Exhibit 5-1 Sinclair Plastics Operates Two Chemical Plants Which Produce Polyethylene; the Polyethylene;
Exhibit 5-1
Sinclair Plastics operates two chemical plants which produce polyethylene; the Ohio Valley plant which can produce up to 10,000 tons per month and the Lakeview plant which can produce up to 7,000 tons per month.Sinclair sells its polyethylene to three different auto manufacturing plants,Grand Rapids (demand = 3000 tons per month),Blue Ridge (demand = 5000 tons per month),and Sunset (demand = 4000 tons per month).The costs of shipping between the respective plants is shown in the table below:

-Refer to Exhibit 5-1.Suppose the shipping capacity between any two plants was limited to 2500 tons per month.Implement a minimum cost flow network model in Solver and obtain the optimal shipping plan.How much more would the shipping plan cost Sinclair in that case?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q14: The graphical representation of a network in
Q15: In transportation problems,the three sets of input
Q22: Exhibit 5-3
Steve the auto parts salesman
Q23: Exhibit 5-1
Sinclair Plastics operates two chemical
Q24: Exhibit 5-3
Steve the auto parts salesman
Q25: A minimum cost network flow model (MCNFM)has
Q25: Exhibit 5-2
A small engineering firm employs one
Q26: Exhibit 5-3
Steve the auto parts salesman
Q27: Exhibit 5-1
Sinclair Plastics operates two chemical
Q28: Exhibit 5-2
A small engineering firm employs one
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents