A manufacturing plant is trying to determine standard production per day for an incentive program. Suppose that the incentive program will pay $1 per unit produced above standard rates. A worker is timed at 280 seconds per unit, with a performance rating of 105%. The plant has an allowance factor of 13%. If he produces 100 units in an 8 hour shift, how much would he receive under the incentive plan?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q144: What are predetermined time standards?
Q159: List the eight steps used to develop
Q176: A work sampling study requires an acceptable
Q177: How do we establish a fair day's
Q180: What are the disadvantages of work sampling?
Q182: The data in the following table
Q183: The data in the following table
Q184: A task involves positioning two metal
Q185: What is the required sample size to
Q186: An operation in a television factory has
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents