In the drum-buffer-rope conceptualization used in the theory of constraints,the "drum" that sets the pace for production refers to:
A) work-in-process inventory before the bottleneck.
B) the bottleneck of the process.
C) total capacity of the process.
D) first stage in the process.
E) the master schedule.
Correct Answer:
Verified
Q48: Input/Output (I/O)control is used to:
A)increase work flows
Q49: Assigning jobs to work centres and to
Q50: Which of the following is not a
Q51: Job scheduling pertains to:
A)hiring workers.
B)capacity planning.
C)buying machinery.
D)timing
Q52: Scheduling that starts with the present time
Q54: Which of the following is the last
Q55: Assigning jobs to work centres without regard
Q56: Finite loading,as compared to infinite loading,assumes that:
A)there
Q57: The purpose of a Gantt chart is
Q58: As a performance measure in scheduling,job flow
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents