Deck 8: Concrete Form Construction
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Question
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/30
Play
Full screen (f)
Deck 8: Concrete Form Construction
1
Any water used to make concrete should be clean and even drinkable.
True
2
In tropical climates, footings must be placed as much as 6 feet below the surface.
False
3
All weather-wood foundations are made of pressure-treated lumber and plywood.
True
4
The ____ for a foundation provides a base on which to spread the load of a structure over a wider area of the soil.
A)forms
B)frame
C)superstructure
D)footing
A)forms
B)frame
C)superstructure
D)footing
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
5
Where necessary, to prevent heat loss through the floor and foundation walls, ____made of extruded polystyrene is installed under the concrete slab.
A)a vapor barrier
B)rigid insulation
C)a seal
D)tarpaulin
A)a vapor barrier
B)rigid insulation
C)a seal
D)tarpaulin
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
6
____ are materials added to a concrete mix to achieve certain desired qualities.
A)Aggregates
B)Admixtures
C)Particulates
D)Condensates
A)Aggregates
B)Admixtures
C)Particulates
D)Condensates
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
7
A combined slab and foundation/footing is called a ____.
A)slab-on-grade
B)complex slab
C)joint slab
D)monolithic slab
A)slab-on-grade
B)complex slab
C)joint slab
D)monolithic slab
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
8
Concrete has high compressive strength.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
9
Form panels are built of special form plywood backed by metal ribs or 2 * 4 ____.
A)studs
B)beams
C)blocks
D)anchors
A)studs
B)beams
C)blocks
D)anchors
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
10
The ____ line is the point below the surface to which the ground usually freezes in winter.
A)plumb
B)frost
C)water
D)boundary
A)plumb
B)frost
C)water
D)boundary
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
11
Ready-mix concrete is sold by the square yard.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
12
____ is a mixture of Portland cement, fine and coarse aggregates, water, and various admixtures.
A)Plaster
B)Grout
C)Asphalt
D)Concrete
A)Plaster
B)Grout
C)Asphalt
D)Concrete
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
13
Slump tests are done to determine the proper mixture of ingredients before placing concrete.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
14
Rise is the vertical distance of a step, the height of each step.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
15
Precast concrete foundations sections are set by a crane and then bolted together.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
16
Most concrete used in construction is ____ concrete delivered to the job in a large truck.
A)precast
B)prefabricated
C)ready-mixed
D)cast-and-pour
A)precast
B)prefabricated
C)ready-mixed
D)cast-and-pour
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
17
Concrete wall forms have more stress in the middle than they do at the top and bottoms.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
18
The purpose of a(n) ____ is to provide a lock between the footing and the foundation wall.
A)groove
B)channel
C)keyway
D)interface
A)groove
B)channel
C)keyway
D)interface
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
19
Form boards need to be accurately cut to length.
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
20
The footing width is usually ____ the wall thickness and the footing depth is often equal to the wall thickness.
A)twice
B)three times
C)four times
D)six times
A)twice
B)three times
C)four times
D)six times
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
21
Protect concrete from freezing for a minimum of ____ after being placed by providing insulation or artificial heat, if necessary.
A)3 hours
B)4 hours
C)4 days
D)4 weeks
A)3 hours
B)4 hours
C)4 days
D)4 weeks
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
22
____ are doubled 2 * 4 pieces with spaces between them used to stiffen wall forms.
A)Snap ties
B)Walers
C)Tie rods
D)Expansion joints
A)Snap ties
B)Walers
C)Tie rods
D)Expansion joints
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
23
____ tests are made by inspectors on the job to determine the consistency of concrete.
A)Aggregate
B)Cement ratio
C)Slump
D)Admixture
A)Aggregate
B)Cement ratio
C)Slump
D)Admixture
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
24
Most concrete masonry units (CMUs) are called ____, which have the familiar shape of a CMU.
A)corner blocks
B)sash blocks
C)extenders
D)stretchers
A)corner blocks
B)sash blocks
C)extenders
D)stretchers
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
25
If concrete is moist-cured for 7 days, its strength is up to about ____ percent of full strength.
A)60
B)75
C)85
D)95
A)60
B)75
C)85
D)95
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
26
______ strength is the quality of being resistant to breaking under a pulling force.
A)Tensile
B)Compressive
C)Reinforcing
D)Rebar
A)Tensile
B)Compressive
C)Reinforcing
D)Rebar
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
27
Steel reinforcing bars, called rebars, are used in concrete to increase its ____.
A)compressive strength
B)tensile strength
C)heat resistance
D)moisture resistance
A)compressive strength
B)tensile strength
C)heat resistance
D)moisture resistance
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
28
A rigid foam forming system called insulated concrete forms (ICFs) uses ____-inch thick expanded polystyrene.
A)1
B)2
C)3
D)4
A)1
B)2
C)3
D)4
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
29
To determine the number of cubic yards of concrete needed for a job, find the number of cubic feet and divide by ____.
A)3
B)9
C)12
D)27
A)3
B)9
C)12
D)27
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck
30
Metric rebars are measured in ____.
A)millimeters
B)centimeters
C)decimeters
D)meters
A)millimeters
B)centimeters
C)decimeters
D)meters
Unlock Deck
Unlock for access to all 30 flashcards in this deck.
Unlock Deck
k this deck