The bill of material contains information on lead times.
Correct Answer:
Verified
Q15: A master production schedule (MPS)is the principal
Q16: Dependent demand is derived demand.
Q17: For a given component in an MRP
Q18: The three basic inputs of MRP are:
Q19: Lumpy demand for components required for finished
Q21: Load reports of capacity may be misleading
Q22: Lot-for-lot ordering in MRP provides coverage for
Q23: MRP II is simply a label for
Q24: ERP packages are intended to fit established
Q25: The part-period method for lot sizing attempts