The operations manager for the Blue Moon Brewing Co.produces two beers: Lite (L) and Dark (D) .Two of his resources are constrained: production time,which is limited to 8 hours (480 minutes) per day; and malt extract (one of his ingredients) ,of which he can get only 675 gallons each day.To produce a keg of Lite beer requires 2 minutes of time and 5 gallons of malt extract,while each keg of Dark beer needs 4 minutes of time and 3 gallons of malt extract.Profits for Lite beer are $3.00 per keg,and profits for Dark beer are $2.00 per keg.What is the time constraint?
A) 2 L + 3 D 480
B) 2 L + 4 D 480
C) 3 L + 2 D 480
D) 4 L + 2 D 480
E) 5 L + 3 D 480
Correct Answer:
Verified
Q10: The term range of feasibility refers to
Q27: When a change in the value of
Q36: The term "range of optimality" refers to
Q37: For the constraints given below,which point
Q40: Which of the following is not a
Q43: The operations manager for the Blue Moon
Q44: In the graphical method of linear programming,when
Q45: The production planner for Fine Coffees,Inc.produces two
Q46: The operations manager for the Blue Moon
Q70: The operations manager for the Blue Moon
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents