The purpose of control charts is to:
A) estimate the proportion of output that is acceptable.
B) inspect the quality of all outputs from a process.
C) determine if the output of a process is within specifications.
D) distinguish between random variation and assignable variation in a process.
Correct Answer:
Verified
Q18: A p-chart is used to monitor the
Q36: A c-chart is used to monitor the
Q37: Control charts based on attribute data are
Q38: A sample statistic that falls outside the
Q40: A c-chart is used to monitor the
Q42: The output of a process may not
Q43: A process is "capable" if the process
Q44: Six sigma quality refers to achieving process
Q45: Control limits are statistical limits that reflect
Q46: There is no direct link between design
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents