A highway contractor needs to locate a single supply point to provide road building materials to four projects. The four projects, which are all approximately the same magnitude, are located at the following coordinates. Coordinate units are in miles.
a. On the grid below, plot the locations of the four road-building sites. Properly label all points.
b. What is the center of gravity?
c. If a single truck were sent from center-of-gravity to each project and back (four round trips), how many miles would be traveled? (Hint: use the Pythagorean Theorem C = ).
d. Add the calculated center of gravity to the grid.
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q55: What is it called when competing companies
Q72: Identify the four major quantitative methods for
Q118: How do service facility location decisions differ
Q121: The owner of a millwork shop is
Q122: A manager has received an analysis of
Q124: A small manufacturer is considering several locations
Q125: Using the factor ratings shown below, determine
Q126: A school district is considering where in
Q127: A manufacturing company is considering three expansion
Q132: A grocery chain is deciding on where
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents