In which SDLC phase are changes made to a system to fix or enhance its functionality?

A)Design
B)Planning
C)Analysis
D)Maintenance
Use Space or
up arrow
down arrow
to flip the card.
Question
In which maintenance type are changes made to a system to evolve its functionality to changing business needs or technologies?

A)Adaptive
B)Corrective
C)Perfective
D)Preventive
Question
As with the initial development of the system,implemented changes are formally reviewed and not tested before installation into operational systems.
Question
In which maintenance type are changes made to a system to add new features or to improve performance?

A)Adaptive
B)Corrective
C)Perfective
D)Preventive
Question
Which SDLC phase is analogous to the maintenance process of obtaining a maintenance request?

A)Design
B)Planning
C)Analysis
D)Maintenance
Question
Contrary to corrective maintenance,________ maintenance is generally a small part of an organization's maintenance effort,but it adds value to the organization.

A)Adaptive
B)Corrective
C)Perfective
D)Preventive
Question
Once a maintenance request is received,________ must be conducted to gain an understanding of the scope of the request.

A)Design
B)Planning
C)Analysis
D)Maintenance
Question
The maintenance phase is the ________ phase of the systems development life cycle.

A)First
B)Last
C)Third
D)Fourth
Question
In the maintenance phase,the systems development group is responsible for collecting maintenance requests from the network management staff.
Question
Implementing changes and designing changes are not major maintenance activities.
Question
When ________ maintenance problems surface,they are typically urgent and need to be resolved to curtail possible interruptions in normal business activities.

A)Adaptive
B)Corrective
C)Perfective
D)Preventive
Question
Most companies have some sort of document like a(n)________ to request new development,to report problems,or to request new features within an existing system.

A)User document
B)System Service Request
C)Installation guide
D)System document
Question
Which maintenance adds little or no value to the organization and simply focuses on removing defects from an existing system without adding new functionality?

A)Adaptive
B)Corrective
C)Perfective
D)Preventive
Question
Which activity in the maintenance phase requires that a formal process be established whereby users can submit system change requests?

A)Obtaining maintenance requests
B)Transforming requests into changes
C)Implementing changes
D)Designing changes
Question
Of all types of maintenance,which maintenance accounts for as much as 75 percent of all maintenance activity according to Andrews and Leventhal?

A)Adaptive
B)Corrective
C)Perfective
D)Preventive
Question
________ maintenance is usually less urgent than corrective maintenance because business and technical changes typically occur over some period of time.

A)Adaptive
B)Corrective
C)Perfective
D)Preventive
Question
Which maintenance involves making enhancements to improve processing performance or interface usability or to add desired,but not necessarily required,system features?

A)Adaptive
B)Corrective
C)Perfective
D)Preventive
Question
Which process can begin soon after the system is installed?

A)Design
B)Planning
C)Analysis
D)Maintenance
Question
Once an information system is installed,the system is essentially in which phase of the systems development life cycle (SDLC)?

A)Design
B)Planning
C)Analysis
D)Maintenance
Question
In which maintenance type are changes made to a system to repair flaws in its design,coding,or implementation?

A)Adaptive
B)Corrective
C)Perfective
D)Preventive
Question
Adaptive,perfective,and preventive maintenance activities can lead to ________ maintenance activities if not carefully designed and implemented.

A)Adaptive
B)Corrective
C)Perfective
D)Preventive
Question
Contrary to corrective maintenance,adaptive maintenance is generally the largest part of an organization's maintenance effort,but it does not add value to the organization.
Question
How can one distinguish between development and maintenance?
Question
Maintainability is the ease with which ________ can be understood,corrected,adapted,and enhanced.

A)Error
B)Network
C)Hardware
D)Software
Question
Adaptive maintenance is usually less urgent than corrective maintenance because business and technical changes typically occur over some period of time.
Question
According to Nash,the standard cost of maintenance for most ERP vendors is ________ percent annually.

A)15
B)48
C)22
D)63
Question
List the four types of maintenance.
Question
In perfective maintenance,changes are made to a system to add new features or to improve performance.
Question
Which maintenance involves changes made to a system to reduce the chance of future system failure?

A)Adaptive
B)Corrective
C)Perfective
D)Preventive
Question
In situations where a company has not developed its systems in-house but instead has licensed software,as in the case of ERP systems,maintenance costs remain ________.

A)High
B)Low
C)Same
D)Negligible
Question
Once a maintenance request is received,design must be conducted to gain an understanding of the scope of the request.
Question
When corrective maintenance problems surface,they are typically urgent and need to be resolved to curtail possible interruptions in normal business activities.
Question
What are the four major activities that occur within maintenance?
Question
A new system is developed when there is a change in the hardware or software platform or when fundamental assumptions and properties of the data,logic,or process models change.
Question
In corrective maintenance,changes are made to a system to evolve its functionality to changing business needs or technologies.
Question
Perfective maintenance involves making enhancements to improve processing performance or interface usability or to add desired,but not necessarily required,system features.
Question
Many systems professionals feel that ________ maintenance is not really maintenance but rather new development.

A)Adaptive
B)Corrective
C)Perfective
D)Preventive
Question
Systems with ________ maintainability result in uncontrollable maintenance expenses.

A)High
B)Low
C)Medium
D)Negligible
Question
Because the maintenance phase of the SDLC is basically a subset of the activities of the entire development process,the deliverables and outcomes from the process are the development of a new version of the software and new versions of all design documents developed or modified during the maintenance process.
Question
Preventive maintenance adds little or no value to the organization and it simply focuses on removing defects from an existing system without adding new functionality.
Question
MTBF stands for ________.

A)Maintenance time between failures
B)Mean time between failures
C)Medium time between failures
D)Maintainability time between failures
Question
High-quality documentation leads to a(n)________ percent reduction in the system maintenance effort when compared with average-quality documentation.

A)50
B)60
C)70
D)80
Question
"Personnel has a vested interest in effectively maintaining the system and has a better understanding of functional requirements" is an advantage of which maintenance organizational structure?

A)Separate
B)Non-functional
C)Combined
D)Functional
Question
Over the life of a system,corrective maintenance is most likely to occur after initial system installation or after major system changes.This means that adaptive,perfective,and preventive maintenance activities can lead to corrective maintenance activities if not carefully designed and implemented.
Question
What is maintainability? Identify several factors that influence the maintainability of a system.
Question
There are various types of maintenance requests-some correct minor or severe defects in the systems,whereas others improve or extend system functionality.
Question
"Personnel may have limited job mobility and lack access to adequate human and technical resources" is a disadvantage of combined maintenance organizational structures.
Question
Number of failures is one of the factors for measuring maintenance effectiveness.
Question
"All things cannot be documented,so the maintenance group may not know critical information about the system" is a disadvantage of which maintenance organizational structure?

A)Separate
B)Non-functional
C)Combined
D)Functional
Question
Tools that can automatically generate new code based on system specification changes can dramatically ________ maintenance time and costs.

A)Increase
B)Reduce
C)Stop
D)Start
Question
MTBF is a measurement of ________ occurrences that can be tracked over time to indicate the quality of a system.

A)Maintenance
B)Quality
C)Effort
D)Error
Question
Measuring the number of and time between failures will provide you with the basis to calculate a widely used measure of system quality.This metric is referred to as ________.

A)Mean time between failures
B)Maintenance time between failures
C)Medium time between failures
D)Maintainability time between failures
Question
"Documentation and testing thoroughness may suffer due to a lack of a formal transfer of responsibility" is a disadvantage of which maintenance organizational structure?

A)Separate
B)Non-functional
C)Combined
D)Functional
Question
"Maintenance group knows or has access to all assumptions and decisions behind the system's original design" is an advantage of which maintenance organizational structure?

A)Separate
B)Non-functional
C)Combined
D)Functional
Question
Quality documentation makes it easier to find code that needs to be changed and to understand how the code needs to be changed,and good documentation also explains why a system does what it does and why alternatives were not feasible,which saves wasted maintenance efforts.
Question
Which maintainability factor specifies the number of unknown errors existing in the system after it is installed?

A)Latent defects
B)Number of customers
C)Quality of system documentation
D)Maintenance personnel
Question
What are the factors that influence maintainability of a system? Which ones are the most significant?
Question
"Formal transfer of systems between groups improves the system and documentation quality" is an advantage of which maintenance organizational structure?

A)Separate
B)Non-functional
C)Combined
D)Functional
Question
"Personnel may have limited job mobility and lack access to adequate human and technical resources" is a disadvantage of which maintenance organizational structure?

A)Separate
B)Non-functional
C)Combined
D)Functional
Question
Time between each failure and type of failure are never helpful for measuring maintenance effectiveness.
Question
________ is/are needed to construct any version of the system that has ever existed.

A)Change requests
B)Build routines
C)Baseline modules
D)Configuration management
Question
The process of ensuring that only authorized changes are made to a system is known as ________.

A)Change request
B)Build routines
C)Baseline modules
D)Configuration management
Question
Who is responsible for keeping copies of all prior versions of all system modules,including the build routines?

A)System Priority Board
B)Librarian
C)Project manager
D)Organization
Question
Automated tools that read program source code as input; perform an analysis of the program's data and logic; and then automatically,or interactively with a systems analyst,alter an existing system in an effort to improve its quality or performance are known as ________.

A)Reverse engineering
B)Reengineering
C)Performance engineering
D)Designing
Question
________ tools allow one to trace an executable code module back to its original source code version,greatly speeding the identification of programming errors.

A)Change request
B)Build routines
C)Baseline modules
D)Configuration management
Question
It may be necessary to ________ a Web site with search engines when the content of the site changes significantly.

A)Update
B)Configure
C)Reregister
D)HTML validate
Question
Before modified or new pages are published,pages should be processed by a code validation routine to ensure that all the code,including applets,works.This is known as _________.

A)HTML validation
B)Reregistration
C)Broken link check
D)Future edition
Question
Before any code can be checked back in to the librarian,the code must pass the quality control procedures,testing,and documentation standards established by the ________.

A)Librarian
B)Maintenance personnel
C)Project manager
D)Organization
Question
Automated tools that read program source code as input and create graphical and textual representations of design-level information such as program control structures,data structures,logical flow,and data flow are known as ________.

A)Reverse engineering
B)Reengineering
C)Performance engineering
D)Designing
Question
Who is responsible for controlling the checking out and checking in of baseline modules for a system when a system is being developed or maintained?

A)System Librarian
B)System Priority Board
C)Maintenance Staff
D)Project Manager
Question
A primary objective of using automated tools for systems development and maintenance is to radically change the way in which ________ and documentation are modified and updated.

A)Test plan
B)Code
C)Software
D)Functionality
Question
If the MTBF does not rapidly ________ over time,it will be a signal to management that major problems exist within the system that are not being adequately resolved through the maintenance process.

A)Increase
B)Decrease
C)Slow
D)Stop
Question
________ is/are the guidelines that list the instructions to construct an executable system from the baseline source code.

A)Change request
B)Build routines
C)Baseline modules
D)Configuration management
Question
Who receives the maintenance request when an organizational group that uses the system will make a request to change the system?

A)System Priority Board
B)Maintenance Staff
C)Project Manager
D)Other Groups
Question
Who categorizes and prioritizes the maintenance request in relation to both the strategic and information systems plans of the organization?

A)System Priority Board
B)Maintenance Staff
C)Project Manager
D)Other Groups
Question
When using an integrated development environment,________ maintain(s)design documents such as data flow diagrams and screen designs,not source code.

A)The testing team
B)The developer
C)Analysts
D)The project manager
Question
________ tools are those that can create a representation of a system or program module at a design level of abstraction.

A)Configuration management
B)Reengineering
C)Reverse engineering
D)Build routines
Question
Which tools have a primary benefit to create high-level design documents of a program by reading and analyzing its source code?

A)Design recovery
B)Build routines
C)Baseline modules
D)Configuration management
Question
On a periodic basis,who prepares a report of all pending tasks in the change request queue?

A)System Priority Board
B)Maintenance Staff
C)Project Manager
D)Other Groups
Question
If ________ is/are assigned to make changes to a system,they must first check out a copy of the baseline system modules since no one is allowed to directly modify the baseline modules.

A)System Priority Board
B)Maintenance personnel
C)A project manager
D)Other groups
Unlock Deck
Sign up to unlock the cards in this deck!
Unlock Deck
Unlock Deck
1/99
auto play flashcards
Play
simple tutorial
Full screen (f)
exit full mode
Deck 14: Maintaining Information Systems
1
In which SDLC phase are changes made to a system to fix or enhance its functionality?

A)Design
B)Planning
C)Analysis
D)Maintenance
D
2
In which maintenance type are changes made to a system to evolve its functionality to changing business needs or technologies?

A)Adaptive
B)Corrective
C)Perfective
D)Preventive
A
3
As with the initial development of the system,implemented changes are formally reviewed and not tested before installation into operational systems.
False
4
In which maintenance type are changes made to a system to add new features or to improve performance?

A)Adaptive
B)Corrective
C)Perfective
D)Preventive
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
5
Which SDLC phase is analogous to the maintenance process of obtaining a maintenance request?

A)Design
B)Planning
C)Analysis
D)Maintenance
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
6
Contrary to corrective maintenance,________ maintenance is generally a small part of an organization's maintenance effort,but it adds value to the organization.

A)Adaptive
B)Corrective
C)Perfective
D)Preventive
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
7
Once a maintenance request is received,________ must be conducted to gain an understanding of the scope of the request.

A)Design
B)Planning
C)Analysis
D)Maintenance
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
8
The maintenance phase is the ________ phase of the systems development life cycle.

A)First
B)Last
C)Third
D)Fourth
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
9
In the maintenance phase,the systems development group is responsible for collecting maintenance requests from the network management staff.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
10
Implementing changes and designing changes are not major maintenance activities.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
11
When ________ maintenance problems surface,they are typically urgent and need to be resolved to curtail possible interruptions in normal business activities.

A)Adaptive
B)Corrective
C)Perfective
D)Preventive
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
12
Most companies have some sort of document like a(n)________ to request new development,to report problems,or to request new features within an existing system.

A)User document
B)System Service Request
C)Installation guide
D)System document
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
13
Which maintenance adds little or no value to the organization and simply focuses on removing defects from an existing system without adding new functionality?

A)Adaptive
B)Corrective
C)Perfective
D)Preventive
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
14
Which activity in the maintenance phase requires that a formal process be established whereby users can submit system change requests?

A)Obtaining maintenance requests
B)Transforming requests into changes
C)Implementing changes
D)Designing changes
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
15
Of all types of maintenance,which maintenance accounts for as much as 75 percent of all maintenance activity according to Andrews and Leventhal?

A)Adaptive
B)Corrective
C)Perfective
D)Preventive
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
16
________ maintenance is usually less urgent than corrective maintenance because business and technical changes typically occur over some period of time.

A)Adaptive
B)Corrective
C)Perfective
D)Preventive
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
17
Which maintenance involves making enhancements to improve processing performance or interface usability or to add desired,but not necessarily required,system features?

A)Adaptive
B)Corrective
C)Perfective
D)Preventive
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
18
Which process can begin soon after the system is installed?

A)Design
B)Planning
C)Analysis
D)Maintenance
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
19
Once an information system is installed,the system is essentially in which phase of the systems development life cycle (SDLC)?

A)Design
B)Planning
C)Analysis
D)Maintenance
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
20
In which maintenance type are changes made to a system to repair flaws in its design,coding,or implementation?

A)Adaptive
B)Corrective
C)Perfective
D)Preventive
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
21
Adaptive,perfective,and preventive maintenance activities can lead to ________ maintenance activities if not carefully designed and implemented.

A)Adaptive
B)Corrective
C)Perfective
D)Preventive
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
22
Contrary to corrective maintenance,adaptive maintenance is generally the largest part of an organization's maintenance effort,but it does not add value to the organization.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
23
How can one distinguish between development and maintenance?
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
24
Maintainability is the ease with which ________ can be understood,corrected,adapted,and enhanced.

A)Error
B)Network
C)Hardware
D)Software
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
25
Adaptive maintenance is usually less urgent than corrective maintenance because business and technical changes typically occur over some period of time.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
26
According to Nash,the standard cost of maintenance for most ERP vendors is ________ percent annually.

A)15
B)48
C)22
D)63
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
27
List the four types of maintenance.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
28
In perfective maintenance,changes are made to a system to add new features or to improve performance.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
29
Which maintenance involves changes made to a system to reduce the chance of future system failure?

A)Adaptive
B)Corrective
C)Perfective
D)Preventive
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
30
In situations where a company has not developed its systems in-house but instead has licensed software,as in the case of ERP systems,maintenance costs remain ________.

A)High
B)Low
C)Same
D)Negligible
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
31
Once a maintenance request is received,design must be conducted to gain an understanding of the scope of the request.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
32
When corrective maintenance problems surface,they are typically urgent and need to be resolved to curtail possible interruptions in normal business activities.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
33
What are the four major activities that occur within maintenance?
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
34
A new system is developed when there is a change in the hardware or software platform or when fundamental assumptions and properties of the data,logic,or process models change.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
35
In corrective maintenance,changes are made to a system to evolve its functionality to changing business needs or technologies.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
36
Perfective maintenance involves making enhancements to improve processing performance or interface usability or to add desired,but not necessarily required,system features.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
37
Many systems professionals feel that ________ maintenance is not really maintenance but rather new development.

A)Adaptive
B)Corrective
C)Perfective
D)Preventive
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
38
Systems with ________ maintainability result in uncontrollable maintenance expenses.

A)High
B)Low
C)Medium
D)Negligible
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
39
Because the maintenance phase of the SDLC is basically a subset of the activities of the entire development process,the deliverables and outcomes from the process are the development of a new version of the software and new versions of all design documents developed or modified during the maintenance process.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
40
Preventive maintenance adds little or no value to the organization and it simply focuses on removing defects from an existing system without adding new functionality.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
41
MTBF stands for ________.

A)Maintenance time between failures
B)Mean time between failures
C)Medium time between failures
D)Maintainability time between failures
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
42
High-quality documentation leads to a(n)________ percent reduction in the system maintenance effort when compared with average-quality documentation.

A)50
B)60
C)70
D)80
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
43
"Personnel has a vested interest in effectively maintaining the system and has a better understanding of functional requirements" is an advantage of which maintenance organizational structure?

A)Separate
B)Non-functional
C)Combined
D)Functional
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
44
Over the life of a system,corrective maintenance is most likely to occur after initial system installation or after major system changes.This means that adaptive,perfective,and preventive maintenance activities can lead to corrective maintenance activities if not carefully designed and implemented.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
45
What is maintainability? Identify several factors that influence the maintainability of a system.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
46
There are various types of maintenance requests-some correct minor or severe defects in the systems,whereas others improve or extend system functionality.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
47
"Personnel may have limited job mobility and lack access to adequate human and technical resources" is a disadvantage of combined maintenance organizational structures.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
48
Number of failures is one of the factors for measuring maintenance effectiveness.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
49
"All things cannot be documented,so the maintenance group may not know critical information about the system" is a disadvantage of which maintenance organizational structure?

A)Separate
B)Non-functional
C)Combined
D)Functional
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
50
Tools that can automatically generate new code based on system specification changes can dramatically ________ maintenance time and costs.

A)Increase
B)Reduce
C)Stop
D)Start
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
51
MTBF is a measurement of ________ occurrences that can be tracked over time to indicate the quality of a system.

A)Maintenance
B)Quality
C)Effort
D)Error
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
52
Measuring the number of and time between failures will provide you with the basis to calculate a widely used measure of system quality.This metric is referred to as ________.

A)Mean time between failures
B)Maintenance time between failures
C)Medium time between failures
D)Maintainability time between failures
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
53
"Documentation and testing thoroughness may suffer due to a lack of a formal transfer of responsibility" is a disadvantage of which maintenance organizational structure?

A)Separate
B)Non-functional
C)Combined
D)Functional
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
54
"Maintenance group knows or has access to all assumptions and decisions behind the system's original design" is an advantage of which maintenance organizational structure?

A)Separate
B)Non-functional
C)Combined
D)Functional
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
55
Quality documentation makes it easier to find code that needs to be changed and to understand how the code needs to be changed,and good documentation also explains why a system does what it does and why alternatives were not feasible,which saves wasted maintenance efforts.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
56
Which maintainability factor specifies the number of unknown errors existing in the system after it is installed?

A)Latent defects
B)Number of customers
C)Quality of system documentation
D)Maintenance personnel
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
57
What are the factors that influence maintainability of a system? Which ones are the most significant?
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
58
"Formal transfer of systems between groups improves the system and documentation quality" is an advantage of which maintenance organizational structure?

A)Separate
B)Non-functional
C)Combined
D)Functional
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
59
"Personnel may have limited job mobility and lack access to adequate human and technical resources" is a disadvantage of which maintenance organizational structure?

A)Separate
B)Non-functional
C)Combined
D)Functional
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
60
Time between each failure and type of failure are never helpful for measuring maintenance effectiveness.
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
61
________ is/are needed to construct any version of the system that has ever existed.

A)Change requests
B)Build routines
C)Baseline modules
D)Configuration management
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
62
The process of ensuring that only authorized changes are made to a system is known as ________.

A)Change request
B)Build routines
C)Baseline modules
D)Configuration management
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
63
Who is responsible for keeping copies of all prior versions of all system modules,including the build routines?

A)System Priority Board
B)Librarian
C)Project manager
D)Organization
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
64
Automated tools that read program source code as input; perform an analysis of the program's data and logic; and then automatically,or interactively with a systems analyst,alter an existing system in an effort to improve its quality or performance are known as ________.

A)Reverse engineering
B)Reengineering
C)Performance engineering
D)Designing
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
65
________ tools allow one to trace an executable code module back to its original source code version,greatly speeding the identification of programming errors.

A)Change request
B)Build routines
C)Baseline modules
D)Configuration management
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
66
It may be necessary to ________ a Web site with search engines when the content of the site changes significantly.

A)Update
B)Configure
C)Reregister
D)HTML validate
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
67
Before modified or new pages are published,pages should be processed by a code validation routine to ensure that all the code,including applets,works.This is known as _________.

A)HTML validation
B)Reregistration
C)Broken link check
D)Future edition
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
68
Before any code can be checked back in to the librarian,the code must pass the quality control procedures,testing,and documentation standards established by the ________.

A)Librarian
B)Maintenance personnel
C)Project manager
D)Organization
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
69
Automated tools that read program source code as input and create graphical and textual representations of design-level information such as program control structures,data structures,logical flow,and data flow are known as ________.

A)Reverse engineering
B)Reengineering
C)Performance engineering
D)Designing
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
70
Who is responsible for controlling the checking out and checking in of baseline modules for a system when a system is being developed or maintained?

A)System Librarian
B)System Priority Board
C)Maintenance Staff
D)Project Manager
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
71
A primary objective of using automated tools for systems development and maintenance is to radically change the way in which ________ and documentation are modified and updated.

A)Test plan
B)Code
C)Software
D)Functionality
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
72
If the MTBF does not rapidly ________ over time,it will be a signal to management that major problems exist within the system that are not being adequately resolved through the maintenance process.

A)Increase
B)Decrease
C)Slow
D)Stop
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
73
________ is/are the guidelines that list the instructions to construct an executable system from the baseline source code.

A)Change request
B)Build routines
C)Baseline modules
D)Configuration management
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
74
Who receives the maintenance request when an organizational group that uses the system will make a request to change the system?

A)System Priority Board
B)Maintenance Staff
C)Project Manager
D)Other Groups
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
75
Who categorizes and prioritizes the maintenance request in relation to both the strategic and information systems plans of the organization?

A)System Priority Board
B)Maintenance Staff
C)Project Manager
D)Other Groups
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
76
When using an integrated development environment,________ maintain(s)design documents such as data flow diagrams and screen designs,not source code.

A)The testing team
B)The developer
C)Analysts
D)The project manager
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
77
________ tools are those that can create a representation of a system or program module at a design level of abstraction.

A)Configuration management
B)Reengineering
C)Reverse engineering
D)Build routines
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
78
Which tools have a primary benefit to create high-level design documents of a program by reading and analyzing its source code?

A)Design recovery
B)Build routines
C)Baseline modules
D)Configuration management
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
79
On a periodic basis,who prepares a report of all pending tasks in the change request queue?

A)System Priority Board
B)Maintenance Staff
C)Project Manager
D)Other Groups
Unlock Deck
Unlock for access to all 99 flashcards in this deck.
Unlock Deck
k this deck
80
If ________ is/are assigned to make changes to a system,they must first check out a copy of the baseline system modules since no one is allowed to directly modify the baseline modules.

A)System Priority Board
B)Maintenance personnel
C)A project manager
D)Other groups
Unlock Deck