The operations manager for the Blue Moon Brewing Co.produces two beers: Lite (L) and Dark (D) .Two of his resources are constrained: production time,which is limited to 8 hours (480 minutes) per day; and malt extract (one of his ingredients) ,of which he can get only 675 gallons each day.To produce a keg of Lite beer requires 2 minutes of time and 5 gallons of malt extract,while each keg of Dark beer needs 4 minutes of time and 3 gallons of malt extract.Profits for Lite beer are $3.00 per keg,and profits for Dark beer are $2.00 per keg.For the production combination of 135 Lite and 0 Dark,which resource is "slack" (not fully used) ?
A) Time (only)
B) Malt extract (only)
C) Both time and malt extract
D) Neither time nor malt extract
E) Cannot be determined exactly
Correct Answer:
Verified
Q51: Which graphical solution method finds the optimal
Q52: For the constraints given below,which point is
Q53: A shadow price reflects which of the
Q54: The production planner for Fine Coffees,Inc.produces two
Q55: The production planner for Fine Coffees,Inc.produces
Q57: The production planner for Fine Coffees,Inc.produces two
Q58: The production planner for Fine Coffees,Inc.produces
Q59: What combination of x and y will
Q60: A constraint that does not form a
Q61: The owner of Crackers,Inc.produces two kinds
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents