The control of the flow of work in JIT systems is best characterized as a:
A) push system.
B) pull system.
C) backward communications approach
D) inventory accumulation approach
E) neutral system
Correct Answer:
Verified
Q74: The technique intended to increase functional communications,reduce
Q75: Which of the following are benefits of
Q76: Material requirements planning (MRP)is an example of
Q77: Which of the following is not a
Q78: Which of the following are potentially negative
Q80: JIT philosophy tries to eliminate work-in-process inventory
Q81: A system of lights used at each
Q82: With regard to suppliers,JIT systems typically require:
A)delivery
Q83: A kanban card is used to signal
Q84: With regard to suppliers,JIT systems typically involve:
A)delivery
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents