Deck 5: Determining HR Demand

Full screen (f)
exit full mode
Question
Unlike trend analysis,impact analysis relies on subjective,but expert,judgments.
Use Space or
up arrow
down arrow
to flip the card.
Question
Trend analyses are complex since they require the analysis of multiple variables.
Question
HR demand refers to the future need for the firm's skills requirements,the types of jobs and the number of positions that must be filled for the firm to implement its strategy.
Question
According to the textbook,typical estimates for scenario forecasting are organized into optimistic,realistic,and pessimistic scenarios.
Question
Regression analysis is a very effective quantitative forecasting technique for all time horizons.
Question
A ratio analysis is a quantitative method of projecting HR demand by analyzing the relationship between an operational index and the number of employees required.
Question
In an impact analysis,current trends are analyzed by a panel of experts to predict future HR demand.
Question
The first step in the nominal group technique is to select the experts.
Question
In a trend analysis,it is necessary to extrapolate data related to historical changes.
Question
A staffing table forecasts the total HR demand required for operational or short-run time periods.
Question
Scenario forecasting is based on the premise that,because the future course of events is not known with certainty,it is necessary to develop several plausible sets of outcomes.
Question
In the simple regression prediction model,X represents the independent variable.
Question
HR budgets are a qualitative method of HR demand forecasting that estimates the number and types of personnel required by the organization.
Question
According to the article entitled "Projecting Labour Demand in Canada," management occupations will feel the most intense pressure from immigration.
Question
A regression analysis is a linear equation between a single causal variable and multiple dependent variables.
Question
The demand for human capital resources is determined by the strategic and operational requirements of the firm or business unit.
Question
In a simple regression equation,there is an assumption of linearity between the independent and dependent variables.
Question
The Delphi technique is a quantitative method for deriving detailed assumptions of long-run HR demand.
Question
If there are several dependent variables,then the regression is referred to as multivariate regression analysis.
Question
In a simple regression,Y is the independent variable.
Question
In the Delphi method experts do not meet,but they do in the nominal group technique.
Question
In a simple regression prediction model,what does B represent?

A) dependent variable
B) constant or intercept
C) slope of the linear relationship between X and Y
D) independent variable
Question
How do the experts finally agree on a solution in the nominal group technique?

A) by defending their perspectives
B) by voting for the best estimate
C) by lobbying the other group members
D) by ranking the solutions with a secret vote
Question
An organization wants to use a quantitative demand forecasting method.Which of the following is NOT a quantitative method?

A) trend analysis
B) Delphi technique
C) regression analysis
D) staffing table
Question
Multivariate regression and other similar modelling/programming models depend on large amounts of reliable data.
Question
Perceived status differences may influence how experts express their views when forecasting in face-to-face groups.
Question
The last stage in the nominal group technique is a secret vote that determines the highest ranking for the group's HR demand solution.
Question
An organization wants to use a qualitative demand forecasting method.Which of the following is a qualitative method?

A) trend analysis
B) nominal group technique
C) HR budget
D) staffing table
Question
Times series models use past data to predict future demand.They can range from very simple to highly complex.
Question
What federal government agency provides expert information for labour demand forecasting?

A) National Occupational Classification
B) Citizenship and Immigration Canada
C) Conference Board of Canada
D) Statistics Canada
Question
An organization wants to determine the total HR demand requirement for long-run time periods.What would be the best way to gather this information?

A) use staffing tables
B) use an HR budget
C) use impact analysis
D) use scenario forecasts
Question
Tim Hortons integrates digitized data from all the corporate functions,including marketing,operations,finance,and HR,as well as information from social media sources such as Facebook and LinkedIn,and more.What is this data called?

A) HR data
B) research data
C) big data
D) quantitative data
Question
Another name for the scenario forecast method is the projection forecast method.
Question
Why are assumptions necessary when implementing the steps of the nominal group technique?

A) to minimize the chance that expert estimates will be misinterpreted
B) to make sure that the group is not dominated by one expert estimate
C) to eliminate the necessity for experts to defend their estimates
D) to ensure the validity and confidentiality of the expert estimates
Question
If you want to determine the total HR demand requirement for operational or short-run time periods,what type of information should you gather?

A) staffing table
B) HR budget
C) impact analysis
D) envelope/scenario forecasts
Question
​Canadian Engineering Shortages
According to a new Engineers Canada labour market projection report,there are currently labour shortages in a number of engineering occupations,particularly civil,mechanical,electrical,and electronic engineers,as well as a shortage of computer engineers at both the provincial and national levels.Occupation data sourced from the Canadian National Household Survey and the Canadian Labour Force Survey indicate that engineering occupations' employment and wages are increasing faster than in other occupations.Unemployment is very low,less than one percent for many engineering occupations,relative to historical data and to other occupation data.Replacement demand for engineers will be particularly relevant over the next decade as the baby boom generation retires.Economic activity is generating a stronger demand for engineers in Western Canada than in Eastern Canada.

Out of the fourteen different engineering occupations,the forecast for civil engineers is particularly high.It is projected that there will be an average of 2 500 job openings for civil engineers annually over the next five years.Growth in industries that employ civil engineers will generate about 1 000 of these openings each year.Another 1 500 of these job openings will be related to the replacement of retiring workers,given the high average age of 48 years old for civil engineers.

What would be the most effective strategy to deal with the engineering shortages?

A) utilize job sharing arrangements
B) increase engineering school graduates
C) use flexible contract arrangements
D) use internal transfers
Question
A deficiency of the Delphi technique is that the results cannot be verified statistically.
Question
Canadian Engineering Shortages
According to a new Engineers Canada labour market projection report,there are currently labour shortages in a number of engineering occupations,particularly civil,mechanical,electrical,and electronic engineers,as well as a shortage of computer engineers at both the provincial and national levels.Occupation data sourced from the Canadian National Household Survey and the Canadian Labour Force Survey indicate that engineering occupations' employment and wages are increasing faster than in other occupations.Unemployment is very low,less than one percent for many engineering occupations,relative to historical data and to other occupation data.Replacement demand for engineers will be particularly relevant over the next decade as the baby boom generation retires.Economic activity is generating a stronger demand for engineers in Western Canada than in Eastern Canada.

Out of the fourteen different engineering occupations,the forecast for civil engineers is particularly high.It is projected that there will be an average of 2 500 job openings for civil engineers annually over the next five years.Growth in industries that employ civil engineers will generate about 1 000 of these openings each year.Another 1 500 of these job openings will be related to the replacement of retiring workers,given the high average age of 48 years old for civil engineers.
What would you call the process described in this scenario?

A) strategic human resource management
B) human resource planning
C) linking human resource management with strategic planning
D) human resource supply techniques
Question
A regression analysis is a form of time series design that uses the data from the current year (period)to predict next year's (period's)demand,reflecting a linear relationship.
Question
According to the textbook,when the Delphi technique was used to identify competencies for research chef,which of the following was NOT a topic for consideration?

A) factors that differentiate successful from unsuccessful research chefs
B) years of experience for successful and unsuccessful research chefs
C) skills and knowledge needed to be a successful research chef
D) tasks that differentiate a successful research chef from an ordinary chef
Question
​Canadian Engineering Shortages
According to a new Engineers Canada labour market projection report,there are currently labour shortages in a number of engineering occupations,particularly civil,mechanical,electrical,and electronic engineers,as well as a shortage of computer engineers at both the provincial and national levels.Occupation data sourced from the Canadian National Household Survey and the Canadian Labour Force Survey indicate that engineering occupations' employment and wages are increasing faster than in other occupations.Unemployment is very low,less than one percent for many engineering occupations,relative to historical data and to other occupation data.Replacement demand for engineers will be particularly relevant over the next decade as the baby boom generation retires.Economic activity is generating a stronger demand for engineers in Western Canada than in Eastern Canada.

Out of the fourteen different engineering occupations,the forecast for civil engineers is particularly high.It is projected that there will be an average of 2 500 job openings for civil engineers annually over the next five years.Growth in industries that employ civil engineers will generate about 1 000 of these openings each year.Another 1 500 of these job openings will be related to the replacement of retiring workers,given the high average age of 48 years old for civil engineers.

What do the Canadian National Household Survey and the Canadian Labour Force Survey reports attempt to do?

A) predict the future demand and supply for a wide variety of Canadian occupations
B) predict the future demand growth for a wide variety of Canadian occupations
C) estimate the future demand and supply for Canadian workers
D) predict the future demand and supply for Canadian engineering workers
Question
Typically,how is most of the expert information gathered using the Delphi technique?

A) interviews
B) discussion groups
C) teleconferencing
D) questionnaires
Question
What type of analysis presupposes that a linear relationship exists between sales and the number of employees?

A) ratio
B) multivariate
C) trend
D) regression
Question
​Canadian Engineering Shortages
According to a new Engineers Canada labour market projection report,there are currently labour shortages in a number of engineering occupations,particularly civil,mechanical,electrical,and electronic engineers,as well as a shortage of computer engineers at both the provincial and national levels.Occupation data sourced from the Canadian National Household Survey and the Canadian Labour Force Survey indicate that engineering occupations' employment and wages are increasing faster than in other occupations.Unemployment is very low,less than one percent for many engineering occupations,relative to historical data and to other occupation data.Replacement demand for engineers will be particularly relevant over the next decade as the baby boom generation retires.Economic activity is generating a stronger demand for engineers in Western Canada than in Eastern Canada.

Out of the fourteen different engineering occupations,the forecast for civil engineers is particularly high.It is projected that there will be an average of 2 500 job openings for civil engineers annually over the next five years.Growth in industries that employ civil engineers will generate about 1 000 of these openings each year.Another 1 500 of these job openings will be related to the replacement of retiring workers,given the high average age of 48 years old for civil engineers.
The situation described in this scenario can be referred to as a tight labour market.What occurs in a tight labour market?

A) The supply of labour exceeds the demand for labour.
B) Labour supply and demand creates tension in the labour market.
C) The demand for labour exceeds the supply of labour.
D) Supply and demand create labour shortages.
Question
The Oakland Athletics baseball team used statistical cause-and-effect models for HR planning.What do cause-and-effect models assume?

A) that there is an ongoing relationship between independent and dependent variables
B) that the extrapolated trends will influence future supply and demand
C) that the time horizon used for the models is most conducive to short-term forecasts
D) that the subjective judgment of experts supports the forecasts
Question
An organization is using multiple predictor estimates of the future demand for human resources based on a variety of differing assumptions about how future events will unfold.What type of forecasting technique or analysis is it using?

A) Delphi technique
B) nominal technique
C) impact analysis
D) scenario forecast
Question
If HR specialists use multiple predictor estimates of the future demand for personnel based on a variety of differing assumptions about how future events will unfold,what type of forecasting technique or analysis are they using?

A) Delphi technique
B) nominal technique
C) impact analysis
D) scenario forecast
Question
What stage in the nominal group technique would typically ask a question like,"What will ABC Corporation's demand for production workers be in the year 2017?"

A) select the experts
B) meet face to face
C) define the question
D) discuss demand estimates
Question
What type of analysis reveals the historical relationship between the operational index and the demand for labour?

A) correlation
B) multivariate
C) trend
D) regression
Question
What would be two human resource quantitative forecasting demand techniques?

A) regression analysis and trend projection techniques
B) extrapolation and transition matrices techniques
C) indexation and replacement chart techniques
D) budget analysis and skills inventory techniques
Question
In the Delphi technique,why do the experts NOT meet face-to-face?

A) They do not have the time.
B) They want to lower costs.
C) They worry about groupthink.
D) They lack communication expertise.
Question
Tiger Boots,a footwear retailer,is currently determining its HR demand using ratio analysis.What would be a key operational index used by Tiger Boots in a ratio analysis?

A) sales level
B) human resources
C) clients served
D) production hours
Question
What would be two human resource qualitative forecasting demand techniques?

A) regression analysis and trend/ratio analysis techniques
B) extrapolation and transition matrices techniques
C) scenario planning and nominal group techniques
D) budget analysis and skills inventory techniques
Question
What would be the first step in HR forecasting once an organization has identified its organizational goals,objectives,and plans?

A) to examine data from a variety of perspectives
B) to determine the overall demand requirements for personnel (i.e. ,what staff are needed,when,and where)
C) to assess in-house skills and other internal supply characteristics
D) to determine the net demand requirements that must be met from external environmental supply sources
Question
What method of estimating HR demand extrapolates historical organizational indices to forecast future personnel needs?

A) trend analysis
B) ratio analysis
C) cohort analysis
D) impact analysis
Question
Which forecasting technique provides a long-run qualitative forecast where experts meet and give their assessments about the future?

A) Delphi technique
B) critical incident technique
C) repatriation technique
D) nominal group technique
Question
Which of the following is NOT typically considered to be an expert for HR forecasting?

A) union staff members
B) line employees
C) university researchers
D) business consultants
Question
What is the most common operational index used by organizations in a trend analysis?

A) sales level
B) units produced
C) clients served
D) production hours
Question
Which of the following is NOT considered a benefit of the nominal group technique?

A) supports brainstorming
B) lower costs and time
C) equal participation
D) reliable and valid
Question
An organization wants to determine its total HR demand requirement for operational or short-run time periods.What would be the best way to gather this information?

A) use staffing tables
B) use Markov analysis
C) use impact analysis
D) use scenario forecasts
Question
What is envelope/scenario forecasting? Describe some of its features.
Question
​Canadian Engineering Shortages
According to a new Engineers Canada labour market projection report,there are currently labour shortages in a number of engineering occupations,particularly civil,mechanical,electrical,and electronic engineers,as well as a shortage of computer engineers at both the provincial and national levels.Occupation data sourced from the Canadian National Household Survey and the Canadian Labour Force Survey indicate that engineering occupations' employment and wages are increasing faster than in other occupations.Unemployment is very low,less than one percent for many engineering occupations,relative to historical data and to other occupation data.Replacement demand for engineers will be particularly relevant over the next decade as the baby boom generation retires.Economic activity is generating a stronger demand for engineers in Western Canada than in Eastern Canada.

Out of the fourteen different engineering occupations,the forecast for civil engineers is particularly high.It is projected that there will be an average of 2 500 job openings for civil engineers annually over the next five years.Growth in industries that employ civil engineers will generate about 1 000 of these openings each year.Another 1 500 of these job openings will be related to the replacement of retiring workers,given the high average age of 48 years old for civil engineers.

The growth in demand for civil engineering occupations has been strong due to the rising needs associated with the high number of retiring workers.Although countless challenges influence the demand for engineering professionals,what is the primary cause of demand in this case?

A) external factors
B) demographic factors
C) labour market factors
D) organizational factors
Question
​Canadian Engineering Shortages
According to a new Engineers Canada labour market projection report,there are currently labour shortages in a number of engineering occupations,particularly civil,mechanical,electrical,and electronic engineers,as well as a shortage of computer engineers at both the provincial and national levels.Occupation data sourced from the Canadian National Household Survey and the Canadian Labour Force Survey indicate that engineering occupations' employment and wages are increasing faster than in other occupations.Unemployment is very low,less than one percent for many engineering occupations,relative to historical data and to other occupation data.Replacement demand for engineers will be particularly relevant over the next decade as the baby boom generation retires.Economic activity is generating a stronger demand for engineers in Western Canada than in Eastern Canada.

Out of the fourteen different engineering occupations,the forecast for civil engineers is particularly high.It is projected that there will be an average of 2 500 job openings for civil engineers annually over the next five years.Growth in industries that employ civil engineers will generate about 1 000 of these openings each year.Another 1 500 of these job openings will be related to the replacement of retiring workers,given the high average age of 48 years old for civil engineers.
Indicators suggest that the demand for engineering occupations currently exceeds supply at the provincial and national levels.What is this estimate of demand and supply called?

A) strategic human resource management
B) human resource planning
C) human resource estimating techniques
D) human resource forecasting techniques
Question
What do you call the observed relationship between the independent and dependent variables?

A) causal
B) direct
C) linear
D) indirect
Question
Analyze Case Incident: "Canadian Engineering Shortages." Using the information you know about forecasting HR demand,what advice would you offer to Engineers Canada to address the replacement demand for engineers over the next decade
Question
There are six steps associated with the Delphi technique for HR demand forecasting.What is the first step?

A) identify the experts,terms,and time horizon
B) issue the first round of questionnaires
C) select the experts
D) define and refine the issue or question
Question
According to the textbook,what is one disadvantage of the Delphi technique?

A) groupthink
B) shyness
C) time and costs
D) communication
Question
Which of the following demand forecasting methods is NOT a quantitative method?

A) trend analysis
B) Delphi technique
C) regression analysis
D) staffing table
Question
Describe what an "expert" demand forecast is and list five different types of experts who could be involved.Identify and describe two different types of expert forecasting methods.
Question
Describe how HR Budgets and staffing tables are applied in HR demand forecasting.
Question
When trying to forecast the number of employee hours required for work in a retail store during December,the HR planner used last December's ratio of total sales to total hours worked as the basis for an estimate for the current year's needs.What forecasting model is the HR planner using to predict future HR demand?

A) times series model
B) regression model
C) projection model
D) production model
Question
What are some the advantages and disadvantages of the Delphi technique,where experts do NOT meet face-to-face?
Question
Which forecasting technique would an organization use if it wanted to conduct a long-run qualitative forecast in which experts meet and give their assessments about the future?

A) Delphi technique
B) critical incident technique
C) repatriation technique
D) nominal group technique
Question
​Canadian Engineering Shortages
According to a new Engineers Canada labour market projection report,there are currently labour shortages in a number of engineering occupations,particularly civil,mechanical,electrical,and electronic engineers,as well as a shortage of computer engineers at both the provincial and national levels.Occupation data sourced from the Canadian National Household Survey and the Canadian Labour Force Survey indicate that engineering occupations' employment and wages are increasing faster than in other occupations.Unemployment is very low,less than one percent for many engineering occupations,relative to historical data and to other occupation data.Replacement demand for engineers will be particularly relevant over the next decade as the baby boom generation retires.Economic activity is generating a stronger demand for engineers in Western Canada than in Eastern Canada.

Out of the fourteen different engineering occupations,the forecast for civil engineers is particularly high.It is projected that there will be an average of 2 500 job openings for civil engineers annually over the next five years.Growth in industries that employ civil engineers will generate about 1 000 of these openings each year.Another 1 500 of these job openings will be related to the replacement of retiring workers,given the high average age of 48 years old for civil engineers.

What human resource technique is being used to gather the data for the Engineers Canada labour market projection report?

A) human resource occupational planning
B) human resource Markov analysis
C) human resource audits
D) human resource forecasting
Question
What technique should be used if you want all the participants to have equal participation in the sessions and to minimize dominance,personal attacks,and defensive behaviour?

A) Delphi technique
B) critical incident technique
C) repatriation technique
D) nominal group technique
Question
In the Delphi technique,why does the project coordinator continue to issue questionnaires to the experts?

A) Current information has not been optimal,and so further information is required.
B) Additional information still needs to be gathered regarding the predetermined questions.
C) Information gathered to date has not led the group to make a consensual decision.
D) Current information is insufficient in some way that is required to make future supply estimates.
Question
An organization wants to determine the total HR demand requirement for long-run time periods.What would be the best way to gather this information?

A) use staffing tables
B) use movement analysis
C) use impact analysis
D) use scenario forecasts
Question
What is another name for the dependent variable in the simple regression prediction model?

A) causal variable
B) target variable
C) linear variable
D) random variable
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/78
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 5: Determining HR Demand
1
Unlike trend analysis,impact analysis relies on subjective,but expert,judgments.
True
2
Trend analyses are complex since they require the analysis of multiple variables.
False
3
HR demand refers to the future need for the firm's skills requirements,the types of jobs and the number of positions that must be filled for the firm to implement its strategy.
True
4
According to the textbook,typical estimates for scenario forecasting are organized into optimistic,realistic,and pessimistic scenarios.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
5
Regression analysis is a very effective quantitative forecasting technique for all time horizons.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
6
A ratio analysis is a quantitative method of projecting HR demand by analyzing the relationship between an operational index and the number of employees required.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
7
In an impact analysis,current trends are analyzed by a panel of experts to predict future HR demand.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
8
The first step in the nominal group technique is to select the experts.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
9
In a trend analysis,it is necessary to extrapolate data related to historical changes.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
10
A staffing table forecasts the total HR demand required for operational or short-run time periods.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
11
Scenario forecasting is based on the premise that,because the future course of events is not known with certainty,it is necessary to develop several plausible sets of outcomes.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
12
In the simple regression prediction model,X represents the independent variable.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
13
HR budgets are a qualitative method of HR demand forecasting that estimates the number and types of personnel required by the organization.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
14
According to the article entitled "Projecting Labour Demand in Canada," management occupations will feel the most intense pressure from immigration.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
15
A regression analysis is a linear equation between a single causal variable and multiple dependent variables.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
16
The demand for human capital resources is determined by the strategic and operational requirements of the firm or business unit.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
17
In a simple regression equation,there is an assumption of linearity between the independent and dependent variables.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
18
The Delphi technique is a quantitative method for deriving detailed assumptions of long-run HR demand.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
19
If there are several dependent variables,then the regression is referred to as multivariate regression analysis.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
20
In a simple regression,Y is the independent variable.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
21
In the Delphi method experts do not meet,but they do in the nominal group technique.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
22
In a simple regression prediction model,what does B represent?

A) dependent variable
B) constant or intercept
C) slope of the linear relationship between X and Y
D) independent variable
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
23
How do the experts finally agree on a solution in the nominal group technique?

A) by defending their perspectives
B) by voting for the best estimate
C) by lobbying the other group members
D) by ranking the solutions with a secret vote
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
24
An organization wants to use a quantitative demand forecasting method.Which of the following is NOT a quantitative method?

A) trend analysis
B) Delphi technique
C) regression analysis
D) staffing table
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
25
Multivariate regression and other similar modelling/programming models depend on large amounts of reliable data.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
26
Perceived status differences may influence how experts express their views when forecasting in face-to-face groups.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
27
The last stage in the nominal group technique is a secret vote that determines the highest ranking for the group's HR demand solution.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
28
An organization wants to use a qualitative demand forecasting method.Which of the following is a qualitative method?

A) trend analysis
B) nominal group technique
C) HR budget
D) staffing table
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
29
Times series models use past data to predict future demand.They can range from very simple to highly complex.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
30
What federal government agency provides expert information for labour demand forecasting?

A) National Occupational Classification
B) Citizenship and Immigration Canada
C) Conference Board of Canada
D) Statistics Canada
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
31
An organization wants to determine the total HR demand requirement for long-run time periods.What would be the best way to gather this information?

A) use staffing tables
B) use an HR budget
C) use impact analysis
D) use scenario forecasts
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
32
Tim Hortons integrates digitized data from all the corporate functions,including marketing,operations,finance,and HR,as well as information from social media sources such as Facebook and LinkedIn,and more.What is this data called?

A) HR data
B) research data
C) big data
D) quantitative data
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
33
Another name for the scenario forecast method is the projection forecast method.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
34
Why are assumptions necessary when implementing the steps of the nominal group technique?

A) to minimize the chance that expert estimates will be misinterpreted
B) to make sure that the group is not dominated by one expert estimate
C) to eliminate the necessity for experts to defend their estimates
D) to ensure the validity and confidentiality of the expert estimates
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
35
If you want to determine the total HR demand requirement for operational or short-run time periods,what type of information should you gather?

A) staffing table
B) HR budget
C) impact analysis
D) envelope/scenario forecasts
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
36
​Canadian Engineering Shortages
According to a new Engineers Canada labour market projection report,there are currently labour shortages in a number of engineering occupations,particularly civil,mechanical,electrical,and electronic engineers,as well as a shortage of computer engineers at both the provincial and national levels.Occupation data sourced from the Canadian National Household Survey and the Canadian Labour Force Survey indicate that engineering occupations' employment and wages are increasing faster than in other occupations.Unemployment is very low,less than one percent for many engineering occupations,relative to historical data and to other occupation data.Replacement demand for engineers will be particularly relevant over the next decade as the baby boom generation retires.Economic activity is generating a stronger demand for engineers in Western Canada than in Eastern Canada.

Out of the fourteen different engineering occupations,the forecast for civil engineers is particularly high.It is projected that there will be an average of 2 500 job openings for civil engineers annually over the next five years.Growth in industries that employ civil engineers will generate about 1 000 of these openings each year.Another 1 500 of these job openings will be related to the replacement of retiring workers,given the high average age of 48 years old for civil engineers.

What would be the most effective strategy to deal with the engineering shortages?

A) utilize job sharing arrangements
B) increase engineering school graduates
C) use flexible contract arrangements
D) use internal transfers
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
37
A deficiency of the Delphi technique is that the results cannot be verified statistically.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
38
Canadian Engineering Shortages
According to a new Engineers Canada labour market projection report,there are currently labour shortages in a number of engineering occupations,particularly civil,mechanical,electrical,and electronic engineers,as well as a shortage of computer engineers at both the provincial and national levels.Occupation data sourced from the Canadian National Household Survey and the Canadian Labour Force Survey indicate that engineering occupations' employment and wages are increasing faster than in other occupations.Unemployment is very low,less than one percent for many engineering occupations,relative to historical data and to other occupation data.Replacement demand for engineers will be particularly relevant over the next decade as the baby boom generation retires.Economic activity is generating a stronger demand for engineers in Western Canada than in Eastern Canada.

Out of the fourteen different engineering occupations,the forecast for civil engineers is particularly high.It is projected that there will be an average of 2 500 job openings for civil engineers annually over the next five years.Growth in industries that employ civil engineers will generate about 1 000 of these openings each year.Another 1 500 of these job openings will be related to the replacement of retiring workers,given the high average age of 48 years old for civil engineers.
What would you call the process described in this scenario?

A) strategic human resource management
B) human resource planning
C) linking human resource management with strategic planning
D) human resource supply techniques
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
39
A regression analysis is a form of time series design that uses the data from the current year (period)to predict next year's (period's)demand,reflecting a linear relationship.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
40
According to the textbook,when the Delphi technique was used to identify competencies for research chef,which of the following was NOT a topic for consideration?

A) factors that differentiate successful from unsuccessful research chefs
B) years of experience for successful and unsuccessful research chefs
C) skills and knowledge needed to be a successful research chef
D) tasks that differentiate a successful research chef from an ordinary chef
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
41
​Canadian Engineering Shortages
According to a new Engineers Canada labour market projection report,there are currently labour shortages in a number of engineering occupations,particularly civil,mechanical,electrical,and electronic engineers,as well as a shortage of computer engineers at both the provincial and national levels.Occupation data sourced from the Canadian National Household Survey and the Canadian Labour Force Survey indicate that engineering occupations' employment and wages are increasing faster than in other occupations.Unemployment is very low,less than one percent for many engineering occupations,relative to historical data and to other occupation data.Replacement demand for engineers will be particularly relevant over the next decade as the baby boom generation retires.Economic activity is generating a stronger demand for engineers in Western Canada than in Eastern Canada.

Out of the fourteen different engineering occupations,the forecast for civil engineers is particularly high.It is projected that there will be an average of 2 500 job openings for civil engineers annually over the next five years.Growth in industries that employ civil engineers will generate about 1 000 of these openings each year.Another 1 500 of these job openings will be related to the replacement of retiring workers,given the high average age of 48 years old for civil engineers.

What do the Canadian National Household Survey and the Canadian Labour Force Survey reports attempt to do?

A) predict the future demand and supply for a wide variety of Canadian occupations
B) predict the future demand growth for a wide variety of Canadian occupations
C) estimate the future demand and supply for Canadian workers
D) predict the future demand and supply for Canadian engineering workers
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
42
Typically,how is most of the expert information gathered using the Delphi technique?

A) interviews
B) discussion groups
C) teleconferencing
D) questionnaires
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
43
What type of analysis presupposes that a linear relationship exists between sales and the number of employees?

A) ratio
B) multivariate
C) trend
D) regression
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
44
​Canadian Engineering Shortages
According to a new Engineers Canada labour market projection report,there are currently labour shortages in a number of engineering occupations,particularly civil,mechanical,electrical,and electronic engineers,as well as a shortage of computer engineers at both the provincial and national levels.Occupation data sourced from the Canadian National Household Survey and the Canadian Labour Force Survey indicate that engineering occupations' employment and wages are increasing faster than in other occupations.Unemployment is very low,less than one percent for many engineering occupations,relative to historical data and to other occupation data.Replacement demand for engineers will be particularly relevant over the next decade as the baby boom generation retires.Economic activity is generating a stronger demand for engineers in Western Canada than in Eastern Canada.

Out of the fourteen different engineering occupations,the forecast for civil engineers is particularly high.It is projected that there will be an average of 2 500 job openings for civil engineers annually over the next five years.Growth in industries that employ civil engineers will generate about 1 000 of these openings each year.Another 1 500 of these job openings will be related to the replacement of retiring workers,given the high average age of 48 years old for civil engineers.
The situation described in this scenario can be referred to as a tight labour market.What occurs in a tight labour market?

A) The supply of labour exceeds the demand for labour.
B) Labour supply and demand creates tension in the labour market.
C) The demand for labour exceeds the supply of labour.
D) Supply and demand create labour shortages.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
45
The Oakland Athletics baseball team used statistical cause-and-effect models for HR planning.What do cause-and-effect models assume?

A) that there is an ongoing relationship between independent and dependent variables
B) that the extrapolated trends will influence future supply and demand
C) that the time horizon used for the models is most conducive to short-term forecasts
D) that the subjective judgment of experts supports the forecasts
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
46
An organization is using multiple predictor estimates of the future demand for human resources based on a variety of differing assumptions about how future events will unfold.What type of forecasting technique or analysis is it using?

A) Delphi technique
B) nominal technique
C) impact analysis
D) scenario forecast
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
47
If HR specialists use multiple predictor estimates of the future demand for personnel based on a variety of differing assumptions about how future events will unfold,what type of forecasting technique or analysis are they using?

A) Delphi technique
B) nominal technique
C) impact analysis
D) scenario forecast
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
48
What stage in the nominal group technique would typically ask a question like,"What will ABC Corporation's demand for production workers be in the year 2017?"

A) select the experts
B) meet face to face
C) define the question
D) discuss demand estimates
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
49
What type of analysis reveals the historical relationship between the operational index and the demand for labour?

A) correlation
B) multivariate
C) trend
D) regression
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
50
What would be two human resource quantitative forecasting demand techniques?

A) regression analysis and trend projection techniques
B) extrapolation and transition matrices techniques
C) indexation and replacement chart techniques
D) budget analysis and skills inventory techniques
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
51
In the Delphi technique,why do the experts NOT meet face-to-face?

A) They do not have the time.
B) They want to lower costs.
C) They worry about groupthink.
D) They lack communication expertise.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
52
Tiger Boots,a footwear retailer,is currently determining its HR demand using ratio analysis.What would be a key operational index used by Tiger Boots in a ratio analysis?

A) sales level
B) human resources
C) clients served
D) production hours
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
53
What would be two human resource qualitative forecasting demand techniques?

A) regression analysis and trend/ratio analysis techniques
B) extrapolation and transition matrices techniques
C) scenario planning and nominal group techniques
D) budget analysis and skills inventory techniques
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
54
What would be the first step in HR forecasting once an organization has identified its organizational goals,objectives,and plans?

A) to examine data from a variety of perspectives
B) to determine the overall demand requirements for personnel (i.e. ,what staff are needed,when,and where)
C) to assess in-house skills and other internal supply characteristics
D) to determine the net demand requirements that must be met from external environmental supply sources
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
55
What method of estimating HR demand extrapolates historical organizational indices to forecast future personnel needs?

A) trend analysis
B) ratio analysis
C) cohort analysis
D) impact analysis
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
56
Which forecasting technique provides a long-run qualitative forecast where experts meet and give their assessments about the future?

A) Delphi technique
B) critical incident technique
C) repatriation technique
D) nominal group technique
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
57
Which of the following is NOT typically considered to be an expert for HR forecasting?

A) union staff members
B) line employees
C) university researchers
D) business consultants
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
58
What is the most common operational index used by organizations in a trend analysis?

A) sales level
B) units produced
C) clients served
D) production hours
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
59
Which of the following is NOT considered a benefit of the nominal group technique?

A) supports brainstorming
B) lower costs and time
C) equal participation
D) reliable and valid
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
60
An organization wants to determine its total HR demand requirement for operational or short-run time periods.What would be the best way to gather this information?

A) use staffing tables
B) use Markov analysis
C) use impact analysis
D) use scenario forecasts
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
61
What is envelope/scenario forecasting? Describe some of its features.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
62
​Canadian Engineering Shortages
According to a new Engineers Canada labour market projection report,there are currently labour shortages in a number of engineering occupations,particularly civil,mechanical,electrical,and electronic engineers,as well as a shortage of computer engineers at both the provincial and national levels.Occupation data sourced from the Canadian National Household Survey and the Canadian Labour Force Survey indicate that engineering occupations' employment and wages are increasing faster than in other occupations.Unemployment is very low,less than one percent for many engineering occupations,relative to historical data and to other occupation data.Replacement demand for engineers will be particularly relevant over the next decade as the baby boom generation retires.Economic activity is generating a stronger demand for engineers in Western Canada than in Eastern Canada.

Out of the fourteen different engineering occupations,the forecast for civil engineers is particularly high.It is projected that there will be an average of 2 500 job openings for civil engineers annually over the next five years.Growth in industries that employ civil engineers will generate about 1 000 of these openings each year.Another 1 500 of these job openings will be related to the replacement of retiring workers,given the high average age of 48 years old for civil engineers.

The growth in demand for civil engineering occupations has been strong due to the rising needs associated with the high number of retiring workers.Although countless challenges influence the demand for engineering professionals,what is the primary cause of demand in this case?

A) external factors
B) demographic factors
C) labour market factors
D) organizational factors
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
63
​Canadian Engineering Shortages
According to a new Engineers Canada labour market projection report,there are currently labour shortages in a number of engineering occupations,particularly civil,mechanical,electrical,and electronic engineers,as well as a shortage of computer engineers at both the provincial and national levels.Occupation data sourced from the Canadian National Household Survey and the Canadian Labour Force Survey indicate that engineering occupations' employment and wages are increasing faster than in other occupations.Unemployment is very low,less than one percent for many engineering occupations,relative to historical data and to other occupation data.Replacement demand for engineers will be particularly relevant over the next decade as the baby boom generation retires.Economic activity is generating a stronger demand for engineers in Western Canada than in Eastern Canada.

Out of the fourteen different engineering occupations,the forecast for civil engineers is particularly high.It is projected that there will be an average of 2 500 job openings for civil engineers annually over the next five years.Growth in industries that employ civil engineers will generate about 1 000 of these openings each year.Another 1 500 of these job openings will be related to the replacement of retiring workers,given the high average age of 48 years old for civil engineers.
Indicators suggest that the demand for engineering occupations currently exceeds supply at the provincial and national levels.What is this estimate of demand and supply called?

A) strategic human resource management
B) human resource planning
C) human resource estimating techniques
D) human resource forecasting techniques
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
64
What do you call the observed relationship between the independent and dependent variables?

A) causal
B) direct
C) linear
D) indirect
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
65
Analyze Case Incident: "Canadian Engineering Shortages." Using the information you know about forecasting HR demand,what advice would you offer to Engineers Canada to address the replacement demand for engineers over the next decade
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
66
There are six steps associated with the Delphi technique for HR demand forecasting.What is the first step?

A) identify the experts,terms,and time horizon
B) issue the first round of questionnaires
C) select the experts
D) define and refine the issue or question
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
67
According to the textbook,what is one disadvantage of the Delphi technique?

A) groupthink
B) shyness
C) time and costs
D) communication
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
68
Which of the following demand forecasting methods is NOT a quantitative method?

A) trend analysis
B) Delphi technique
C) regression analysis
D) staffing table
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
69
Describe what an "expert" demand forecast is and list five different types of experts who could be involved.Identify and describe two different types of expert forecasting methods.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
70
Describe how HR Budgets and staffing tables are applied in HR demand forecasting.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
71
When trying to forecast the number of employee hours required for work in a retail store during December,the HR planner used last December's ratio of total sales to total hours worked as the basis for an estimate for the current year's needs.What forecasting model is the HR planner using to predict future HR demand?

A) times series model
B) regression model
C) projection model
D) production model
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
72
What are some the advantages and disadvantages of the Delphi technique,where experts do NOT meet face-to-face?
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
73
Which forecasting technique would an organization use if it wanted to conduct a long-run qualitative forecast in which experts meet and give their assessments about the future?

A) Delphi technique
B) critical incident technique
C) repatriation technique
D) nominal group technique
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
74
​Canadian Engineering Shortages
According to a new Engineers Canada labour market projection report,there are currently labour shortages in a number of engineering occupations,particularly civil,mechanical,electrical,and electronic engineers,as well as a shortage of computer engineers at both the provincial and national levels.Occupation data sourced from the Canadian National Household Survey and the Canadian Labour Force Survey indicate that engineering occupations' employment and wages are increasing faster than in other occupations.Unemployment is very low,less than one percent for many engineering occupations,relative to historical data and to other occupation data.Replacement demand for engineers will be particularly relevant over the next decade as the baby boom generation retires.Economic activity is generating a stronger demand for engineers in Western Canada than in Eastern Canada.

Out of the fourteen different engineering occupations,the forecast for civil engineers is particularly high.It is projected that there will be an average of 2 500 job openings for civil engineers annually over the next five years.Growth in industries that employ civil engineers will generate about 1 000 of these openings each year.Another 1 500 of these job openings will be related to the replacement of retiring workers,given the high average age of 48 years old for civil engineers.

What human resource technique is being used to gather the data for the Engineers Canada labour market projection report?

A) human resource occupational planning
B) human resource Markov analysis
C) human resource audits
D) human resource forecasting
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
75
What technique should be used if you want all the participants to have equal participation in the sessions and to minimize dominance,personal attacks,and defensive behaviour?

A) Delphi technique
B) critical incident technique
C) repatriation technique
D) nominal group technique
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
76
In the Delphi technique,why does the project coordinator continue to issue questionnaires to the experts?

A) Current information has not been optimal,and so further information is required.
B) Additional information still needs to be gathered regarding the predetermined questions.
C) Information gathered to date has not led the group to make a consensual decision.
D) Current information is insufficient in some way that is required to make future supply estimates.
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
77
An organization wants to determine the total HR demand requirement for long-run time periods.What would be the best way to gather this information?

A) use staffing tables
B) use movement analysis
C) use impact analysis
D) use scenario forecasts
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
78
What is another name for the dependent variable in the simple regression prediction model?

A) causal variable
B) target variable
C) linear variable
D) random variable
Unlock Deck
Unlock for access to all 78 flashcards in this deck.
Unlock Deck
k this deck
locked card icon
Unlock Deck
Unlock for access to all 78 flashcards in this deck.