Solved

A Design Engineer Wants to Construct a Sample Mean Chart

Question 97

Multiple Choice

A design engineer wants to construct a sample mean chart for controlling the service life of one of the types of light bulbs his company produces.He knows from numerous previous samples that this service life is normally distributed with a mean of 500 hours and a standard deviation of 20 hours.On three recent production batches,he tested service life on random samples of four bulbs,with these results: A design engineer wants to construct a sample mean chart for controlling the service life of one of the types of light bulbs his company produces.He knows from numerous previous samples that this service life is normally distributed with a mean of 500 hours and a standard deviation of 20 hours.On three recent production batches,he tested service life on random samples of four bulbs,with these results:   If he uses upper and lower control limits of 520 and 480 hours,what is his risk (alpha) of concluding service life is out of control when it is actually under control (Type I error) ? A) 0.0026 B) 0.0456 C) 0.3174 D) 0.6826 E) 0.9544 If he uses upper and lower control limits of 520 and 480 hours,what is his risk (alpha) of concluding service life is out of control when it is actually under control (Type I error) ?


A) 0.0026
B) 0.0456
C) 0.3174
D) 0.6826
E) 0.9544

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents