
D) output-based compensation
E) demand forecasting
Question
A manager is trying to estimate the learning rate for a new job. The first unit took 16 hours and the fourth unit required about 13 hours. The learning rate is:

A) 70 percent.
B) 75 percent.
C) 80 percent.
D) 85 percent.
E) 90 percent.
Question
A manager wants to analyze the learning curve associated with producing one of his company's products. Accordingly, he has gathered the following data:  UNIT PRODUCED  TIME REQUIRED  Second 5 hours  Fourth 4 hours \begin{array} { | l | l | } \hline \text { UNIT PRODUCED } &{ \text { TIME REQUIRED } } \\\hline \text { Second } & 5 \text { hours } \\\hline \text { Fourth } & 4 \text { hours } \\\hline\end{array} How long did it take to produce the first unit?

A) 5 hours
B) 6 hours
C) 6.25 hours
D) 6.33 hours
E) 6.5 hours
Question
In which of the following scenarios would an 80 percent learning curve be especially relevant?

A) the pursuit of an innovation strategy to stay ahead of competitors
B) the pursuit of a flexibility-based strategy to increase customer satisfaction
C) the pursuit of a customization-based strategy to command premium prices
D) the pursuit of a time-based strategy to gain market share
E) the pursuit of a quality-based strategy to gain customer loyalty
Question
A company is preparing a bid on a government contract for 40 units of a certain product. The operations manager estimates the assembly time required for the first two units to be 10.4 hours and 8.8 hours. Which unit, if any, will require approximately one-half the time of the first unit?

A) 18th unit
B) 19th unit
C) 20th unit
D) 21st unit
E) 22nd unit
Question
A job has an 80 percent learning curve. If the first unit took 50 hours to complete, the third unit should take roughly how many hours?

A) 40
B) 36
C) 35
D) 32
E) 10
Question
A manager wants to analyze the learning curve associated with producing one of his company's products. Accordingly, he has gathered the following data:  UNIT PRODUCED  TIME REQUIRED  Second 5 hours  Fourth 4 hours \begin{array} { | l | l | } \hline \text { UNIT PRODUCED } & { \text { TIME REQUIRED } } \\\hline \text { Second } & 5 \text { hours } \\\hline \text { Fourth } & 4 \text { hours } \\\hline\end{array} Approximately how long will it take to produce the 10th unit?

A) 1 hour
B) 2 hours
C) 3 hours
D) 4 hours
E) 5 hours
Question
A company is preparing a bid on a government contract for 40 units of a certain product. The operations manager estimates the assembly time required for the first two units to be 10.4 hours and 8.8 hours. What is the average time per unit for the first 30 units?

A) 4.7 hours
B) 5.9 hours
C) 5.6 hours
D) 4.5 hours
E) 3.6 hours
Question
A company is preparing a bid on a government contract for 40 units of a certain product. The operations manager estimates the assembly time required for the first two units to be 10.4 hours and 8.8 hours. If a contract for 30 units is canceled after the first 20 units, approximately how much of the expected total direct labor will have been expended to that point?

A) 73 percent
B) 55 percent
C) 61 percent
D) 50 percent
E) It is impossible to say without additional information.
Question
Ron has noted that the first accounting problem he did in a set of similar problems took him one hour, and the ninth problem took 24 minutes.
(A) Estimate Ron's learning curve.
(B) About how long did it take Ron to do his set of 10 problems?
Question
The third unit of a 10-unit job required 7.3 hours to complete. The fourth unit has been worked on for two hours, but it is not yet finished. Estimate the remaining amount of time that will be needed to finish this 10-unit job if the work has an 80 percent learning curve.
Question
Assembly of a model airplane has a learning curve of 80 percent. The estimated time to assemble a second identical model airplane is 40 hours. Determine approximately how much time will be required for:
(A) the eighth unit.
(B) the first 10 units.
Question
Sally suspects strongly that there is a learning curve associated with solving problems assigned for operations management. She notes that it took her approximately 33 minutes to solve the first problem and 17 minutes to solve the fifth problem.
(A) Estimate Sally's learning percentage.
(B) Using your answer from part A, estimate how long it will take Sally to finish the three remaining problems.
Question
Developing work assignments in a job shop in a certain firm has a learning curve of 80 percent. If the second set of assignments takes 12 minutes, determine the length of time required for the following:
(A) the fifth set.
(B) sets 3, 4, and 5 together.
Question
It takes a worker with a 90 percent learning curve 72.9 minutes to complete the fourth unit of a seven-unit job. Estimate the amount of time the worker spent on the first two units.
Question
Suppose the first unit required 800 hours and the second unit required only 680. Which of the following times for the fourth unit would be consistent with a true learning curve scenario?

A) 492
B) 587
C) 578
D) 603
E) 583
Question
An order we just received has a 90 percent learning curve associated with it. The second unit of the total 25-unit order had a unit time of 36 minutes. What will the total time be for the entire order (all 25 units)?
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/68
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 7: Extension: Learning Curves
1
According to learning curve theory, for certain kinds of tasks the cost per unit decreases as the number of repetitions increases.
False
2
When the task is fairly complex and has a longer duration, it will take a larger number of repetitions before improvement is observed.
True
3
Learning curves are used primarily for mass production applications.
False
4
If the elapsed time for the task is short and the activity is somewhat routine, a modest amount of improvement occurs during the first few repetitions.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
5
According to learning curve theory, the time reduction per unit decreases (improves) as the number of units increases.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
6
The learning curve principle would apply to a baseball pitcher learning to throw a curveball.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
7
The learning curve principle would apply to the number of students in a class: a class twice as large will learn 80 percent faster.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
8
The decrease in time between the second and fourth units will be equal to the decrease in time between the first and second units.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
9
A learning percentage of 95 percent indicates greater learning than a percentage of 90 percent.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
10
An 80 percent learning curve means that with each doubling of repetitions there will be a 20 percent decrease in time per unit.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
11
If we have never made the first unit but only think we know how much the labor time will be, we cannot draw a learning curve.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
12
If an 80 percent curve is appropriate for a task and the first unit takes 10 hours, the average time for the first two units would be eight hours.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
13
Learning curves are mostly relevant for complex, new activities that have not been done often.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
14
A learning curve for an overqualified worker is higher than that for an average worker.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
15
The learning curve is a basic tool for mass production-type activities because it can deal with large volumes of output.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
16
According to learning curve theory, every doubling of total output will produce a constant percentage decrease in time per unit.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
17
Suppose the first unit of output required 800 labor hours, and the second required only 640. How many hours will be reduced from the second unit to the fourth?

A) 128
B) 256
C) 512
D) 486
E) 322
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
18
Negotiated purchasing results in lower unit costs for smaller quantities.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
19
For an 80 percent learning curve, if the first unit requires 10 hours, the second unit will require 8 hours and the third 6.4 hours.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
20
Learning curves generally apply to situations in which there is a high degree of human involvement and tasks are fairly repetitive.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
21
Suppose the first unit of output required 900 labor hours, and the second unit required only 810. At this rate, how many more units must be produced before labor requirements are less than 700 hours?

A) 2
B) 4
C) 6
D) 8
E) 10
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
22
Once production is underway and the learning curve effect is occurring, successive changes made to the production process will cause the time per unit to:

A) continue following the original learning curve without any impact.
B) cause a scallop effect.
C) increase the unit time and result in a higher percentage learning curve.
D) decrease the unit time and result in a higher percentage learning curve.
E) decrease the unit time and result in a lower percentage learning curve.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
23
The more __________ a task, the less likely it is that a substantial learning curve will be in effect.

A) strategic
B) capital intensive
C) routine
D) tactical
E) unusual
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
24
Which of the following is not a major caution or criticism of learning curves?

A) Learning rates may differ between organizations.
B) Projections should be regarded as approximations.
C) The base time must be carefully determined.
D) The curve may eventually tip upwards.
E) Carryover effects may alter the learning rate.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
25
A job is expected to have a 70 percent learning curve. The first unit has been completed in 20 hours. Accordingly, the second unit can be expected to take approximately how many hours?

A) 6
B) 9.8
C) 14
D) 20
E) 34
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
26
A job has an 80 percent learning curve. If the first unit took 40 hours to complete, the fourth unit should take roughly how many hours?

A) 20
B) 25
C) 31
D) 35
E) 40
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
27
Which one of the following would learning curves probably affect the least?

A) pricing new products
B) negotiated purchasing
C) layout analysis
D) scheduling
E) capacity planning
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
28
Increasing volumes result in ___________ the learning curve.

A) moving up
B) moving down
C) moving off
D) moving away from
E) stabilization of
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
29
A job is expected to have a learning curve of 90 percent. The third unit required 16 hours. The 12th unit should take approximately how many hours?

A) 2.67
B) 4.83
C) 7.94
D) 10.31
E) 12.95
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
30
In which of the following managerial activities would learning curves probably be the least useful?

A) negotiated purchasing
B) manpower planning
C) location analysis
D) budgeting
E) pricing new products
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
31
It took exactly 10 hours to perform the first kidney transplant on a 100 percent learning curve. The second kidney transplant will take how many hours to perform?

A) 8 hours
B) 10 hours
C) 12 hours
D) A 100 percent learning curve cannot exist.
E) 5 hours
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
32
The fact that human activities typically improve when they are done on a repetitive basis is described by a(n):

A) normal distribution curve.
B) learning curve.
C) binomial distribution curve.
D) exponential curve.
E) fatigue factor allowance.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
33
How long would a job with a 70 percent learning curve and a time of 20 hours for the first unit require (approximately, in hours) for the third unit?

A) 14.1
B) 11.4
C) 10.0
D) 7.8
E) 4.3
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
34
A job has an 80 percent learning curve. The second unit required 12 hours to complete. Approximately how many hours will be devoted to the first five units (including those already completed)?

A) 26
B) 36
C) 46
D) 56
E) 66
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
35
A manager is trying to estimate the appropriate learning curve for a certain job. The manager notes that the first four units had a total time of 30 minutes. Which learning curve would yield approximately this result if the first unit took 10 minutes?

A) .70
B) .75
C) .80
D) .85
E) .90
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
36
On a log-log graph, learning curves appear as:

A) upward-curving lines.
B) downward-curving lines.
C) straight lines.
D) lines which increase at a decreasing rate.
E) lines which decrease at a decreasing rate.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
37
A job with a 70 percent learning curve required 20 hours for the initial unit. The fourth unit should require approximately how many hours?

A) 6
B) 9.8
C) 14
D) 20
E) 34
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
38
Sometimes improvements in labor requirements are more apparent than real because of:

A) fixed costs increasing.
B) automation.
C) mass production.
D) increases in indirect labor.
E) greater precision in estimating the learning rate.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
39
To which worker would learning curves be most applicable?

A) bus driver
B) printing press operator
C) assembly-line worker
D) auto service mechanic
E) baker or cook
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
40
A job has a 70 percent learning curve. If the first unit took 10 hours to complete, the third unit should take roughly how many hours?

A) 7
B) 5.7
C) 5
D) 3.5
E) 4.9
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
41
A manager wants to analyze the learning curve associated with producing one of his company's products. Accordingly, he has gathered the following data:  UNIT PRODUCED  TIME REQUIRED  Second 5 hours  Fourth 4 hours \begin{array} { | l | l | } \hline \text { UNIT PRODUCED } &{ \text { TIME REQUIRED } } \\\hline \text { Second } & 5 \text { hours } \\\hline \text { Fourth } & 4 \text { hours } \\\hline\end{array} Approximately how long will it take to produce the fifth through tenth units?

A) 15 hours
B) 16 hours
C) 18 hours
D) 20 hours
E) 21 hours
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
42
A company is preparing a bid on a government contract for 40 units of a certain product. The operations manager estimates the assembly time required for the first two units to be 10.4 hours and 8.8 hours. Approximately how long will it take to produce the 25th through 30th units?

A) 23 hours
B) 49 hours
C) 29 hours
D) 38 hours
E) It is impossible to say without additional information.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
43
Unit times for a job exhibit a learning effect. If the second unit took 30 hours, and the fourth unit took 21 hours, roughly how many hours would you estimate the third unit took?

A) 29
B) 27
C) 25
D) 24
E) 21
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
44
A manager wants to analyze the learning curve associated with producing one of his company's products. Accordingly, he has gathered the following data:  UNIT PRODUCED  TIME REQUIRED  Second 5 hours  Fourth 4 hours \begin{array} { | l | l | } \hline \text { UNIT PRODUCED } & { \text { TIME REQUIRED } } \\\hline \text { Second } & 5 \text { hours } \\\hline \text { Fourth } & 4 \text { hours } \\\hline\end{array} Approximately how long did it take to produce the first four units?

A) 15 hours
B) 16 hours
C) 18 hours
D) 20 hours
E) 21 hours
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
45
A job will have a learning rate of 75 percent. If the third unit requires 10 hours, the 12th unit should require about this many hours:

A) 5.6.
B) 6.5.
C) 7.4.
D) 8.3.
E) 9.2.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
46
A company is preparing a bid on a government contract for 40 units of a certain product. The operations manager estimates the assembly time required for the first two units to be 10.4 hours and 8.8 hours. Approximately how long will it take to produce the 15th unit?

A) 4.3 hours
B) 5.5 hours
C) 4.7 hours
D) 6.9 hours
E) 3.4 hours
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
47
A manager wants to analyze the learning curve associated with producing one of his company's products. Accordingly, he has gathered the following data:  UNIT PRODUCED  TIME REQUIRED  Second 5 hours  Fourth 4 hours \begin{array} { | l | l | } \hline \text { UNIT PRODUCED } & { \text { TIME REQUIRED } } \\\hline \text { Second } & 5 \text { hours } \\\hline \text { Fourth } & 4 \text { hours } \\\hline\end{array} What is the learning curve percentage?

A) 40 percent
B) 50 percent
C) 75 percent
D) 80 percent
E) 90 percent
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
48
When are learning curves most relevant to managerial decision making in mass production settings?

A) late in product life cycles
B) in the maturity phase
C) in the decline phase
D) before processes are stabilized
E) never
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
49
A company is preparing a bid on a government contract for 40 units of a certain product. The operations manager estimates the assembly time required for the first two units to be 10.4 hours and 8.8 hours. What is the expected time required to produce the 40th unit?

A) 3.2 hours
B) 4.4 hours
C) 5.9 hours
D) 3.7 hours
E) 2.2 hours
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
50
A company is preparing a bid on a government contract for 40 units of a certain product. The operations manager estimates the assembly time required for the first two units to be 10.4 hours and 8.8 hours respectively. What is the appropriate learning curve?

A) 70 percent
B) 75 percent
C) 80 percent
D) 85 percent
E) 90 percent
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
51
Which of the following is an example of a carryover effect?

A) capacity that was used on older products but that can be used on new products
B) previous experience that is relevant to the current scenario
C) existing products that are still in the maturity phase of their life cycle
D) forecasting errors from previous product lines
E) old supplier contracts that must still be honored
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
52
To which of the following challenges are learning curves important considerations?

A) capacity planning
B) product designs
C) process layouts
D) output-based compensation
E) demand forecasting
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
53
A manager is trying to estimate the learning rate for a new job. The first unit took 16 hours and the fourth unit required about 13 hours. The learning rate is:

A) 70 percent.
B) 75 percent.
C) 80 percent.
D) 85 percent.
E) 90 percent.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
54
A manager wants to analyze the learning curve associated with producing one of his company's products. Accordingly, he has gathered the following data:  UNIT PRODUCED  TIME REQUIRED  Second 5 hours  Fourth 4 hours \begin{array} { | l | l | } \hline \text { UNIT PRODUCED } &{ \text { TIME REQUIRED } } \\\hline \text { Second } & 5 \text { hours } \\\hline \text { Fourth } & 4 \text { hours } \\\hline\end{array} How long did it take to produce the first unit?

A) 5 hours
B) 6 hours
C) 6.25 hours
D) 6.33 hours
E) 6.5 hours
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
55
In which of the following scenarios would an 80 percent learning curve be especially relevant?

A) the pursuit of an innovation strategy to stay ahead of competitors
B) the pursuit of a flexibility-based strategy to increase customer satisfaction
C) the pursuit of a customization-based strategy to command premium prices
D) the pursuit of a time-based strategy to gain market share
E) the pursuit of a quality-based strategy to gain customer loyalty
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
56
A company is preparing a bid on a government contract for 40 units of a certain product. The operations manager estimates the assembly time required for the first two units to be 10.4 hours and 8.8 hours. Which unit, if any, will require approximately one-half the time of the first unit?

A) 18th unit
B) 19th unit
C) 20th unit
D) 21st unit
E) 22nd unit
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
57
A job has an 80 percent learning curve. If the first unit took 50 hours to complete, the third unit should take roughly how many hours?

A) 40
B) 36
C) 35
D) 32
E) 10
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
58
A manager wants to analyze the learning curve associated with producing one of his company's products. Accordingly, he has gathered the following data:  UNIT PRODUCED  TIME REQUIRED  Second 5 hours  Fourth 4 hours \begin{array} { | l | l | } \hline \text { UNIT PRODUCED } & { \text { TIME REQUIRED } } \\\hline \text { Second } & 5 \text { hours } \\\hline \text { Fourth } & 4 \text { hours } \\\hline\end{array} Approximately how long will it take to produce the 10th unit?

A) 1 hour
B) 2 hours
C) 3 hours
D) 4 hours
E) 5 hours
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
59
A company is preparing a bid on a government contract for 40 units of a certain product. The operations manager estimates the assembly time required for the first two units to be 10.4 hours and 8.8 hours. What is the average time per unit for the first 30 units?

A) 4.7 hours
B) 5.9 hours
C) 5.6 hours
D) 4.5 hours
E) 3.6 hours
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
60
A company is preparing a bid on a government contract for 40 units of a certain product. The operations manager estimates the assembly time required for the first two units to be 10.4 hours and 8.8 hours. If a contract for 30 units is canceled after the first 20 units, approximately how much of the expected total direct labor will have been expended to that point?

A) 73 percent
B) 55 percent
C) 61 percent
D) 50 percent
E) It is impossible to say without additional information.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
61
Ron has noted that the first accounting problem he did in a set of similar problems took him one hour, and the ninth problem took 24 minutes.
(A) Estimate Ron's learning curve.
(B) About how long did it take Ron to do his set of 10 problems?
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
62
The third unit of a 10-unit job required 7.3 hours to complete. The fourth unit has been worked on for two hours, but it is not yet finished. Estimate the remaining amount of time that will be needed to finish this 10-unit job if the work has an 80 percent learning curve.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
63
Assembly of a model airplane has a learning curve of 80 percent. The estimated time to assemble a second identical model airplane is 40 hours. Determine approximately how much time will be required for:
(A) the eighth unit.
(B) the first 10 units.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
64
Sally suspects strongly that there is a learning curve associated with solving problems assigned for operations management. She notes that it took her approximately 33 minutes to solve the first problem and 17 minutes to solve the fifth problem.
(A) Estimate Sally's learning percentage.
(B) Using your answer from part A, estimate how long it will take Sally to finish the three remaining problems.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
65
Developing work assignments in a job shop in a certain firm has a learning curve of 80 percent. If the second set of assignments takes 12 minutes, determine the length of time required for the following:
(A) the fifth set.
(B) sets 3, 4, and 5 together.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
66
It takes a worker with a 90 percent learning curve 72.9 minutes to complete the fourth unit of a seven-unit job. Estimate the amount of time the worker spent on the first two units.
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
67
Suppose the first unit required 800 hours and the second unit required only 680. Which of the following times for the fourth unit would be consistent with a true learning curve scenario?

A) 492
B) 587
C) 578
D) 603
E) 583
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
68
An order we just received has a 90 percent learning curve associated with it. The second unit of the total 25-unit order had a unit time of 36 minutes. What will the total time be for the entire order (all 25 units)?
Unlock Deck
Unlock for access to all 68 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 68 flashcards in this deck.