The planning horizon for the master production schedule (MPS)should cover or be longer than the cumulative lead time necessary to produce the end items.
Correct Answer:
Verified
Q2: A bill of material contains a listing
Q3: Independent demand tends to be more sporadic
Q4: MRP requires information on inventory on hand,open
Q5: The MRP requires a list of the
Q6: An assembly-time chart indicates gross and net
Q8: Dependent demand tends to be intermittent,whereas independent
Q9: The planned-order releases at one level of
Q10: Gross requirements for components are equal to
Q11: MRP usually involves inventory items that have
Q12: The master production schedule (MPS)states which product