Which of the following best differentiates material requirements planning (MRP) from finite capacity scheduling (FCS) ?
A) FCS recognizes the finite nature of capacity while MRP does not.
B) FCS works in services while MRP does not.
C) MRP requires time buckets while FCS does not.
D) FCS is an input into traditional MRP systems.
E) FCS uses the Wagner-Whitin algorithm while MRP uses lot-for-lot and EOQ.
Correct Answer:
Verified
Q67: In MRP, system nervousness is caused by:
A)
Q84: Material requirements plans specify
A) the quantities of
Q86: MRP II is accurately described as
A) MRP
Q87: Distribution resource planning (DRP) is
A) a transportation
Q88: Which of the following statements regarding lot-sizing
Q90: Which of the following statements regarding MRP
Q91: Which of the following is a step
Q92: The extension of MRP which extends to
Q94: For the lot-sizing technique known as lot-for-lot
Q111: If a load report (resource requirements profile)
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents