A Methods and Measurements Analyst needs to develop a time standard for a certain task.In a preliminary study,he observed one of his employees perform this task five times,with the following results: What is the standard time (ST) for this task if the employee worked at a twenty-five percent faster pace than the average and an allowance of twenty percent of the workday is used?
A) 80 seconds
B) 96 seconds
C) 100 seconds
D) 120 seconds
E) 125 seconds
Correct Answer:
Verified
Q108: A Methods and Measurements Analyst for Timepiece,Inc.needs
Q109: A Methods and Measurement Analyst wants to
Q110: The owner of Kat Motel wants to
Q111: Which of the following plans is based
Q112: A Methods and Measurements Analyst needs to
Q114: A Methods and Measurement Analyst wants to
Q115: The owner of Kat Motel wants to
Q116: A Methods and Measurements Analyst for Timepiece,Inc.needs
Q117: A Methods and Measurements Analyst for Timepiece,Inc.needs
Q118: The owner of Kat Motel wants to
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents