Deck 18: Introduction to Systems Development and Systems Analysis

Full screen (f)
exit full mode
Question
An antiquated information system used by an office supply manufacturer caused customer dissatisfaction since it took two days to process a telephone order.After the system was upgraded and redesigned,the time to process a telephone order was reduced to three minutes.This is a prime example of

A)a competitive advantage.
B)a technological change.
C)an improved business process.
D)growth.
Use Space or
up arrow
down arrow
to flip the card.
Question
One step in the systems development life cycle (SDLC)identifies and evaluates design alternatives and to develop design specifications.This step is called

A)conceptual design.
B)implementation and conversion.
C)physical design.
D)systems analysis.
Question
In which phase of the systems development life cycle are the new hardware and software for a system tested?

A)conceptual design
B)implementation and conversion
C)operations and maintenance
D)physical design
Question
Whether systems changes are major or minor,most companies go through a system development life cycle.How many steps are there in this cycle?

A)2
B)3
C)4
D)5
Question
Who is responsible for preparing the specifications that are used to create the programs?

A)management
B)programmers
C)systems analysts
D)the information systems steering committee
Question
Which of the following activities is performed during the systems development life cycle?

A)assessing the ongoing feasibility of the project
B)managing the behavioral reactions to change
C)planning
D)All of the above activities are performed during the life cycle.
Question
What is the basic building block of information systems planning?

A)the master plan
B)the project development plan
C)systems analysis
D)adaptability
Question
Which group of individuals listed below can be the most effective in generating employee support and encouraging the development and acceptance of an AIS project?

A)accountants
B)information systems steering committee
C)management
D)project development team
Question
What is the role of the information systems steering committee?

A)It is a team of systems specialists,managers,accountants,and auditors that guides project development.
B)Since AIS development spans functional and divisional boundaries,an executive-level group is established to plan and oversee the IS function.
C)The group takes an active role in designing system controls and periodically monitoring and testing the system to verify the controls are implemented and functioning properly.
D)None of the descriptions above are appropriate.
Question
What is the planning horizon for the master plan?

A)one year
B)three years
C)five years
D)seven years
Question
In which phase of the systems development life cycle are the broad needs of the users converted into detailed specifics that are coded and tested?

A)conceptual design
B)implementation and conversion
C)physical design
D)systems analysis
Question
Which group of professionals is responsible for planning and monitoring a project to ensure timely and cost-effective completion?

A)information systems steering committee
B)management
C)project development team
D)system analysts
Question
What is the correct sequence of the phases in the systems development life cycle?

A)conceptual design,physical design,system analysis,implementation and conversion,and operations and maintenance
B)conceptual design,system analysis,physical design,implementation and conversion
C)system analysis,conceptual design,physical design,implementation and conversion,and operations and maintenance
D)system analysis,physical design,conceptual design,and operations and maintenance
Question
In which step of the SDLC do all of the elements of the system come together?

A)conceptual design
B)implementation and conversion
C)physical design
D)systems analysis
Question
In which plan is the prioritized list of projects contained?

A)project development plan
B)scheduled project plan
C)the master plan
D)all of the above
Question
Which group listed below has responsibility for ensuring that the new AIS will meet the needs of users?

A)accountants
B)the information system steering committee
C)the project development team
D)the system analysts and programmers
Question
Organizations continually face the need for new,faster,and more reliable ways of obtaining information.One reason why companies change their systems is to increase quality,quantity,and the speed with which information can be accessed and processed.Such an improvement may result in an improved product or service and may help lower costs.This change is referred to as a(n)

A)competitive advantage
B)improved business process
C)productivity gain
D)technological change
Question
A planning horizon of at least __________ years is reasonable for any master plan; however,the plan should be updated at least __________ each year.

A)3; twice
B)5; twice
C)7; once
D)5; once
Question
__________ requires that all activities and the precedent and subsequent relationships among them be identified.

A)CASE
B)The Gantt chart
C)The PERT diagram
D)The SDLC cycle
Question
All of the following are benefits of planning and managing systems development with the exception of

A)controlling costs
B)ensuring that the system is consistent with the organization's goals.
C)guaranteeing use of the system
D)helping keep the organization abreast of technological change
Question
There are several important aspects to be considered during a feasibility study.The aspect that asks the question,"Can people use the system and will they use it?" is called

A)economic feasibility.
B)operational feasibility.
C)scheduling feasibility.
D)technical feasibility.
Question
A good rule to follow is "Avoid complex systems that cause radical changes." What expression is used to describe this system design rule?

A)humanize the system
B)keep the system simple
C)present the system in its proper context
D)test the system's integrity
Question
A federal law demands that certain information about foreign customers should be maintained in the information system.In which part of a feasibility study should this requirement be considered?

A)economic feasibility
B)legal feasibility
C)operational feasibility
D)technical feasibility
Question
During what step in systems analysis is an examination made of each development activity to define the problem to be solved?

A)information needs and systems requirements
B)the feasibility study
C)the initial investigation
D)the systems survey
Question
It is appropriate to develop several different design approaches to meeting system requirements for a project.Capital budgeting techniques are used to evaluate the economic merits of each alternative.The technique where estimated future cash flows are discounted back to the present is referred to as

A)the future value method.
B)the internal rate of return.
C)the net present value method.
D)the payback method.
Question
What is another name for a feasibility study?

A)a business case
B)a Gantt chart
C)an executive summary
D)PERT
Question
Which of the following parts of a feasibility study is generally considered the most important and is frequently re-analyzed?

A)economic feasibility
B)operational feasibility
C)scheduling feasibility
D)technical feasibility
Question
When using the payback method to determine economic feasibility of projects,the company usually accepts the project with the

A)longest payback period.
B)mid-range payback period.
C)payback period that is equal to the project's economic life.
D)shortest payback period.
Question
What is most difficult item to quantify when assessing economic feasibility?

A)benefits
B)costs
C)Costs,benefits,and the payback period are all of equal difficulty.
D)the payback period
Question
The type of resistance in which data are erroneously entered into a system is called

A)acceptance.
B)aggression.
C)avoidance.
D)projection.
Question
A network of arrows and nodes representing project activities that require an expenditure of time and resources and the completion of initiation of activities,respectively,is called

A)a Gantt chart.
B)a PERT diagram.
C)a SDLC cycle.
D)CASE.
Question
The question of economic feasibility is important when designing and implementing a new system.Accountants can contribute to feasibility study analysis by evaluating cost savings and other benefits versus operating costs and other cash outflows.This is better known as

A)the "best guess" model of benefit analysis.
B)the "value added" benefit model.
C)the capital budgeting model.
D)the estimated benefits model.
Question
To minimize adverse behavioral reactions,the organization must first understand why resistance to change occurs.One behavioral problem occurs when there is insufficient explanation of why a change must take place.In order to curtail this resistance from occurring within the organization,what guideline should be implemented and followed?

A)attempt to meet the users' needs
B)avoid emotionalism
C)keep communication lines open
D)keep the system simple
Question
Major resistance to change takes one of several forms.What is the name of the form of resistance where the new system is blamed for any and every unpleasant occurrence?

A)aggression
B)avoidance
C)procrastination
D)projection
Question
What is the basic model used to create a framework for economic feasibility analysis?

A)the capital budgeting model
B)the cash budgeting model
C)the cost/benefit model
D)All of the above models are used to create a framework.
Question
Continuing to use a manual system instead of the new AIS is a form of resistance known as

A)acceptance.
B)aggression.
C)avoidance.
D)projection.
Question
Which planning technique does not show the relationships among various activities?

A)Gantt chart
B)PERT
C)the critical path method
D)VAN
Question
Systems development planning is an important step in the SDLC for a number of reasons.When management is better prepared for future resource needs and employees are better prepared for the changes that will occur,it can be said that the systems development planning has

A)adaptability.
B)attained lower costs.
C)consistency.
D)reached a level of efficiency.
Question
In which phase of the systems development life cycle is the feasibility study first performed?

A)conceptual design
B)implementation and conversion
C)physical design
D)system analysis
Question
To minimize adverse behavioral reactions,the organization must first understand why resistance to change occurs.One behavioral problem occurs when there is insufficient explanation of why a change must take place.This type of problem falls into the general category of

A)communication.
B)natural resistance to change.
C)the manner in which the change is introduced.
D)top management support of change.
Question
How frequently should an AIS be monitored and any minor modifications be made to it?

A)annually
B)continuously
C)when technology changes
D)when the competition changes its systems
Question
Which method of data gathering is most likely to result in information that represents the personal biases and opinions of the person giving the information?

A)a questionnaire
B)an interview
C)observation by the analyst
D)system documentation
Question
Which group is responsible for preparing a systems analysis report?

A)computer analysts
B)management
C)the project development team
D)the steering committee
Question
Which data-gathering approach is most helpful when the information to be gathered deals with question: "Why?"

A)interviews
B)observation by the analyst
C)questionnaires
D)system documentation
Question
A project development team at Midwest Construction was assigned the task of improving the efficiency of the firm's accounting information system.As part of the ______ step in systems development life cycle,the team has determined that the objectives of the project can be accomplished by installing a new computer system or by upgrading the existing system.

A)systems analysis
B)operations and maintenance
C)implementation and conversion
D)physical design
E)conceptual design
Question
One strategy used by systems analysts is prototyping.What is this?

A)making an internal and external review of the system to be analyzed
B)making an internal and external review of the system to be analyzed,noting that users may not use the existing AIS as intended
C)simply asking users what they need
D)when it is difficult to identify a usable set of requirements,a developer can quickly "rough" out a system for users to critique
Question
When is a proposal to conduct a systems analysis prepared?

A)after a written request for systems development is prepared
B)after the development team completes the survey of the existing AIS
C)after the initial investigation of the project is approved
D)before the initial investigation
Question
Which is the best data-gathering approach to use when information must be obtained from many different people?

A)a questionnaire
B)an interview
C)observation by the analyst
D)system documentation
Question
It is important for the systems analyst to determine AIS system objectives so that everyone involved can focus on the elements most vital to the system's success.The __________ objective states that crucial information should be produced first and then less important items as time permits.

A)flexibility
B)reliability
C)timeliness
D)usefulness
Question
What report serves as a repository of data from which systems designers can draw information?

A)the executive steering committee report
B)the initial investigation report
C)the systems analysis report
D)the systems survey report
Question
During which phase of systems analysis does modeling of the existing system occur?

A)information needs and system requirements
B)the feasibility study
C)the initial investigation
D)the systems survey
Question
A method used to gather information about an existing system is to make a model of it.There are several approaches to modeling in systems analysis.Logical modeling

A)comes only after a physical model of the existing system is created.
B)describes how a system should work,rather than how it actually works.
C)illustrates how a system functions by describing the flow of documents and computer processes.
D)illustrates what is being done,regardless of how that flow is actually accomplished.
Question
What are the best strategies for determining system requirements?

A)analyze existing systems,ask users what they need,prototyping,and monitoring
B)ask users what they need,analyze existing systems,develop concept of new system,and prototyping
C)ask users what they need,analyze existing systems,examine existing system utilization,and prototyping
D)ask users what they need,analyze existing systems,examine existing system utilization,and develop concept of new system
Question
The __________ method of gathering information helps to determine how a system should work.

A)interview
B)observation
C)questionnaire
D)system documentation
Question
The __________ method of gathering information helps to determine how a system actually works.

A)interview
B)observation
C)questionnaire
D)system documentation
Question
When the information is brief and well defined,which is the best data-gathering approach to use?

A)a questionnaire
B)an interview
C)observation by the analyst
D)system documentation
Question
A project development team at Midwest Construction was assigned the task of improving the efficiency of the firm's accounting information system.As part of the ______ step in systems development life cycle,the team has determined that implementation of the new system will yield an internal rate of return of 24.8%.

A)systems analysis
B)operations and maintenance
C)implementation and conversion
D)physical design
E)conceptual design
Question
The question of what the project should and should not accomplish is determined in what step of systems analysis?

A)feasibility study
B)initial investigation
C)systems analysis report
D)systems survey
Question
When would a company go through a systems development life cycle?

A)only when major changes are needed
B)only when minor changes are needed
C)Usually a company only goes through one complete systems development life cycle,after which the only phase that is repeated is the operations and maintenance phase.
D)whenever minor or major changes are needed
Question
Proper systems analysis is a five-step process.What is the step in which analysts conduct an extensive study of the present system to gain a thorough understanding of how it works?

A)feasibility study
B)information needs and requirements
C)systems analysis report
D)systems survey
Question
Refer to the PERT diagram below,where the numbers next to the arrows refer to the number of days required for completion of the corresponding activity.What is the critical path? <strong>Refer to the PERT diagram below,where the numbers next to the arrows refer to the number of days required for completion of the corresponding activity.What is the critical path?  </strong> A)A-B-D-F B)A-C-E-F C)A-B-D-E-F D)A-C-B-D-F E)A-C-B-D-E-F <div style=padding-top: 35px>

A)A-B-D-F
B)A-C-E-F
C)A-B-D-E-F
D)A-C-B-D-F
E)A-C-B-D-E-F
Question
On March 18,2008,a newly installed robotic painting system broke down.A technician was called to repair the system.She found that a shoe had been shoved into the system's innards.This is an example of dealing with change by

A)deterrence.
B)projection.
C)avoidance.
D)aggression.
Question
Three months after a new telephone system with voice mail was installed at Modest Expectations College in Pennsylvania,several senior faculty members were contacted by a telecommunications secretary and were told that their voice mail boxes were full.It turns out that they had never learned how to check their voice mail.This is an example of dealing with change by

A)deterrence.
B)projection.
C)avoidance.
D)aggression.
Question
Refer to the PERT diagram below,where the numbers next to the arrows refer to the number of days required for completion of the corresponding activity.What is the critical path? <strong>Refer to the PERT diagram below,where the numbers next to the arrows refer to the number of days required for completion of the corresponding activity.What is the critical path?  </strong> A)A-B-D-F B)A-C-E-F C)A-B-D-E-F D)A-C-B-D-F E)A-C-B-D-E-F <div style=padding-top: 35px>

A)A-B-D-F
B)A-C-E-F
C)A-B-D-E-F
D)A-C-B-D-F
E)A-C-B-D-E-F
Question
A project development team at Midwest Construction was assigned the task of improving the efficiency of the firm's accounting information system.As part of the ______ step in systems development life cycle,the team defined the procedures to back up and secure system data.

A)systems analysis
B)operations and maintenance
C)implementation and conversion
D)physical design
E)conceptual design
Question
Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the payback criterion? <strong>Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the payback criterion?  </strong> A)A B)B C)C D)D <div style=padding-top: 35px>

A)A
B)B
C)C
D)D
Question
Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the net present value criterion? <strong>Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the net present value criterion?  </strong> A)A B)B C)C D)D <div style=padding-top: 35px>

A)A
B)B
C)C
D)D
Question
Which of the following aspect of a feasibility study is concerned with human resources?

A)Economic feasibility
B)Technical feasibility
C)Legal feasibility
D)Scheduling feasibility
E)Operational feasibility
Question
Which of the following aspect of a feasibility study is concerned with meeting external reporting requirements?

A)Economic feasibility
B)Technical feasibility
C)Legal feasibility
D)Scheduling feasibility
E)Operational feasibility
Question
Dysfunctional employee behavior in response to implementation of a new computerized information system is likely to be the result of

A)poor human resource policies.
B)lack of communication and training.
C)weak system controls.
D)inadequate compensation policies.
Question
Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the internal rate of return criterion? <strong>Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the internal rate of return criterion?  </strong> A)A B)B C)C D)D <div style=padding-top: 35px>

A)A
B)B
C)C
D)D
Question
A project development team at Midwest Construction was assigned the task of improving the efficiency of the firm's accounting information system.As part of the ______ step in systems development life cycle,the team has initiated an end user training program in preparation for switching over to the new system.

A)systems analysis
B)operations and maintenance
C)implementation and conversion
D)physical design
E)conceptual design
Question
The least time-consuming method of collecting data for use in a systems survey is

A)observation.
B)interviews.
C)questionnaires.
D)reviewing system documentation.
Question
Shortly after a new automated quality assurance system went online,production output declined by three percent.The production manager,a long time employee,blamed the new system.He argued that "after we laid off Tom and Jimmy and put this machine in,things just slowed down.Nothing seems to work right anymore." This is an example of dealing with change by

A)deterrence.
B)projection.
C)avoidance.
D)aggression.
Question
Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the payback criterion? <strong>Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the payback criterion?  </strong> A)A B)B C)C D)D <div style=padding-top: 35px>

A)A
B)B
C)C
D)D
Question
Refer to the PERT diagram below,where the numbers next to the arrows refer to the number of days required for completion of the corresponding activity.What is the critical path? <strong>Refer to the PERT diagram below,where the numbers next to the arrows refer to the number of days required for completion of the corresponding activity.What is the critical path?  </strong> A)A-B-D-F B)A-C-E-F C)A-B-D-E-F D)A-C-B-D-F E)A-C-B-D-E-F <div style=padding-top: 35px>

A)A-B-D-F
B)A-C-E-F
C)A-B-D-E-F
D)A-C-B-D-F
E)A-C-B-D-E-F
Question
Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the internal rate of return criterion? <strong>Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the internal rate of return criterion?  </strong> A)A B)B C)C D)D <div style=padding-top: 35px>

A)A
B)B
C)C
D)D
Question
Identify the main reasons why companies change existing systems?
Question
Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the net present value criterion? <strong>Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the net present value criterion?  </strong> A)A B)B C)C D)D <div style=padding-top: 35px>

A)A
B)B
C)C
D)D
Question
Which of the following is the most important and frequently analyzed aspect of a feasibility study?

A)Economic feasibility
B)Technical feasibility
C)Legal feasibility
D)Scheduling feasibility
E)Operational feasibility
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/94
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 18: Introduction to Systems Development and Systems Analysis
1
An antiquated information system used by an office supply manufacturer caused customer dissatisfaction since it took two days to process a telephone order.After the system was upgraded and redesigned,the time to process a telephone order was reduced to three minutes.This is a prime example of

A)a competitive advantage.
B)a technological change.
C)an improved business process.
D)growth.
C
2
One step in the systems development life cycle (SDLC)identifies and evaluates design alternatives and to develop design specifications.This step is called

A)conceptual design.
B)implementation and conversion.
C)physical design.
D)systems analysis.
A
3
In which phase of the systems development life cycle are the new hardware and software for a system tested?

A)conceptual design
B)implementation and conversion
C)operations and maintenance
D)physical design
B
4
Whether systems changes are major or minor,most companies go through a system development life cycle.How many steps are there in this cycle?

A)2
B)3
C)4
D)5
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
5
Who is responsible for preparing the specifications that are used to create the programs?

A)management
B)programmers
C)systems analysts
D)the information systems steering committee
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
6
Which of the following activities is performed during the systems development life cycle?

A)assessing the ongoing feasibility of the project
B)managing the behavioral reactions to change
C)planning
D)All of the above activities are performed during the life cycle.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
7
What is the basic building block of information systems planning?

A)the master plan
B)the project development plan
C)systems analysis
D)adaptability
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
8
Which group of individuals listed below can be the most effective in generating employee support and encouraging the development and acceptance of an AIS project?

A)accountants
B)information systems steering committee
C)management
D)project development team
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
9
What is the role of the information systems steering committee?

A)It is a team of systems specialists,managers,accountants,and auditors that guides project development.
B)Since AIS development spans functional and divisional boundaries,an executive-level group is established to plan and oversee the IS function.
C)The group takes an active role in designing system controls and periodically monitoring and testing the system to verify the controls are implemented and functioning properly.
D)None of the descriptions above are appropriate.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
10
What is the planning horizon for the master plan?

A)one year
B)three years
C)five years
D)seven years
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
11
In which phase of the systems development life cycle are the broad needs of the users converted into detailed specifics that are coded and tested?

A)conceptual design
B)implementation and conversion
C)physical design
D)systems analysis
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
12
Which group of professionals is responsible for planning and monitoring a project to ensure timely and cost-effective completion?

A)information systems steering committee
B)management
C)project development team
D)system analysts
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
13
What is the correct sequence of the phases in the systems development life cycle?

A)conceptual design,physical design,system analysis,implementation and conversion,and operations and maintenance
B)conceptual design,system analysis,physical design,implementation and conversion
C)system analysis,conceptual design,physical design,implementation and conversion,and operations and maintenance
D)system analysis,physical design,conceptual design,and operations and maintenance
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
14
In which step of the SDLC do all of the elements of the system come together?

A)conceptual design
B)implementation and conversion
C)physical design
D)systems analysis
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
15
In which plan is the prioritized list of projects contained?

A)project development plan
B)scheduled project plan
C)the master plan
D)all of the above
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
16
Which group listed below has responsibility for ensuring that the new AIS will meet the needs of users?

A)accountants
B)the information system steering committee
C)the project development team
D)the system analysts and programmers
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
17
Organizations continually face the need for new,faster,and more reliable ways of obtaining information.One reason why companies change their systems is to increase quality,quantity,and the speed with which information can be accessed and processed.Such an improvement may result in an improved product or service and may help lower costs.This change is referred to as a(n)

A)competitive advantage
B)improved business process
C)productivity gain
D)technological change
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
18
A planning horizon of at least __________ years is reasonable for any master plan; however,the plan should be updated at least __________ each year.

A)3; twice
B)5; twice
C)7; once
D)5; once
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
19
__________ requires that all activities and the precedent and subsequent relationships among them be identified.

A)CASE
B)The Gantt chart
C)The PERT diagram
D)The SDLC cycle
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
20
All of the following are benefits of planning and managing systems development with the exception of

A)controlling costs
B)ensuring that the system is consistent with the organization's goals.
C)guaranteeing use of the system
D)helping keep the organization abreast of technological change
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
21
There are several important aspects to be considered during a feasibility study.The aspect that asks the question,"Can people use the system and will they use it?" is called

A)economic feasibility.
B)operational feasibility.
C)scheduling feasibility.
D)technical feasibility.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
22
A good rule to follow is "Avoid complex systems that cause radical changes." What expression is used to describe this system design rule?

A)humanize the system
B)keep the system simple
C)present the system in its proper context
D)test the system's integrity
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
23
A federal law demands that certain information about foreign customers should be maintained in the information system.In which part of a feasibility study should this requirement be considered?

A)economic feasibility
B)legal feasibility
C)operational feasibility
D)technical feasibility
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
24
During what step in systems analysis is an examination made of each development activity to define the problem to be solved?

A)information needs and systems requirements
B)the feasibility study
C)the initial investigation
D)the systems survey
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
25
It is appropriate to develop several different design approaches to meeting system requirements for a project.Capital budgeting techniques are used to evaluate the economic merits of each alternative.The technique where estimated future cash flows are discounted back to the present is referred to as

A)the future value method.
B)the internal rate of return.
C)the net present value method.
D)the payback method.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
26
What is another name for a feasibility study?

A)a business case
B)a Gantt chart
C)an executive summary
D)PERT
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
27
Which of the following parts of a feasibility study is generally considered the most important and is frequently re-analyzed?

A)economic feasibility
B)operational feasibility
C)scheduling feasibility
D)technical feasibility
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
28
When using the payback method to determine economic feasibility of projects,the company usually accepts the project with the

A)longest payback period.
B)mid-range payback period.
C)payback period that is equal to the project's economic life.
D)shortest payback period.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
29
What is most difficult item to quantify when assessing economic feasibility?

A)benefits
B)costs
C)Costs,benefits,and the payback period are all of equal difficulty.
D)the payback period
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
30
The type of resistance in which data are erroneously entered into a system is called

A)acceptance.
B)aggression.
C)avoidance.
D)projection.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
31
A network of arrows and nodes representing project activities that require an expenditure of time and resources and the completion of initiation of activities,respectively,is called

A)a Gantt chart.
B)a PERT diagram.
C)a SDLC cycle.
D)CASE.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
32
The question of economic feasibility is important when designing and implementing a new system.Accountants can contribute to feasibility study analysis by evaluating cost savings and other benefits versus operating costs and other cash outflows.This is better known as

A)the "best guess" model of benefit analysis.
B)the "value added" benefit model.
C)the capital budgeting model.
D)the estimated benefits model.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
33
To minimize adverse behavioral reactions,the organization must first understand why resistance to change occurs.One behavioral problem occurs when there is insufficient explanation of why a change must take place.In order to curtail this resistance from occurring within the organization,what guideline should be implemented and followed?

A)attempt to meet the users' needs
B)avoid emotionalism
C)keep communication lines open
D)keep the system simple
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
34
Major resistance to change takes one of several forms.What is the name of the form of resistance where the new system is blamed for any and every unpleasant occurrence?

A)aggression
B)avoidance
C)procrastination
D)projection
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
35
What is the basic model used to create a framework for economic feasibility analysis?

A)the capital budgeting model
B)the cash budgeting model
C)the cost/benefit model
D)All of the above models are used to create a framework.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
36
Continuing to use a manual system instead of the new AIS is a form of resistance known as

A)acceptance.
B)aggression.
C)avoidance.
D)projection.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
37
Which planning technique does not show the relationships among various activities?

A)Gantt chart
B)PERT
C)the critical path method
D)VAN
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
38
Systems development planning is an important step in the SDLC for a number of reasons.When management is better prepared for future resource needs and employees are better prepared for the changes that will occur,it can be said that the systems development planning has

A)adaptability.
B)attained lower costs.
C)consistency.
D)reached a level of efficiency.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
39
In which phase of the systems development life cycle is the feasibility study first performed?

A)conceptual design
B)implementation and conversion
C)physical design
D)system analysis
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
40
To minimize adverse behavioral reactions,the organization must first understand why resistance to change occurs.One behavioral problem occurs when there is insufficient explanation of why a change must take place.This type of problem falls into the general category of

A)communication.
B)natural resistance to change.
C)the manner in which the change is introduced.
D)top management support of change.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
41
How frequently should an AIS be monitored and any minor modifications be made to it?

A)annually
B)continuously
C)when technology changes
D)when the competition changes its systems
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
42
Which method of data gathering is most likely to result in information that represents the personal biases and opinions of the person giving the information?

A)a questionnaire
B)an interview
C)observation by the analyst
D)system documentation
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
43
Which group is responsible for preparing a systems analysis report?

A)computer analysts
B)management
C)the project development team
D)the steering committee
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
44
Which data-gathering approach is most helpful when the information to be gathered deals with question: "Why?"

A)interviews
B)observation by the analyst
C)questionnaires
D)system documentation
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
45
A project development team at Midwest Construction was assigned the task of improving the efficiency of the firm's accounting information system.As part of the ______ step in systems development life cycle,the team has determined that the objectives of the project can be accomplished by installing a new computer system or by upgrading the existing system.

A)systems analysis
B)operations and maintenance
C)implementation and conversion
D)physical design
E)conceptual design
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
46
One strategy used by systems analysts is prototyping.What is this?

A)making an internal and external review of the system to be analyzed
B)making an internal and external review of the system to be analyzed,noting that users may not use the existing AIS as intended
C)simply asking users what they need
D)when it is difficult to identify a usable set of requirements,a developer can quickly "rough" out a system for users to critique
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
47
When is a proposal to conduct a systems analysis prepared?

A)after a written request for systems development is prepared
B)after the development team completes the survey of the existing AIS
C)after the initial investigation of the project is approved
D)before the initial investigation
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
48
Which is the best data-gathering approach to use when information must be obtained from many different people?

A)a questionnaire
B)an interview
C)observation by the analyst
D)system documentation
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
49
It is important for the systems analyst to determine AIS system objectives so that everyone involved can focus on the elements most vital to the system's success.The __________ objective states that crucial information should be produced first and then less important items as time permits.

A)flexibility
B)reliability
C)timeliness
D)usefulness
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
50
What report serves as a repository of data from which systems designers can draw information?

A)the executive steering committee report
B)the initial investigation report
C)the systems analysis report
D)the systems survey report
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
51
During which phase of systems analysis does modeling of the existing system occur?

A)information needs and system requirements
B)the feasibility study
C)the initial investigation
D)the systems survey
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
52
A method used to gather information about an existing system is to make a model of it.There are several approaches to modeling in systems analysis.Logical modeling

A)comes only after a physical model of the existing system is created.
B)describes how a system should work,rather than how it actually works.
C)illustrates how a system functions by describing the flow of documents and computer processes.
D)illustrates what is being done,regardless of how that flow is actually accomplished.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
53
What are the best strategies for determining system requirements?

A)analyze existing systems,ask users what they need,prototyping,and monitoring
B)ask users what they need,analyze existing systems,develop concept of new system,and prototyping
C)ask users what they need,analyze existing systems,examine existing system utilization,and prototyping
D)ask users what they need,analyze existing systems,examine existing system utilization,and develop concept of new system
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
54
The __________ method of gathering information helps to determine how a system should work.

A)interview
B)observation
C)questionnaire
D)system documentation
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
55
The __________ method of gathering information helps to determine how a system actually works.

A)interview
B)observation
C)questionnaire
D)system documentation
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
56
When the information is brief and well defined,which is the best data-gathering approach to use?

A)a questionnaire
B)an interview
C)observation by the analyst
D)system documentation
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
57
A project development team at Midwest Construction was assigned the task of improving the efficiency of the firm's accounting information system.As part of the ______ step in systems development life cycle,the team has determined that implementation of the new system will yield an internal rate of return of 24.8%.

A)systems analysis
B)operations and maintenance
C)implementation and conversion
D)physical design
E)conceptual design
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
58
The question of what the project should and should not accomplish is determined in what step of systems analysis?

A)feasibility study
B)initial investigation
C)systems analysis report
D)systems survey
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
59
When would a company go through a systems development life cycle?

A)only when major changes are needed
B)only when minor changes are needed
C)Usually a company only goes through one complete systems development life cycle,after which the only phase that is repeated is the operations and maintenance phase.
D)whenever minor or major changes are needed
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
60
Proper systems analysis is a five-step process.What is the step in which analysts conduct an extensive study of the present system to gain a thorough understanding of how it works?

A)feasibility study
B)information needs and requirements
C)systems analysis report
D)systems survey
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
61
Refer to the PERT diagram below,where the numbers next to the arrows refer to the number of days required for completion of the corresponding activity.What is the critical path? <strong>Refer to the PERT diagram below,where the numbers next to the arrows refer to the number of days required for completion of the corresponding activity.What is the critical path?  </strong> A)A-B-D-F B)A-C-E-F C)A-B-D-E-F D)A-C-B-D-F E)A-C-B-D-E-F

A)A-B-D-F
B)A-C-E-F
C)A-B-D-E-F
D)A-C-B-D-F
E)A-C-B-D-E-F
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
62
On March 18,2008,a newly installed robotic painting system broke down.A technician was called to repair the system.She found that a shoe had been shoved into the system's innards.This is an example of dealing with change by

A)deterrence.
B)projection.
C)avoidance.
D)aggression.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
63
Three months after a new telephone system with voice mail was installed at Modest Expectations College in Pennsylvania,several senior faculty members were contacted by a telecommunications secretary and were told that their voice mail boxes were full.It turns out that they had never learned how to check their voice mail.This is an example of dealing with change by

A)deterrence.
B)projection.
C)avoidance.
D)aggression.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
64
Refer to the PERT diagram below,where the numbers next to the arrows refer to the number of days required for completion of the corresponding activity.What is the critical path? <strong>Refer to the PERT diagram below,where the numbers next to the arrows refer to the number of days required for completion of the corresponding activity.What is the critical path?  </strong> A)A-B-D-F B)A-C-E-F C)A-B-D-E-F D)A-C-B-D-F E)A-C-B-D-E-F

A)A-B-D-F
B)A-C-E-F
C)A-B-D-E-F
D)A-C-B-D-F
E)A-C-B-D-E-F
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
65
A project development team at Midwest Construction was assigned the task of improving the efficiency of the firm's accounting information system.As part of the ______ step in systems development life cycle,the team defined the procedures to back up and secure system data.

A)systems analysis
B)operations and maintenance
C)implementation and conversion
D)physical design
E)conceptual design
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
66
Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the payback criterion? <strong>Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the payback criterion?  </strong> A)A B)B C)C D)D

A)A
B)B
C)C
D)D
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
67
Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the net present value criterion? <strong>Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the net present value criterion?  </strong> A)A B)B C)C D)D

A)A
B)B
C)C
D)D
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
68
Which of the following aspect of a feasibility study is concerned with human resources?

A)Economic feasibility
B)Technical feasibility
C)Legal feasibility
D)Scheduling feasibility
E)Operational feasibility
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
69
Which of the following aspect of a feasibility study is concerned with meeting external reporting requirements?

A)Economic feasibility
B)Technical feasibility
C)Legal feasibility
D)Scheduling feasibility
E)Operational feasibility
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
70
Dysfunctional employee behavior in response to implementation of a new computerized information system is likely to be the result of

A)poor human resource policies.
B)lack of communication and training.
C)weak system controls.
D)inadequate compensation policies.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
71
Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the internal rate of return criterion? <strong>Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the internal rate of return criterion?  </strong> A)A B)B C)C D)D

A)A
B)B
C)C
D)D
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
72
A project development team at Midwest Construction was assigned the task of improving the efficiency of the firm's accounting information system.As part of the ______ step in systems development life cycle,the team has initiated an end user training program in preparation for switching over to the new system.

A)systems analysis
B)operations and maintenance
C)implementation and conversion
D)physical design
E)conceptual design
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
73
The least time-consuming method of collecting data for use in a systems survey is

A)observation.
B)interviews.
C)questionnaires.
D)reviewing system documentation.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
74
Shortly after a new automated quality assurance system went online,production output declined by three percent.The production manager,a long time employee,blamed the new system.He argued that "after we laid off Tom and Jimmy and put this machine in,things just slowed down.Nothing seems to work right anymore." This is an example of dealing with change by

A)deterrence.
B)projection.
C)avoidance.
D)aggression.
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
75
Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the payback criterion? <strong>Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the payback criterion?  </strong> A)A B)B C)C D)D

A)A
B)B
C)C
D)D
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
76
Refer to the PERT diagram below,where the numbers next to the arrows refer to the number of days required for completion of the corresponding activity.What is the critical path? <strong>Refer to the PERT diagram below,where the numbers next to the arrows refer to the number of days required for completion of the corresponding activity.What is the critical path?  </strong> A)A-B-D-F B)A-C-E-F C)A-B-D-E-F D)A-C-B-D-F E)A-C-B-D-E-F

A)A-B-D-F
B)A-C-E-F
C)A-B-D-E-F
D)A-C-B-D-F
E)A-C-B-D-E-F
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
77
Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the internal rate of return criterion? <strong>Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the internal rate of return criterion?  </strong> A)A B)B C)C D)D

A)A
B)B
C)C
D)D
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
78
Identify the main reasons why companies change existing systems?
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
79
Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the net present value criterion? <strong>Refer to the table below,which shows the results of payback,net present value,and internal rate of return analysis of four projects.Which is preferred by the net present value criterion?  </strong> A)A B)B C)C D)D

A)A
B)B
C)C
D)D
Unlock Deck
Unlock for access to all 94 flashcards in this deck.
Unlock Deck
k this deck
80
Which of the following is the most important and frequently analyzed aspect of a feasibility study?

A)Economic feasibility
B)Technical feasibility
C)Legal feasibility
D)Scheduling feasibility
E)Operational feasibility