Optimistic time is:
A) the maximum period of time for an activity to be completed
B) the minimum period of time for an activity to be completed
C) the planner's "best guess" of the amount of time the activity actually will require for completion
D) the maximum period of time for an entire project to be completed
Correct Answer:
Verified
Q108: Slack time is equal to:
A)the difference between
Q109: Which of the following is a true
Q110: In OOSAD,iterations are normally:
A)five weeks
B)ten weeks
C)eleven weeks
D)two
Q111: What would be the estimated time for
Q112: A critical path is:
A)a sequence of activities
Q114: Pessimistic time is:
A)the maximum period of time
Q115: Which of the following is true regarding
Q116: Automated tools available to help you manage
Q117: A _ is a systems analyst with
Q118: In OOSAD,the project manager must:
A)subdivide the whole
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents